PERSEUS INCREASES EDIKAN’S INVENTORIES OF MINERAL RESOURCES AND ORE RESERVES
Perth/Western Australia/ July 19, 2022/ Perseus Mining Limited (ASX/TSX: PRU) has completed a Feasibility Study on the Nkosuo Project, located approximately seven kilometres north-northwest of its Edikan Gold Mine in Ghana, adding substantial Mineral Resources and Ore Reserves to Edikan’s previously published inventory.
HIGHLIGHTS
- Indicated Mineral Resources1 at Nkosuo amount to 14.5Mt at 0.91g/t for 422,000 ounces of contained gold, and Inferred Mineral Resources are estimated at 0.95 million tonnes grading 0.90 g/t gold containing 27,000 ounces of gold at 30 June 2022.
- Probable Ore Reserves1 total 10 million tonnes of ore grading 1.04g/t gold and containing 332,000 ounces of gold.
- Planned processing of the Nkosuo Ore Reserves in the Edikan mill is expected to increase the life of the Edikan operation by 18 to 24 months, extending the mine life to FY2027.
Nkosuo Measured and Indicated Mineral Resources as at 30 June 2022
| PROJECT | DEPOSIT TYPE | MEASURED RESOURCES | INDICATED RESOURCES | MEASURED + INDICATED RESOURCES | ||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Quantity Mt | Grade g/t gold | Gold '000 oz | Quantity Mt | Grade g/t gold | Gold '000 oz | Quantity Mt | Grade g/t gold | Gold '000 oz | ||||||||||||
| Nkosuo1 | - | - | - | 14.5 | 0.91 | 422 | 14.5 | 0.91 | 422 | |||||||||||
| Total | - | - | - | 14.5 | 0.91 | 422 | 14.5 | 0.91 | 422 |
1 Refer to Notes in the individual tables of Mineral Resources and Ore Reserves.
Nkosuo Proved and Probable Ore Reserves as at 30 June 2022
| PROVED | PROBABLE | PROVED + PROBABLE | ||||||||
| DEPOSIT | ||||||||||
| DEPOSIT | Quantity | Grade | Gold | Quantity | Grade | Gold | Quantity | Grade | Gold | |
| TYPE | ||||||||||
| Mt | g/t gold | ‘000 oz | Mt | g/t gold | ‘000 oz | Mt | g/t gold | ‘000 oz |
Nkosuo1 - - - 10.0 1.04 332 10.0 1.04 332
Total - - - 10.0 1.04 332 10.0 1.04 332
1 Refer to Notes in the individual tables of Mineral Resources and Ore Reserves.
Perseus’s Managing Director and CEO Jeff Quartermaine said:
“The addition of Mineral Resources and Ore Reserves from the Nkosuo Project adds significantly to the mine life at Edikan Gold Mine, ensuring operations can continue while Perseus conducts further exploration on the recently acquired Agyakusu Exploration Permit and two other adjoining Exploration Permits that are under option to Perseus. We believe that the discovery of additional Ore Reserves in trucking distance of existing infrastructure is the most cost effective means available to Perseus of creating value for shareholders. With this objective, further exploration on the nearby tenements will be well funded by Perseus and we are optimistic of discovering further deposits of a similar scale to Nkosuo that will further add to the mine life of the Edikan operation.”
PERSEUS MINING LIMITED
Level 2, 437 Roberts Road, Subiaco WA 6008 ABN: 27 106 808 986
OVERVIEW OF NKOSUO
Nkosuo is located in Ghana, West Africa, approximately 40 kilometres southwest of the regional town of Obuasi, 200 kilometres west-northwest of the capital Accra and seven kilometres to the north-northwest of Perseus’s Edikan Gold Mine near the town of Ayanfuri.
A Feasibility Study has been completed on the development of mineralisation discovered by Perseus at Nkosuo resulting in the estimation of an Ore Reserve of 332,000 ounces (contained) producing 272,000 ounces (recovered) over three years of mining. All in site costs (AISCs) are expected to be in the range of US$870-US$890 per ounce for Nkosuo.
The area of the Nkosuo Project is underlain principally by Paleoproterozoic Birimian flysch-type metasediments consisting of dacitic volcaniclastics, greywackes plus argillaceous (phyllitic) sediments, intensely folded, faulted and metamorphosed to upper greenschist facies. Numerous small “Basin-type” or “Cape Coast-type” granite bodies have intruded the sediments along several regional structures.
The Nkosuo Project comprises mineralisation hosted by a single north-northeast striking granitoid body measuring at least 600 metres along strike, typically 250 metres horizontal width and dipping approximately 75 degrees toward west-northwest.
