Sunday, October 18, 2026
MiningNewsTerminal
Sunday, October 18, 2026 Admin

SAGA.V ·

SAGA Metals Reports Assays from R-0047 to R-0049 with Intercepts Including 53.72% Fe2O3, 7.32% TiO2, 0.431% V2O5 from 2026 Drilling at Trapper South, Radar Critical Minerals Project in Labrador

Drill Results Exploration Programs

VANCOUVER, B.C. – July 15, 2026 – SAGA Metals Corp. ("SAGA" or the "Company") (TSXV: SAGA) (OTCQB: SAGMF) (FSE: 20H), a North American exploration company focused on critical mineral discoveries, is pleased to report additional assay results from drill holes R-0047, -0048 and -0049 completed in 2026 as part of its ongoing maiden Mineral Resource Estimate ("MRE") diamond drill program at the Trapper Zone within the 100%-owned Radar Titanium-Vanadium-Iron Project near Cartwright, Labrador, Canada. The Trapper Zone forms part of an oxide corridor that includes the Falcon and Hawkeye Zones collectively covering 29 square kilometres (Figure 1).

Figure 1: The Radar Property with the Dias QMAGT vertical gradient (Bzz) anomaly footprint shown in red (high-amplitude pixels only). The QMAGT-imaged central oxide-layering corridor validated over 29 km2, encompassing the Trapper Zone, Hawkeye Zone, and the new Falcon Zone.

Trapper Zone Assay Highlights

  • Analytical results received for three (3) additional diamond drill holes (R-0047 to R-0049) from the MRE drill program initiated in Q4 2025, delivering consistent broad intercepts of oxide mineralization.
  • Key intercepts include:
    • Hole R-0047: 126.8 m @ 42.84% Fe2O3, 5.43% TiO2, 0.306% V2O5
      • Including 68.4 m @ 46.81% Fe2O3, 6.17% TiO2, 0.335% V2O5
    • Hole R-0048: 92.3 m @ 42.46% Fe2O3, 5.38% TiO2, 0.304% V2O5
      • Including 16.3 m @ 53.72% Fe2O3, 7.29% TiO2, 0.431% V2O5
    • Hole R-0049: 100.3 m @ 42.97% Fe2O3, 5.39% TiO2, 0.316% V2O5
      • Including 26.5 m @ 53.91% Fe2O3, 7.22% TiO2, 0.431% V2O5

• These results now bring the total MRE drill results to forty-two (42) diamond drill holes received to date. As reported previously, analytical results from the first thirty-nine (39) diamond drill holes of the MRE drill program include:

DDHFROMTOLengthTrue ThicknessFe2O3TiO2V205
IDmmmm%%%
R-0008170.0237.668.366.246.159.210.311
R-000994.0181.287.284.450.6710.150.339
R-00101.5137.0135.5121.750.037.870.352
R-001158.1153.395.250.839.496.490.222
R-00123.879.075.239.627.394.870.116
R-00139.5121.0111.597.937.085.140.242
R-00148.850.041.214.936.176.360.188
R-001573.3174.0100.788.938.566.800.229
R-001644.094.650.647.152.057.210.375
R-001750.6140.690.073.051.866.760.417
R-001844.7115.070.344.142.645.660.288
R-001966.6112.345.741.649.516.560.374
R-002087.3128.040.731.137.624.930.239
R-002196.0127.431.416.553.187.080.414
R-002262.092.630.628.649.46.610.373
R-0023100.5186.586.054.045.55.50.367
R-0024112.0203.091.058.749.086.230.39
R-0024142.0186.044.028.454.27.070.443
R-0025141.3223.081.758.541.365.180.309
R-0025168.0201.033.023.747.386.010.384
R-0026141.7189.047.327.738.164.650.288
R-0026110.9131.420.512.052.396.550.449
R-002781.2162.080.863.442.745.180.320
R-0028105.7211.0105.354.542.395.400.306
R-0028144.0182.038.019.749.436.500.382
R-002965.2172.0106.895.544.415.360.341
R-002965.2104.038.834.753.026.460.441
R-003083.1174.090.949.542.575.400.303
R-003083.1101.718.610.250.816.560.398
R-003163.4171.6108.287.238.115.130.254
R-003197.0140.143.134.742.715.880.309
R-003253.8198.0144.2135.337.135.040.234
R-0032114.0170.056.052.644.686.500.294
R-003367.4168.0100.677.544.076.380.286
R-003397.0153.056.043.148.037.250.304
R-003468.8195.0126.2124.043.196.050.293
R-0034106.1170.063.962.848.617.010.344
R-00358.522.013.59.930.982.930.193
R-003655.0128.073.036.545.346.310.345
R-003680.0114.034.017.050.467.210.395
R-003752.2103.050.841.945.936.460.348
R-003845.4146.2100.873.741.235.210.302
R-0038103.9146.242.431.046.206.350.364
R-003984.0194.0110.1106.547.425.950.354
R-003997.0149.152.150.458.157.680.459
R-0039166.4194.027.626.745.885.850.350
R-004084.9130.045.131.951.207.940.340
R-00416.653.046.434.747.976.490.368
R-0042102.1137.435.323.650.686.740.378
R-004328.468.239.830.447.937.240.307
R-004482.9105.822.916.651.386.850.415
R-004576.9148.371.353.748.286.210.373
R-0045104.0144.040.031.153.697.320.441
R-004620.0147.9127.9103.652.947.350.388
R-004620.074.054.043.758.338.780.415

