Wednesday, October 21, 2026
MiningNewsTerminal
Wednesday, October 21, 2026 Admin

TAJ.V ·

Tajiri Enters Option Agreement to Acquire Three Gold Projects in Guyana, South America with total area of 164 square kilometres

Royalties & Streams Property Options & Staking

VANCOUVER, BRITISH COLUMBIA ‐ (March, 2nd 2017) – Tajiri Resources Corp. (the “Company”) (TSX VENTURE:TAJ)  is  pleased  to report that, subject to TSX Venture Exchange approval, it has entered into an option agreement with the Pereira Group to acquire:

  • Three Projects totalling 164 km2
  • Frenchman's Creek Mine 109 km2, Winter's Mine 32 km2 & Kanaimapu 23 km2
  • Due diligence sampling by the Company at Frenchman's Creek returned 1,270 g/t & 859 g/t Au from two separate artisanal bedrock workings
  • All Projects are associated with prolific alluvial workings indicating potential for significant primary gold source areas
  • All Projects contain historic bedrock artisanal workings which provide near drill ready targets
  • Good access to all Projects, which are situated within several kilometres of the paved Georgetown ‐ Brazil Road.
  • Low entry cost with no exploration commitment and total payments in first 3 years of USD$130,000 and issue of 1.5 million shares.

Over  the  past  several months Tajiri has been assessing projects and negotiating with Guyanese land holders  to  acquire  projects  and  expand  the  Company's  portfolio  of  gold  tenements  in  Guyana. Following  a  strategy  to  acquire  tenements  which  cover  persistent  structures,  associated  with  gold mineralisation, over regional scale strike lengths, which include previously undrilled artisinal bedrock workings.

Management  is  pleased  to  present  the  first  of  these  acquisitions  being  the  Frenchman's  Creek, Winters  Mine  and  Kanaimapu  Projects.  The  three  projects  are  all  situated  close  to  the  main  road connecting  Guyana's  capital  Georgetown  to Brazil and the projects are located between 150km and 260km south of Georgetown (see Figure 1).

Acquisition cost of the three Projects will be over five years paid as follows: USD$30,000 upon signing, USD$50,000  on  or  before  the  first  anniversary,  USD$50,000  on  or  before  the  second  anniversary, USD$425,000  on  or  before  the  third  anniversary,  and  $USD1,000,000  on  or  before  the  fourth anniversary.  The  Company  will  also  issue  1.5  million  shares  over  five years to the vendors in the amounts  of  500,000  upon  signing,  500,000  on  or before the first anniversary, 750,000 on or before the second anniversary, and 1,000,000 on or before the fourth year. The agreement provide Tajiri the right  to  acquire  100%  interest  in  all  three  Projects  while  the  Vendors  will  retain  a  2%  Net  Smelter Return.

Figure 1 Location of the Winters Mine, Kanaimapu & Frenchman's Creek Projects on topography. Note Location of Omai 3.8 Moz produced & Troy's Kaburi Project / Karouni Mine (1.6 Moz resource)

A Brief outlines of the Frenchman's Creek Project is given below and details of the Winter's Mine and Kanaimapu Project will be given in a subsequent release.

Frenchman's Creek ‐ Area 109 km2

The  Project  is  located  260km  south  of  Georgetown  and  contains  the  Pott  Falls  Mine  (operational between  1935  and  1941  with  a  10  ton  per  hour  mill‐  production  unknown)  and  the  Parrot  Pit  an artisanal pit excavated intermittently between the mid 1980s and 2011.

The  Project  also  contains  extensive  alluvial  gold  workings  which  indicate  a  potential source area of some  13  kilometres  strike  in the  northern  portion  of  the  property  which  has  shed  gold  into  the surrounding  predominantly  south  draining  creeks.  These  creeks  have  been  worked  consistently downstream  for  distances  of  between  6  and  9  kilometres  and  intermittently  since  the  early  20th Century.  The  most  recent  production  records  of  the  Vendors  demonstrate  that  between  2007  and 2010 the property produced 42,203 ounces of gold from sluicing of alluvial material on the property.

Alluvial  gold  production  from the area prior to 2007 has not been recorded but a banka drilling and pitting program, performed by the Geological Survey of Guyana in 1975, covering the alluvial flats of Frenchman's Creek produced a historic resource of 500,000 cubic yards at a grade of 0.5 grams Au per cubic yard.  Undoubtedly this resource has now been mined by artisinal producers.

Figure 2 Showing outline of the Frenchman's Creek tenements in red, overlain on a true colour satellite image.  Areas  disturbed  by  alluvial  mining  show  clearly  as light brown areas following  creeks which drain mostly southwards from the inferred gold source area shown outlined in yellow. This source area potentially  indicates  a  regional  scale  gold  bearing  structure  of  which  some  13  kilometres  strike are contained within the tenements.  The Pott falls mine is located within the inferred gold source area but the Parrot pit is not indicating the potential for other mineralised structures.