Nkosuo will be mined in a single open pit, with a waste dump located to the west of the pit as shown in Figure 1. Ore from the pit will be trucked on a dedicated haul road to the Edikan processing plant for co-processing with ores from existing Edikan open pits and stockpiles.
Figure 1: Nkosuo Project Layout
PERSEUSMINING.COM 2
MINERAL RESOURCE ESTIMATES
The Mineral Resource estimates are reported in accordance with the 2012 Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code). The classification categories of Measured, Indicated and Inferred under the JORC Code are equivalent to the CIM categories of the same names (CIM, 2014).
For a comprehensive description of the Nkosuo Mineral Resource estimates, refer to the JORC tables included in Appendix 1. The currently estimated Mineral Resources at Nkosuo are summarised in Table 1 and 2 below.
Table 1: Nkosuo Measured and Indicated Mineral Resources –30 June 2022 1,2
| PROJECT | DEPOSIT TYPE | MEASURED RESOURCES | INDICATED RESOURCES | MEASURED + INDICATED RESOURCES | ||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Quantity Mt | Grade g/t gold | Gold '000 oz | Quantity Mt | Grade g/t gold | Gold '000 oz | Quantity Mt | Grade g/t gold | Gold '000 oz | ||||||||||||
| Nkosuo 3,4 | Open Pit | - | - | - | 14.5 | 0.91 | 422 | 14.5 | 0.91 | 422 | ||||||||||
| Total | - | - | - | 14.5 | 0.91 | 422 | 14.5 | 0.91 | 422 |
Table 2: Nkosuo Inferred Mineral Resources – 30 June 2022 2
| PROJECT | DEPOSIT TYPE | INFERRED RESOURCES | ||||||
|---|---|---|---|---|---|---|---|---|
| Quantity Mt | Grade g/t gold | Gold '000 oz | ||||||
| Nkosuo 3,4 | Open Pit | 0.95 | 0.9 | 27 | ||||
| Total | 0.95 | 0.9 | 27 |
Notes:
1. Indicated Mineral Resources are inclusive of Ore Reserves.
2. Rounding of numbers to appropriate precisions may have resulted in apparent inconsistencies.
3. Based on June 2022 Mineral Resource model constrained to US$1,800/oz pit shell.
0.3g/t gold cut-off applied to in situ material.
GEOLOGY
The Nkosuo project is an addition to the Edikan group of gold deposits that occur near the western flank of the Ashanti Greenstone Belt in south-western Ghana. The regional geology of the Edikan property is underlain principally by Paleoproterozoic Birimian metasediments of the Kumasi-Afema basin, positioned between the Ashanti and Sefwi Greenstone Belts.
Nkosuo is a granite-hosted orogenic gold deposit with structurally controlled mineralisation occurring with disseminated pyrite-arsenopyrite mineralisation associated with quartz veining and sericite alteration within the granite. The surrounding metasedimentary rocks are almost entirely devoid of mineralisation.
The granitoid body at Nkosuo hosting the gold mineralisation strikes north-northeast with an identified length of 600 metres along strike and typically 250 metres in horizontal width that dips 75 degrees towards the west-northwest. Drilling has confirmed that the granitoid body is continuous to at least 350 metres vertical depth below surface. The entire granite is not mineralised throughout but drilling to date indicates substantial zones of gold mineralisation up to 100 metres horizontal width.
DRILLING TECHNIQUES
Nkosuo Mineral Resources are delineated by 222 drill holes for a total of 36,982 metres comprised of reverse circulation (“RC”) and diamond core drill holes drilled by Perseus since 2021. The global Nkosuo Mineral Resource estimates are informed entirely by Perseus drilling with a breakdown by sample type of 43% RC and 57% diamond. This ratio changes for the Mineral Resource constrained within the US$1,800 pit optimisation to 22% RC and 77% diamond. RC drilling used face-sampling hammers with 139-millimetre hole diameter and the diamond core was HQ in the weathered material which changed to NQ2 in the fresh material.
PERSEUSMINING.COM 3
Drill hole collar locations have been surveyed by qualified surveyors. Both RC and diamond core holes were downhole surveyed at nominal 30 metre intervals.
Orientation of most drill holes at Nkosuo is approximately perpendicular to the strike of mineralisation. Drilling has occurred at 20 metres spacing on 40 metre spaced traverses with holes generally dipping at -55 degrees towards 119 degrees azimuth with partial infill to 20 metres by 20 metres in places. Drill coverage generally extends to about 150 metres vertical depth and to a maximum depth of about 380 metres.