Table 1: MRE drill program assay intercepts previously reported in Q4 2025 and 2026 to date from drill holes R-0008 to R-0046.

  • Top 15 intercepts from the MRE Drill Program to date can be found in Table 4 below.
  • Completed sixty-three (63) holes (R-0008 to R-0070) from Q4 2025 to date in 2026, with significant oxide intercepts including 244.4 m from R-0061 (true thickness of 204.7) of semi-massive oxide with extensive rhythmic oxide layering.
  • Actively drilling holes R-0071 and R-0072.
  • MRE drilling to date has returned multiple holes of thick oxide core intercepts exceeding 70– 144 metres and certain assay intervals frequently above 45–58% Fe2O3, 6–8% TiO2 and 0.37-0.44% V2O5.
  • Rhythmic banding and semi-massive to massive oxide mineralization are observed consistently in Trapper South, comparable to the high-grade results from Trapper North.
  • Drilling is progressing efficiently, with 16,159 m completed in the Trapper Zone to date.
  • Excellent core recovery remains above 95% and representative sampling support ongoing metallurgical test work and the advancement of the maiden Mineral Resource Estimate.

Michael Garagan, CGO & Director of SAGA Metals, commented:

“These new assay results from R-0047 to R-0049 are highly encouraging and clearly illustrate how the Trapper South grid is taking shape. With numerous long intercepts of high-grade oxide mineralization—such as the 126.8 m @ 42.84% Fe2O3, 5.43% TiO2, 0.306% V2O5 (including 68.4 m @ 46.81% Fe2O3, 6.17% TiO2, 0.335% V2O5) in R-0047 and standout higher-grade zones exceeding 53% Fe2O3, 7.2% TiO2, and 0.430% V2O5 in R-0048 and R-0049—the cross-sections are filling in beautifully with consistent rhythmic layering and semi-massive oxides. This continuity across the drill grid, combined with over 16,159 metres completed to date, significantly strengthens our confidence in the scale and quality of the system as we progress toward our maiden Mineral Resource Estimate. The Trapper Zone continues to deliver the robust results needed to highlight the district-scale potential of the 29 km² oxide corridor at Radar.”

The latest results from these drill holes, R-0047, R-0048 and R-0049, once again demonstrate excellent continuity across broad zones of oxide mineralization, underscoring the growing potential for a sizable mineral resource that could create meaningful long-term value for SAGA shareholders.

Detailed Logging Highlights from Drill Hole R-0047 to R-0049

  • Hole R-0047 (Cross-Section S06, Figure 2): Drill hole R-0047 is drilled on cross-section S6, with an azimuth of 218 and a dip of -45°, with a total depth of 305 m. The oxide zone is 122.3 m thick, intersected at 106.1m, at a sheared contact runs to 247.4 m at a fault contact with a felsic dyke. Oxide zone includes rhythmic oxide layering (71.5 m) and semi-massive oxide (50.8 m).
  • Hole R-0048 (Cross-Section S10, Figure 3): Drill hole R-0048 is drilled on cross-section S10, with an azimuth of 38 and a dip of -45° with a total depth of 242 m. The oxide zone is 116.9 m thick, intersected at 31.7 and runs to 149.3 m. The upper intersect is at 50° to the core axis, with a gradational contact moving from gabbronorite to the oxide zone, beginning as rhythmic layering. The lower contact of the oxide zone is cut by a quartz vein, with the contact marked

before the upper boundary of the vein at 70° to the core axis. The oxide zone contains 105.1 m of rhythmic layering and 11.8 m of semi-massive oxide.

  • Hole R-0049 (Cross-Section S10, Figure 3): Drill hole R-0049 is drilled on cross-section S10, with an azimuth of 38 and a dip of -60°, with a total depth of 200 m. The hole intercepts the oxide zone at 30.7 m where there is a sharp magmatic contact transitioning from gabbronorite to semi-massive oxide. The upper contact for the oxide zone is 40°to core axis. The lower contact of the oxide zone is sheared at 45o to core axis against a felsic dyke at 134.3 m. The oxide zone is 103.6 m and consists of 17.4 m of semi-massive oxide and 86.1 m of rhythmic layering.