The  Project  area  geology  consist  of  NW  ‐  WNW  trending  greenstones  of  the  mid‐Proterzoic Barama‐Mazaruni Group intruded by granites and porphyries. In the south of the Project the Muruwa formation  a  relatively  undeformed  sandstone  unconformably  overlies  the  greenstones.  Regolith  in the area is variable and consists of relict lateritic soils variably covered by transported sand.

In situ mineralisation in the area is evident at the Pott Falls Mine and the Parrot Pit (see Figure 2 & 3)

The  Pott  Falls  Mine  was  active  as  an  underground  operation  with  an  installed  mill  capacity  of  10 tonnes per hour between 1935 and 1941. The mine exploited WNW striking,  high  grade,  narrow 0.3‐ 1.5m  wide  quartz  veins  which  occurred  at  the  contact  between  several  narrow  porphyry  dikes intruded  into  mafic  volcanics.  Production  data  for  the  Pott  Falls  Mine  is  not  available.  However records  of  drift  sampling  reported  by  the  geological  survey of Guyana in 1938 gave a 70 foot strike length of a one foot wide vein at an average grade of 174 g/t Au.

Five diamond holes were drilled at Potts Falls Mine between 1946 and 1947 and the best results were approximately 4.5m @ 6.2g/t Au.  Details of this drill program and hole locations are not available

From the early 1980s the Pott Falls mine was intermittently exploited by artisinal miners who excavated a shallow 200m x 75m pit at the prospect.  Recent due diligence sampling of quartz vein ore removed from the pit at an artisanal crusher site returned 1,270 g/t and a composite sample of the crusher tailings returned 4.27 g/t Au.

Figure 3 A view of the flooded artisinal pit excavated around the historic Pott Falls Mine. The pit is approximately 200m long by 75 m across.

The only  modern  exploration  in  the  area  was  conducted  by  Adex  Exploration  a  Canadian  Junior  in 1994.  Adex  conducted  grab  sampling  and  a  50‐100m  x  200m  spaced  soil  geochemical  program covering  approximately  25%  of  the  Project  area.  Adex  did  not  drill  any  of  the  prospects.  Adex withdrew from the project in 1995 after the demise of the then property owner.

Geochemical  sampling  by  Adex  outlined  soil  anomalism  with  several  peak values >1 g/t around the Pott Falls Mine, Parrot Pitt and the Blackheart Zone (see Figure 2). At the Pott Falls mine geochemical anomalism  >125ppb  extended  intermittently  along  strike from the mine for 2,000m over a width of 400‐800m.

At  the  Parrot  Pit  which is approximately 180m x 50m, geochemical anomalism (>125 ppb) extended 400m to the east of the pit over widths of 100‐200m. Grab Sampling of quartz veins at the Parrot Pit returned values between 0.79g/t and 859 g/t Au. Parrot Pit reputedly produced 1,500 ounces of gold during the 1980s.

Geochemical anomalism at the Black Heart Zone extended over an area of 850m x 400 m at >150ppb Au.    A  trench  was  hand  excavated  across  the  anomaly  but  only to a depth of 1.5m and was too shallow  to  sample  the  underlying  saprolite.  The  trench  produced  a  continuous  width  of  174m averaging  225  ppb  with  several  samples  >1  g/t Au.  Tajiri views this trench as only demonstrating a continuous dispersed gold in soil anomaly and not mineralisation from a presumably more discretely constrained primary mineralised zone below the trench.

The Frenchman's Creek Project represent an excellent opportunity for Tajiri.  It contains several near drill  ready  targets  and  potential  for  regional  scale  gold  bearing  structures  as  evidenced  by  the abundant alluvial workings within the area.

Over  next  several  months  Tajiri will conduct mapping and surface sampling to allow the planning of both drilling and regional exploration programs.

On Behalf of the Board,

Dominic  O'Sullivan Executive  Chairman Tajiri Resources Corp.

Neither  the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies  of  the  TSX  Venture  Exchange)  accepts  responsibility  for  the  adequacy  or  accuracy  of  this release.

This  news  release  may  contain  forward‐looking  statements based on assumptions and judgments of management regarding future events or results. Such statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward‐looking  statements.  The  Company  disclaims  any  intention  or  obligation  to  revise or update such statements.

All information relating to geological results, drill plans, or other facts, statements of any geotechnical nature  have  been  prepared  by  Mr.  Dominic  O’Sullivan.  Mr.  O’Sullivan  is  a  professional  geologist, holding a BSc (Hons) in Geology from University of Sydney and is a member in good standing with the MAusIMM. As such he is a qualified person as the term is defined by TSX Venture Exchange, and under National Instrument NI43‐101 regulation and responsible for the relating contents of this release.

Further  Information: Tajiri Resources Corp. Graham Keevil President, CEO 604‐642‐0115 or Toll Free 866‐345‐0115 [email protected]