SAMPLING
RC drill samples were collected at drill sites at 1 metre intervals and split using multi-stage riffle splitters. For the majority of Perseus’s drilling, each two consecutive samples were composited into one sample for assaying. Sample weights were nominally 2.5 kilograms and 5 kilograms for 1 metre and 2 metre samples respectively.
Diamond core was sawn in half using a diamond blade saw, with the right-hand half sent for assaying and the lefthand half stored in core trays for reference. Samples were normally taken at 1 metre intervals.
RC drill samples were logged visually for recovery, sample condition (i.e., dry, damp, wet) and contamination. Sample condition logs are available for 96% of RC samples within the mineralised granite. Recovered sample weights are available for 64% of RC samples and RC sample recoveries ranged from an estimated 46% for highly weathered to 80% for fresh material. Diamond core recoveries were measured linearly per drill run. Core recoveries averaged 67% in weathered materials and 98% in fresh rock. There is no indication of a relationship between gold grades and RC/Diamond sample recoveries.
SAMPLE ANALYTICAL METHODS
All sample preparation and assaying was carried out by commercial laboratories; no sample preparation was undertaken by Perseus. Preparation of core and RC samples followed a standard path of drying at 105 degrees Celsius for at least 12 hours, crushing the entire sample to 85% passing -2 millimetres and grinding a 1.5 kilogram split to 85% passing 75 microns. 300gram pulp subsamples are selected by multiple scoop passes.
All RC and diamond core samples have been assayed by 50-gram fire assay with AAS determination by Intertek Testing Services Ghana at their Tarkwa assay laboratory. The technique is considered a total extraction technique
Perseus’s quality assurance and quality control “QAQC” procedures included submission of coarse blanks inserted at 1 in 20, certified reference standards at 1 in 20, internal laboratory standards, duplicates and repeats.
ESTIMATION METHODOLOGY – OPEN PIT MINERAL RESOURCES
Mineral Resources were estimated by Multiple Indicator Kriging (“MIK”) of 2 metre down-hole composited gold grades from RC and diamond drilling. Compositing and wireframing were performed using Micromine software. Exploratory data analysis, variogram calculation and modelling, and resource estimation were performed using FSSI Consultants (Australia) Pty Ltd (FSSI) GS3M software.
A total of 10 holes were excluded from the estimate due to hole twinning to prevent clustering effects in the estimates which represented approximately 3% of the mineralised domain composites being excluded.
Mineralised domains used for resource estimation delineate zones within which the tenor and spatial trends of mineralisation are similar. Sample data were also separated into sub-domains representing weathering horizons using surfaces provided by Perseus. Grade continuity was characterised by indicator variograms modelled at 14 indicator thresholds. At Nkosuo, class grades were derived from class mean grades with the exception of upper bin grades which were derived from class medians.
The above approaches to treatment of high grades reduces the impact of small numbers of extreme grades on estimates of resources.
At Nkosuo, Mineral Resources were estimated into panels with dimensions 20 metres x 20 metres x 5 metres (X, Y, Z), approximating the drill hole spacing in the closer spaced parts of the drill pattern.
The estimates include variance adjustments to provide estimates of recoverable resources expected to be recoverable by open pit mining on the scale presently practiced at Edikan.
CRITERIA FOR RESOURCE CLASSIFICATION
Nkosuo estimates were classified as Indicated and Inferred based on the data collected (geology, survey and assaying data), the density of data, and the confidence in the geological model and mineralisation model. Indicated resources
PERSEUSMINING.COM 4
are informed by drilling spaced at up to 40 metres by 40 metres and Inferred resources are on the peripheries of drilling out to a maximum distance of approximately 40 metres from drilling.
CUT-OFF GRADE
The cut-off grade of 0.3g/t gold for the stated open pit Mineral Resource estimates reflects economic parameters deriving from current and anticipated mining practices at Nkosuo and a gold price of US$1,800/oz.
REASONABLE PROSPECTS FOR EVENTUAL ECONOMIC EXTRACTION
Mineral Resources are reported within an optimal pit shell generated using cost and revenue parameters in the Nkosuo Feasibility Study and a gold price of US$1,800/oz.
ORE RESERVE ESTIMATE
The Ore Reserve is summarised below in Table 3 and is based on the Nkosuo Mineral Resources as at 30 June 2022. Ore Reserves are reported in accordance with the JORC Code and are reported by category, deposit and type, above variable cut-off grades. The classification categories of Proved and Probable under the JORC Code are equivalent to the CIM Proven Mineral Reserve and Probable Mineral Reserve categories respectively (CIM, 2010). Appendix 1 provides the JORC Table 1 criteria for the Nkosuo Ore Reserves.
The Probable Ore Reserves for Nkosuo are estimated as 10.0 Mt grading 1.04 g/t gold, containing 332,000 ounces of gold, with no Proved Ore Reserves currently identified.