Figure 2: Cross section of S6 looking NW showing R-0019, -0027, -0028, -0042, -0043, -0044 and -0047, highlighting intercepts of semi-massive oxides and layering sequence with the 3D Magnetic Inversion of the 2025 Trapper Zone ground magnetic survey. Assays shown for R-0019, R-0027, R-0028, R-0042, R-0043, R- 0044 and R-0047.

Figure 3: Cross section of S10 looking NW showing R-0033, -0034, -0048, -0049 and -0050, highlighting intercepts of semi-massive oxides and layering sequence with the 3D Magnetic Inversion of the 2025 Trapper Zone ground magnetic survey. Assays shown for R-0033, R-0034, R-0048, and R-0049. Assays are pending for R-0050.

Trapper Zone Drilling Summary

Drill HoleAzimuth / DipTotal Depth (m)From (metres)To (metres)Semi-Massive Oxide (m)Rhythmic Layering (m)Total Oxide (m)True Thickness (m)Assays Received
R-001638° / -45°20644.0102.045.812.258.053.9Yes
R-001738° / -70°16150.6140.687.13.090.173.0Yes
R-001838° / -45°18844.7156.465.046.6111.770.1Yes
R-001938° / -45°18266.6133.038.028.566.572.8Yes
R-002038° / -45°20650.8138.028.558.787.266.7Yes
R-002138° / -70°15281.3127.433.512.646.124.3Yes
R-002238° / -45°14922.5118.731.659.791.385.3Yes
R-002338° / -45°272100.5239.330.676.4107.167.2Yes
R-002438° / -45°254108.9219.846.862.1108.968.5Yes
R-002538° / -60°275123.0253.66.9118.1125.089.6Yes
R-002638° / -60°302108.8273.716.2138.6154.887.4Yes
R-002738° / -45°21781.3175.334.259.994.173.9Yes
R-002838° / -60°227105.1215.922.587.1109.657.4Yes
R-002938° / -45°21465.2184.013.4105.4118.8106.2Yes
R-003038° / -60°21183.1189.225.479.6105.057.8Yes
R-003138° / -45°21563.4171.62.4105.9108.387.2Yes
R-003238° / -60°26353.8214.718.5136.0154.4145.0Yes
R-003338° / -45°25167.7203.523.7112.4136.1104.8Yes
R-003438° / -60°23348.7214.166.193.5159.7156.9Yes
R-003538° / -45°978.566.30.035.035.025.7Yes
R-003638° / -70°21247.4128.068.08.676.638.3Yes
R-003738° / -45°20642.6146.050.852.6103.485.2Yes
R-003838° / -70°18245.4146.255.945.0100.973.7Yes
R-0039218° / -45°25184.0196.382.223.3105.5102.1Yes
R-004038° / -70°17038.3130.044.728.773.434.3Yes
R-004138° / -45°1006.684.238.530.969.452.1Yes
R-004238° / -70°16188.6137.426.610.036.624.5Yes
R-004338° / -45°11928.4101.637.535.773.355.9Yes
R-0044218° / -45°17682.9105.819.33.722.916.6Yes
R-0045218° / -45°24539.3223.667.471.7139.196.9Yes
R-0046 a218° / -45°4917.4147.9121.719.3141.0108.0Yes
R-0046 b237.7445.921.4176.7198.2113.7Yes
R-0047218° / -45°305106.1247.450.871.5122.3118.1Yes
R-004838° / -45°24231.7149.311.8105.1116.9109.9Yes
R-004938° / -60°20030.7134.317.486.1103.666.6Yes
R-0050218° / -45°26963.9245.651.994.2146.1103.3
R-005138° / -60°31199.9227.338.588.8127.483.0
R-005238° / -45°27568.6235.019.8140.8160.6134.7
R-005338° / -60°29977.1279.435.0167.3202.3132.1
R-005438° / -45°26918.4202.035.285.3120.597.7
R-005538° / -60°32070.1291.667.673.2140.882.3
R-005638° / -45°23984.8220.024.469.694.056.1
R-005738° / -60°23392.4194.143.652.596.183.4
R-005838° / -45°29971.6138.9053.0253.036.21
R-005938° / -45°37781.9374.96.2179.6185.7155.2
R-006038° / -60°33580.9243.488.972.0160.9151.5
R-0061218° / -45°35951.9307.393.5150.8244.4204.7
R-006238° / -60°2510.0125.636.275.2111.464.5
R-0063180° / -45°54261.7494.06.5131.3137.892.8
R-0064218° / -45°5692.0492.5160.1236.5396.6356.4
R-0065a218° / -45°58441.1162.74.2117.4121.7109.8
R-0065b338.7584.061.3172.1233.4210.6
R-0066218° / -45°320Logging in progress
R-006738° / -45°221Logging in progress
R-006838° / -65°260Logging in progress
R-0069218° / -60°221Logging in progress
R-007038° / -45°221Logging in progress
R-007138° / -45°Drilling in progress
R-007238° / -70°Drilling in progress
Total (m)14,109

