Arya Resources Reports Iron Formation Intersections at Wedge Lake – Drilling Extends Twin Zone Vertically and Laterally
Vancouver, Bri�sh Columbia – March 17, 2026 – Arya Resources Ltd. (TSXV: RBZ) (“Arya” or the “Company”) reports comple�on of its winter drilling program at the Wedge Lake Gold Project in Saskatchewan’s La Ronge Gold Belt. The 2026 winter program consisted of six holes encompassing 1,041m of drilling at the Twin and T-6 Zones and follows up on the Company’s successful 2025 drilling campaign.
The Company previously reported (March 2, 2026) sulphide-bearing iron forma�on at the T-6 Zone, located approximately 1,000 metres west of the Twin Zone, where the Company completed 236m of drilling in one step-out drill hole.
Core from the current drilling program is being logged and cut, and samples are being shipped to the laboratory for analysis. All assay results are pending. See the table and drilling plan map for addi�onal detail. Descrip�ons of lithology and sulphide content provided below are based on preliminary visual logging of the core and do not represent assay results.
Program Summary – Twin Zone
The 2026 winter drilling at the Twin Zone consisted of 805m in five drill holes (two holes drilled from the same setup) which covered approximately 381m of strike length across the zone. Iron forma�on intersected for 138 ver�cal meters in 2025/26 drilling. Recent drilling intersected mul�ple intervals of sulphide-bearing iron forma�on in step-out holes, in the area of previously released AR 25-09, designed to con�nue to evaluate the extent of the iron forma�on stra�graphy, along with the twinning of several historic drill holes to confirm the results from previous drilling.
Key observa�ons from the winter drilling program include:
- Sulphide-bearing iron forma�on intersected in a AR26-11 approximately 25 metres down dip of the intersec�on in AR25-09
- Iron forma�on intersected approximately 50 metres and 100 metres east of AR25-09 in drill holes AR26-14 and AR26-12 respec�vely
- Iron forma�on intersected in AR26-15 approximately 125 metres west of AR25-09
- Mul�ple stacked intervals of iron forma�on observed in hole AR26-13 up-dip of hole AR26-14
- Sulphide-bearing iron forma�on intersected at the T-6 Zone, approximately 1,000 metres west of the Twin Zone
- Assay results from the winter drilling program are pending.
Down dip Expansion – AR26-11
Hole AR26-11 was drilled approximately 25 metres behind and parallel to AR25-09, intersec�ng the stra�graphy approximately 25 metres down dip, sugges�ng the con�nua�on of sulphide-bearing iron forma�on below drill hole AR25-09 to test the ver�cal con�nuity of the iron forma�on.
AR26-11 intersected several intervals of sulphide-bearing iron forma�on (“SIF”), including:
- 68.05 m – 77.25 m: 9.20 m SIF
- 77.25 m – 84.90 m: 7.65 m Massive to Semi-Massive Sulphide (MSS)
- 84.90 m – 115.05 m: 30.15 m SIF
- 140.20 m – 171.85 m: 31.65 m SIF Breccia
These intervals suggest the con�nua�on of sulphide-bearing iron forma�on at depth below AR25-09.
Eastern Step-Out – AR26-14
Hole AR26-14, drilled approximately 50 metres east of AR25-09, intersected:
- 64.05 m – 66.99 m: 2.94 m MSS
- 66.99 m – 69.10 m: 2.11 m Quartz Breccia
- 69.10 m – 133.40 m: 64.30 m SIF
These intersec�ons indicate the con�nued presence of iron forma�on east of AR25-09.
Eastern Step-Out – AR26-12 (Twin of 82-09)
Hole AR26-12, drilled approximately 100 metres east of AR25-09, intersected:
- 27.80 m – 49.65 m: 21.85 m SIF
- 80.00 m – 91.90 m: 11.90 m Iron Forma�on Breccia
These intersec�ons extend the iron forma�on east of AR25-09 and confirm the rock units drilled in hole 82-09.
Up-Dip Hole – AR26-13 (Twin of 84-08)
Hole AR26-13, drilled approximately 25 metres above AR26-14, intersected:
- 52.40 m – 56.00 m: 3.60 m SIF
- 56.00 m – 120.00 m: 64.00 m Mixed SIF and Dacite
- 120.00 m – 130.00 m: 10.00 m Andesite Tuff
- 130.00 m – 140.00 m: 10.00 m Mixed SIF and Dacite
- 149.00 m – 168.00 m: 19.00 m Mixed SIF and Dacite
These intersec�ons indicate mul�ple iron-forma�on intervals, confirming the rock units drilled in hole 84-08.