Table 3: Nkosuo Proved and Probable Ore Reserves as at 30 June 2022
| PROVED | PROBABLE | PROVED + PROBABLE | ||||||||
| DEPOSIT | ||||||||||
| DEPOSIT | Quantity | Grade | Gold | Quantity | Grade | Gold | Quantity | Grade | Gold | |
| TYPE | ||||||||||
| Mt | g/t gold | ‘000 oz | Mt | g/t gold | ‘000 oz | Mt | g/t gold | ‘000 oz |
Nkosuo1,2,3,4 Open Pit - - - 10.0 1.04 332 10.0 1.04 332 Total - - - 10.0 1.04 332 10.0 1.04 332
Notes:
1. Based on Mineral Resource Estimates which were current at 30 June 2022.
2. Variable gold grade cut-off for each material type, ranging from 0.35 g/t to 0.45 g/t.
3. Inferred Mineral Resource is considered as waste.
4. Rounding of numbers to appropriate precisions may have resulted in apparent inconsistencies.
ECONOMIC ASSUMPTIONS
- Gold metal price US$1,300/oz.
- Un-escalated average costs used in optimising pit designs are as shown in Table 4 below.
- A discount rate of 10% (real) has been assumed to calculate net present values of forecast cash flows.
Table 4: Assumed average operating costs
- MINING (OPEN PIT) • PROCESSING • G&A • SELLING • ROYALTIES
US$3.61t/mined US$8.67/milled US$2.31t/milled US$2.24/oz sold 6.5%1
Notes:
1. Royalties are 6.5% plus an additional $2/Reserve oz discovery bonus payable to Adio Mabas Group.
OPEN PIT MINING PARAMETERS
- The chosen method for the Open Pit Reserves is conventional open pit mining utilising hydraulic excavators and trucks, mining bench heights of 5 metres with 2.5 metre flitches to minimise ore loss and waste rock dilution.
- The economic pit shell was defined using Whittle pit optimisation software (“Whittle”) with inputs such as geotechnical parameters, metallurgical recovery and mining costs.
- The pit optimisation was run with revenue generated only by Measured and Indicated Mineral Resources. No value was allocated to Inferred Mineral Resources.
- Whittle input parameters are based on Perseus Mining Limited site operating experience in similar deposits at Edikan and supporting technical studies undertaken as part of the Nkosuo Feasibility study.
PERSEUSMINING.COM 5
- The pit slope designs are based on a geotechnical study by George, Orr and Associates (Australia) Pty Ltd. Overall pit slopes are 30 to 60 degrees inclusive of berms spaced at between 5 and 20 metres vertically and berm widths of 6 to 13 metres.
- Pit ramps have been designed for a 100-tonne payload truck fleet and are set at 24 metres (dual lane) to 16 metres (single lane). Minimum mining width is 40 metres for the 100-tonne class truck fleet.
- Vertical mining advance has been capped based on Perseus’s operating experience.
- No environmental issues are known to exist which will prevent open pit mining and ore processing to continue to operate. Perseus has sufficient space available for waste dumps and tailings dams to store the expected quantities of mine waste rock and tailings associated with the Nkosuo open pit Ore Reserve.
- Ore cut-off grades are based on the gold price, cost and mining parameters are as shown in Table 5 below.
Table 5: Open Pit Cut-Off Grades
| CUT-OFF GRADE BY ORE TYPE (G/T GOLD) | |||
| DEPOSIT | |||
| Oxide | Transition | Fresh Granite |
Nkosuo 0.35 0.45 0.45
PROCESSING PARAMETERS
- The process metallurgical recovery for gold is fixed by material type in each deposit. Gold recovery rates range from 55% for oxide ore and 90% for primary ore. Recovery is shown in Table 6.
- No deleterious material has been identified.
- Average annual processing throughput rate of ore is nominally 7.0Mtpa, with throughput rates variable by material type and deposit. The processing circuit involves single stage crushing, semi-autogenous grinding, gravity recovery, flotation, regrind and CIL.
Table 6: Metallurgical Recoveries by Material Type and Pit
| METALLURGICAL RECOVERIES BY ORE TYPE (%) | |||
| DEPOSIT | |||
| Oxide | Transition | Fresh Granite |
Nkosuo 55.1 87.6 90.3
STOCKPILE PARAMETERS
It is assumed that all Ore Reserve material is mined and fed to the processing plant during Edikan’s mine life based on the material blending schedule and all the material is rehandled on the ROM stockpile. Stockpiles of Nkosuo low grade material that remain unprocessed at the end of mine life are excluded from Ore Reserves.