Table 2: Summary of drill holes R-0016 to R-0072, highlighting the oxide intercepts. See Figures 2 & 3 above, which depict the oxide mineralization in cross sections S6 and S10. True thickness represents the perpendicular width of the mineralized zone, while the total downhole oxide represents the length of the mineralization intercepted downhole.

Total Meters DrilledTotal Samples
Trapper South 202520501313
Trapper South 2026141097725
Trapper Total161599038

Table 3: Summary of total meters drilled in Q4 2025 and 2026 to date, including total core samples cut and prepared.

Figure 4: Trapper Zone plan view map outlining location of the MRE drill program completed to date, including cross-sections 0S4-S14 in Trapper South, T02-T03 in Trapper Transition, and N10-N12 in Trapper North showing the TMI of the 2025 Trapper Zone ground magnetic survey.

Sampling Summary

Saga’s core cutting team finalized the cutting, sampling, and shipping of 845 samples from R-0050, -0051, -0052, -0053 and -0054. IGS Laboratories received the samples at the beginning of last week and anticipates releasing the assay results to the Company in the coming days. An additional 475 samples from drill holes R-0055, -0056 and -0057 were sent to IGS on Friday, July 10, 2026. A total of 9,038 samples have been collected in the Trapper Zone to date.

Key Project Highlights

  • Confirmed mineralization in 70 out of 70 drill holes completed and observed in two primary zones to date.

Analytical results to date include numerous oxide-rich intercepts, including:

•

DDHFROMTOLengthTrue ThicknessFe2O3TiO2V205
IDmmmm%%%
R-000994.0181.287.284.450.6710.150.339
R-0008170.0237.668.366.246.159.210.311
R-004620.074.054.043.758.338.780.415
R-004084.9130.045.131.951.207.940.340
R-00101.5137.0135.5121.750.037.870.352
R-003997.0149.152.150.458.157.680.459
R-001773.0140.667.654.955.137.370.448
R-0045104.0144.040.031.153.697.320.441
R-003397.0153.056.043.148.037.250.304
R-004328.468.239.830.447.937.240.307
R-001644.094.650.647.152.057.210.375
R-003680.0114.034.017.050.467.210.395
R-002196.0127.431.416.553.187.080.414
R-0024142.0186.044.028.454.207.070.443
R-0034106.1170.063.962.848.617.010.344

Table 4: Top 15 intercepts from the 2025 & 2026 drilling programs at the Trapper Zone.

  • Infrastructure including road access, deep-water port, nearby hydro-electric power and regional airport.
  • Confirmed a 29.0 km2 central oxide corridor that encompasses the Trapper, Falcon and Hawkeye Zones, demonstrating district-scale potential.
  • Consistent grades and thicknesses with semi-massive to massive oxide reporting up to

72.33% Fe2O3,13.3% TiO2, and 0.66% V2O5.

  • Petrographic analysis confirms titanomagnetite mineralization is advantageous for

simplified metallurgical processing.

  • A total of 16,159 m has been completed and reported to date for the MRE drill program. See Figure 4 above, showcasing MRE drill hole locations in the Trapper Zone reported to date.

About the Radar Critical Mineral Property in Labrador

The Radar Property comprises 690 mineral claims across 9 mineral licenses, totalling approximately 24,175 hectares in southeastern Labrador, located approximately 10 km south of Cartwright. The Property entirely encloses the Dykes River Intrusive Complex (~160 km² at the surface) and is accessible year-round via paved Route 510, a Cartwright logging road, and a SAGA-constructed access trail. Infrastructure advantages include the deep-water port at Cartwright, the Cartwright Airport (YRF), and proximity to regional hydroelectric power from Muskrat Falls and Churchill Falls.

Diamond drilling, geophysics, trenching and geological mapping have confirmed a 29 km2 oxide corridor encompassing the Trapper, Falcon and Hawkeye Zones. VTM mineralization at Radar is comparable to that of global Fe-Ti-V systems such as Panzhihua (China) and Bushveld (South Africa). Subject to further exploration, resource definition, and metallurgical testing, the Project may represent a strategic source of titanium, vanadium, and iron for North American markets.