Twin and T-6 Zones Drilling Map
Western Step-Out – AR26-15 (Twin of 83-10)
Hole AR26-15, drilled approximately 125 metres west of AR25-09
Observed intervals include:
- 9.30 m – 14.70 m: 5.40 m Quartz Vein
- 14.70 m – 26.00 m: 11.30 m Mixed SIF and Dacite
- 26.00 m – 30.50 m: 4.50 m Quartz Breccia
Management Commentary
“These drill holes indicate that iron forma�on intersected at the Twin Zone occurs both above and below earlier drilling and extends laterally to the east and west,” stated Rasool Mohammad, CEO of Arya Resources.
Wedge Lake: 2026 Winter Drill Program
| Hole # | UTM83Z13-E | UTM83Z13-N | Purpose | Depth (m) | Azimuth | Dip |
|---|---|---|---|---|---|---|
| AR26-011 | 572,273.72 | 6,234,682.96 | Step out from AR25-09 | 257 | 170 | -52 |
| AR26-012 | 572,369.13 | 6,234,669.27 | Twin of 82-09 | 110 | 170 | -47 |
| AR26-013 | 572,314.42 | 6,234,691.89 | Twin of 84-08 | 167 | 170 | -60 |
| AR26-014 | 572,314.41 | 6,234,691.90 | New Step out | 188 | 170 | -46.8 |
| AR26-015 | 572,181.38 | 6,234,473.61 | Twin of 83-10 | 83 | 350 | -46 |
| AR26-016 | 571,563.93 | 6,234,464.51 | Step out from AR25-10 | 236 | 223 | -52 |
| Total Metres 1,041 m |
Independent Qualified Person
Kevin Wells, P.Geo., a consul�ng geologist for the Company, is the independent qualified person, as defined by Na�onal Instrument 43-101 - Standards of Disclosure for Mineral Projects, for the Wedge Lake Project, who has reviewed, verified, and approved the contents of this news release.
About Arya Resources Ltd. (TSXV: RBZ)
Arya Resources Ltd. is a Canadian mineral explora�on company focused on the acquisi�on, explora�on, and development of precious and cri�cal-metal projects in Saskatchewan. The Company is advancing its flagship Wedge Lake Gold Project and its Dunlop Nickel-Copper-Cobalt Project, both located in miningfriendly jurisdic�ons with excellent infrastructure.
As a Tier 2 issuer on the TSX Venture Exchange, Arya is commi�ed to building shareholder value through discovery-driven explora�on, disciplined execu�on, and responsible development. For more informa�on, please visit us at www.aryaresourcesltd.com.
On behalf of the Board of Directors:
Rasool Mohammad, CEO
For more informa�on, please contact:
Arya Resources Ltd.
Rasool Mohammad, CEO E: [email protected] T: (604) 868-7737
CHF Capital Markets
Cathy Hume, CEO E: [email protected] T: (416) 868-1079 x 251
Twi�er: @ARYARESOURCES Facebook: @AryaResourcesLtd.
LinkedIn: @AryaResourcesLtd.
YouTube: @ARYARESOURCES
Neither the TSX Venture Exchange nor its Regula�on Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this news release.
Forward-Looking Statements
This news release includes "forward-looking statements" that are subject to assump�ons, risks and uncertain�es. Statements in this news release which are not purely historical are forward-looking statements, including, without limita�on, any statements concerning the Company's inten�ons, plans, es�mates, expecta�ons or beliefs. Although the Company believes that any forward-looking statements in this news release are reasonable, there can be no assurance that any such forward-looking statements will prove to be accurate. The Company cau�ons readers that all forward-looking statements, including, without limita�on to those rela�ng to the Company's future opera�ons and business prospects, are based on assump�ons, none of which can be assured, and are subject to certain risks and uncertain�es that could cause actual events or results to differ materially from those indicated in the forward-looking statements. Readers are advised to rely on their own evalua�on of such risks and uncertain�es and should not place undue reliance on forward-looking statements. Any forward-looking statements are made as of the date of this news release, and the Company assumes no obliga�on to update the forward-looking statements, or to update the reasons why actual events or results could or do differ from those projected in the forward-looking statements. Except as required by law, the Company assumes no obliga�on to update any forward-looking statements, whether as a result of new informa�on, future events or otherwise.