CRITERIA FOR ORE RESERVE CLASSIFICATION
Ore Reserves have been classified based on the underlying Mineral Resource classifications and a Feasibility level study for the Nkosuo project. Mineral Resources were classified as Indicated and Inferred. The Ore Reserves, based only on the Indicated Resources, have been classified as Probable Ore Reserves, respectively.
The Ore Reserve is classified as Probable in accordance with the JORC Code, corresponding to the Mineral Resource classification of Indicated and taking into account other modifying factors where relevant. The deposit’s geological model is well constrained. The Ore Reserve classification is considered appropriate given the nature of the deposit, the moderate grade variability, drilling density, structural complexity and mining and processing history of similar deposits at Edikan. Therefore, it was deemed appropriate to use Indicated Mineral Resources as a basis for Probable Ore Reserves.
No Inferred Mineral Resources were included in the Ore Reserve estimate.
NEXT STEPS
- With the completion of the Nkosuo Feasibility Study, an application will be lodged with the Ghanaian Minerals Commission (Mincom) acting on behalf of the Ministry for Lands and Natural Resources.
- In parallel with the Mincom submission, an application will be lodged with the Environmental Protection Agency (EPA) of Ghana which paves the way for community baseline studies and public hearings. These activities culminate in generation of an Environmental Impact Assessment.
- Perseus will then submit an Environmental Impact Statement, which is the final document required for granting of an Environmental Permit for mining at the Nkosuo project.
PERSEUSMINING.COM 6
- Conversion of the Agyakusu Prospecting Licence to a Mining Lease and granting of an Environmental Permit for Nkosuo is expected to take 18 to 24 months.
This announcement was approved for release by Managing Director and CEO, Jeff Quartermaine.
COMPETENT PERSON STATEMENT:
The information in this report that relates to Mineral Resources for Nkosuo is based on information compiled by Mr Gary Brabham, a Competent Person who is a Fellow of The Australasian Institute of Mining and Metallurgy and a Member of the Australian Institute of Geoscientists. Mr Brabham was until 1 July 2022 a full-time employee and is currently a consultant of Perseus Mining. Mr Brabham has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activities which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” and a Qualified Person as defined in NI43-101. Mr Brabham consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.
The information in this report that relates to Ore Reserves for the Nkosuo deposit is based on information compiled by Mr Adrian Ralph, a Competent Person who is a Fellow of The Australasian Institute of Mining and Metallurgy. Mr Ralph is a full-time employee of Perseus Mining. Mr Ralph has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activities which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” and a Qualified Person as defined in NI43-101. Mr Ralph consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.
CAUTION REGARDING FORWARD LOOKING INFORMATION:
This report contains forward-looking information which is based on the assumptions, estimates, analysis and opinions of management made in light of its experience and its perception of trends, current conditions and expected developments, as well as other factors that management of the Company believes to be relevant and reasonable in the circumstances at the date that such statements are made, but which may prove to be incorrect. Assumptions have been made by the Company regarding, among other things: the price of gold, continuing commercial production at the Sissingué Gold Mine, the Edikan Gold Mine and the Yaouré Gold Mine without any major disruption due to the COVID-19 pandemic or otherwise, the receipt of required governmental approvals, the accuracy of capital and operating cost estimates, the ability of the Company to operate in a safe, efficient and effective manner and the ability of the Company to obtain financing as and when required and on reasonable terms. Readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used by the Company. Although management believes that the assumptions made by the Company and the expectations represented by such information are reasonable, there can be no assurance that the forward-looking information will prove to be accurate. Forward-looking information involves known and unknown risks, uncertainties, and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any anticipated future results, performance or achievements expressed or implied by such forward-looking information. Such factors include, among others, the actual market price of gold, the actual results of current exploration, the actual results of future exploration, changes in project parameters as plans continue to be evaluated, as well as those factors disclosed in the Company's publicly filed documents. The Company believes that the assumptions and expectations reflected in the forward- looking information are reasonable. Assumptions have been made regarding, among other things, the Company’s ability to carry on its exploration and development activities, the timely receipt of required approvals, the price of gold, the ability of the Company to operate in a safe, efficient and effective manner and the ability of the Company to obtain financing as and when required and on reasonable terms. Readers should not place undue reliance on forward-looking information. Perseus does not undertake to update any forward-looking information, except in accordance with applicable securities laws.
| ASX/TSX CODE: PRU REGISTERED OFFICE: Level 2, 437 Roberts Road Subiaco WA 6008 Telephone: +61 8 6144 1700 Email: [email protected] WWW.PERSEUSMINING.COM | CONTACTS: |
| Jeff Quartermaine | |
| Managing Director & CEO | |
| [email protected] | |
| Nathan Ryan | |
| Media Relations | |
| +61 4 20 582 887 | |
| [email protected] | |
| Claire Hall | |
| Corporate Communications | |
| +61 414 558 202 | |
| [email protected] |
PERSEUSMINING.COM 7
JORC TABLE 1 – NKOSUO PROJECT
JORC 2012 Table 1 – Section 1 sampling techniques and data
(Criteria in this section apply to all succeeding sections)
| Criteria | JORC Code Explanation | Commentary | |||
| Sampling techniques | Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc.). These examples should not be taken as limiting the broad meaning of sampling. Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used. Aspects of the determination of mineralisation that are Material to the Public Report. In cases where ‘industry standard’ work has been done this would be relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30 g charge for fire assay’). In other cases more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (e.g. submarine nodules) may warrant disclosure of detailed information. | Nature and quality of sampling (e.g. cut channels, random chips, or | Other than for soil sampling and an airborne EM-magnetics-radiometrics survey conducted in 2020 there has been no previous mineral exploration at Nkosuo. The presence of gold mineralisation was first revealed by artisanal miners in 2019. Perseus commenced drilling in July 2021. Drilling completed to 31 March 2022 is tabulated below. All drilling on the Property to date has been located at the Nkosuo project. Drilling Type No. Holes RC metres DD metres Purpose RC 90 7,043 0 Resource Pre-collared DD 109 10,992 15,885 Resource DD 11 0 1,900 Resource RC 1 120 0 Water DD 5 0 262 Met Pre-collared DD 2 115 180 Geotech DD 4 0 485 Geotech Totals 222 18,270 18,712 RC drilling used face-sampling hammers with 139mm hole diameter. Samples were collected at one metre intervals and logged visually for recovery, sample condition (dry, damp, wet) and contamination. Sample recoveries were measured by weighing bulk recovered samples. Diamond drilling utilised HQ triple-tube (61.1mm Ø) drilling in weathered materials and NQ2 (50.6mm Ø) diameter core in fresh rock. Diamond core recoveries were measured linearly per drill run. Core recoveries averaged 70% in weathered materials and 100% in fresh rock. | ||
| specific specialised industry standard measurement tools appropriate | |||||
| to the minerals under investigation, such as down hole gamma sondes, | |||||
| or handheld XRF instruments, etc.). These examples should not be taken | |||||
| as limiting the broad meaning of sampling. | |||||
| Include reference to measures taken to ensure sample representivity | |||||
| and the appropriate calibration of any measurement tools or systems | |||||
| used. | |||||
| Aspects of the determination of mineralisation that are Material to the | |||||
| Public Report. In cases where ‘industry standard’ work has been done | |||||
| this would be relatively simple (e.g. ‘reverse circulation drilling was | |||||
| used to obtain 1 m samples from which 3 kg was pulverised to produce | |||||
| a 30 g charge for fire assay’). In other cases more explanation may be | |||||
| required, such as where there is coarse gold that has inherent sampling | |||||
| problems. Unusual commodities or mineralisation types (e.g. submarine | |||||
| nodules) may warrant disclosure of detailed information. |
| Drilling Type | No. Holes | RC metres | DD metres | Purpose |
|---|---|---|---|---|
| RC Pre-collared DD DD RC DD Pre-collared DD DD | 90 | 7,043 | 0 | Resource |
| 109 | 10,992 | 15,885 | Resource | |
| 11 | 0 | 1,900 | Resource | |
| 1 | 120 | 0 | Water | |
| 5 | 0 | 262 | Met | |
| 2 | 115 | 180 | Geotech | |
| 4 | 0 | 485 | Geotech | |
| Totals | 222 | 18,270 | 18,712 |
Drilling techniques Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air RC drilling used face-sampling hammers with 139mm hole diameter. Samples were collected at one metre intervals. blast, auger, Bangka, sonic, etc.) and details (e.g. core diameter, triple Diamond drilling utilised HQ triple-tube (61.1mm Ø) drilling in weathered materials and NQ2 (50.6mm Ø) diameter core or standard tube, depth of diamond tails, face-sampling bit or other in fresh rock. Core in fresh rock was oriented using a “Reflex ACT II” device.
type, whether core is oriented and if so, by what method, etc.).
Drill sample Method of recording and assessing core and chip sample recoveries and RC drill samples were logged visually for recovery, sample condition (dry, damp, wet) and contamination. Sample recovery results assessed. condition logs are available for 96% of RC samples within the mineralised granite.
Measures taken to maximise sample recovery and ensure RC With Dry Moist Damp Wet representative nature of the samples. metres sample drilled condition log
PERSEUSMINING.COM 8
| Criteria | JORC Code Explanation | Commentary | |||||||
|---|---|---|---|---|---|---|---|---|---|
| Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to preferential loss/gain of | Number Proportion | 13.065 | 12.592 | 12,349 | 30 | 53 | 160 | ||
| 96% | 95% | 0.2% | 0.4% | 1% |
Sample weights are available for 68% of RC samples recovered within the mineralised granite.
| Weathering Zone | RC metres drilled | RC samples with weights | Proportion with weights % | Estimated sample recovery % |
|---|---|---|---|---|
| Highly weathered Moderately weathered Slightly weathered Fresh | 2,278 | 1,572 | 69 | 46 |
| 2,341 | 1,614 | 69 | 55 | |
| 1,427 | 948 | 66 | 71 | |
| 6,884 | 4,139 | 60 | 80 | |
| Total/average | 12,930 | 8,273 | 64 | 68 |
There is no indication of a relationship between gold grades and RC sample recoveries.
Diamond core recoveries were measured linearly per drill run. Core recoveries averaged 67% in weathered materials and 98% in fresh rock.
| Weathering Zone | Core metres drilled | Minimum recovery % | Wtd Ave recovery % | Maximum recovery % |
|---|---|---|---|---|
| Highly weathered Moderately weathered Slightly weathered Fresh | 164 | 0 | 63 | 111 |
| 200 | 0 | 52 | 100 | |
| 123 | 6 | 84 | 107 | |
| 16,284 | 0 | 98 | 112 | |
| Total/average | 16,771 | 98 |
There is no indication of a relationship between gold grades and core recoveries.
Both RC and core sample recoveries in highly weathered and moderately weathered materials (saprolite and saprock) are poor by industry standards. The Competent Person considers that the poor sample recoveries potentially increase the risk associated with estimates of Mineral Resources and Ore Reserves at Nkosuo. The extent to which the resource risk may be increased is not readily quantifiable.
Logging Whether core and chip samples have been geologically and Geological logs are available for the entire lengths of all drill holes. The logging is qualitative in nature.
geotechnically logged to a level of detail to support appropriate Sieved samples of RC chips from each metre of drilling were logged for colour, rock type, alteration type and intensity, Mineral Resource estimation, mining studies and metallurgical studies.
vein quartz content, sulphide mineralisation, weathering and oxidation. The chips are stored in plastic chip trays and the trays photographed.
PERSEUSMINING.COM 9
Whether logging is qualitative or quantitative in nature. Core (or Diamond drill core was logged for geology, structure and geotechnical characteristics. Geological logging included colour, costean, channel, etc.) photography. lithology, weathering, oxidation, vein type and vein volume percentage, sulphide species and their estimated percentages, alteration and alteration intensity. Structural logging included fault, fold, cleavage and joint orientation, lithological The total length and percentage of the relevant intersections logged.
contacts and vein orientations. Drill core was photographed prior to cutting.
Sub-sampling If core, whether cut or sawn and whether quarter, half or all core taken. RC drill samples were collected over one metre intervals and manually split using multi-stage riffle splitters. Seventeen techniques and percent of RC metres drilled within mineralised granite were assayed as one metre intervals. The remainder were assayed sample as, generally, 2m or 4m composite samples. Composite samples were made by combining approximately equal mass riffle preparation split sub-samples from each metre sample. Assay sub-samples despatched to the laboratory averaged around 3kg. All RC If non-core, whether riffled, tube sampled, rotary split, etc. and whether holes and pre-collars have been assayed in entirety.
sampled wet or dry.
| Assay sample intervals | ||||||
|---|---|---|---|---|---|---|
| RC metres drilled | 1m | 2m | 3m | 4m | other | |
| Number Proportion of RC metres drilled in granite | 13.065 | 2,212 | 5,531 | 15 | 93 | 162 |
| 17% | 79% | 0.3% | 3% | 1% |
For all sample types, the nature, quality and appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the in- situ material collected, including for instance results for field duplicate/second-half sampling.
In weathered materials, diamond core was halved using spatulas or knives. In fresh rock, core was sawn in half using a Whether sample sizes are appropriate to the grain size of the material diamond blade saw, with one half sent for assaying and the other half stored in core trays for reference. Samples were being sampled. normally taken at 1 metre intervals. All diamond drill core has been assayed.
Preparation of core and RC samples followed a standard path of drying at 105 degrees C for at least 12 hours, crushing the entire sample to 85% passing -2mm and grinding a 1.5kg split to 85% passing 75 microns. 300g pulp subsamples are selected by multiple scoop passes.
Quality control measures adopted to confirm the representivity of samples from RC and diamond drilling include:
- Field re-splits of RC samples at an average frequency of around one duplicate per 20 primary samples respectively.
- Submission of coarse blanks at an average of around 1 blank per 20 primary samples
- Use of pressurised air between every sample in crushing and pulverising equipment and quartz wash/prep blank every 25th sample
- Screening of approximately 1:20 crushed and pulp samples to check grind size
The Competent Person has reviewed the available QAQC data and considers that the sample preparation techniques are industry standard and appropriate to the style of mineralisation. The relatively poor precision of duplicate assays of field re-split samples is typical of sampling in orogenic gold deposits.
Quality of assay The nature, quality and appropriateness of the assaying and laboratory All RC and diamond core samples have been assayed by 50g fire assay with AAS determination by Intertek Testing Services data and procedures used and whether the technique is considered partial or Ghana at their Tarkwa assay laboratory. The technique is considered a total extraction technique.
laboratory tests total.
Quality control procedures included submission of coarse blanks (1:20) and certified reference standards (1:20). For geophysical tools, spectrometers, handheld XRF instruments, etc., the parameters used in determining the analysis including instrument
PERSEUSMINING.COM 10
make and model, reading times, calibrations factors applied and their The Competent Person has analysed the available information indicates that the assaying of RC and core samples is free derivation, etc. from any significant biases and is of acceptable accuracy.
Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision have been established.
Verification of The verification of significant intersections by either independent or Numerous significant mineralised intersections have been checked against visual alteration and sulphide mineralisation in sampling and alternative company personnel. drill chips and core.
assaying
The use of twinned holes. One core hole drilled to deliberately twin two RC holes returned gold grades of similar tenor over similar widths to those in the RC holes:
Documentation of primary data, data entry procedures, data verification, data storage (physical and electronic) protocols. NKS0218DD: 58.8m @ 0.85g/t Au
Discuss any adjustment to assay data. NKS0026RC : 54m @ 0.77g/t Au
NKS0139RC : 56m @ 1.02g/t Au
Geology, structure and geotechnical logs are paper based. Sample intervals are recorded in pre-numbered sample ticket books. All logging, sample interval and survey data are manually entered to digital form on site and stored in an acQuire relational database. Data exports are normally in the form of MS Access files.
Data verification procedures include automated checks to:
- prevent repetition of sample numbers
- prevent overlap of from-to intervals in logging and sample interval data
- ensure that total hole depths in collar, assay and geology tables match
- ensure that drill collar coordinates are within the project’s geographic limits
Down-hole survey data are examined for large deviations in dip or azimuth that may represent erroneous data or data entry errors and corrected on a case-by-case basis including estimates of dips and azimuths where the original data appear to be in error.
Additional data checks include viewing drill hole traces, geological logging and assays in plan and section views.
The Competent Person’s independent checks of database validity included: Comparison of assay values between nearby holes, checking for internal consistency between, and within database tables, comparisons between assay results from different sampling phases. Additional checking included comparing database assay entries with laboratory source files. These checks showed no significant discrepancies in the database used for resource estimation.
Location of data Accuracy and quality of surveys used to locate drill holes (collar and Drill hole collars have been surveyed by qualified mine surveyors using differential GPS equipment with coordinates points down-hole surveys), trenches, mine workings and other locations used recorded in UTM grid, WGS84 Zone 30N datum.
in Mineral Resource estimation.
All RC and diamond core holes have been surveyed at 12m depth and at approximately 30m down-hole increments Specification of the grid system used. thereafter using digital compass instruments.
PERSEUSMINING.COM 11
Quality and adequacy of topographic control. A topographic surface has been established by a drone photogrammetric survey conducted in 2020. After adjustment to match surveyed drill collars as closely as possible, the topographic surface is expected to be reliable to +/- 0.5m.
Topographic control is considered adequate for the current work being undertaken at Nkosuo.
Data spacing and Data spacing for reporting of Exploration Results. The Nkosuo deposit is delineated by regular drilling at 20m spacings on 40m spaced traverses with holes generally dipping distribution at -55 degrees toward 119 degrees (UTM grid) azimuth. The drill pattern has been partially infilled to 20m x 20m in places. Whether the data spacing and distribution is sufficient to establish the Drill coverage generally extends to about 150m vertical depth and to a maximum of about 380m depth.
degree of geological and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s) and classifications The data spacing has established geological continuity of the host granite and has, in the opinion of the Competent Person, applied. defined the continuity of mineralisation sufficiently to permit estimation of Mineral Resources.
Whether sample compositing has been applied.
Orientation of Whether the orientation of sampling achieves unbiased sampling of Drill holes are oriented approximately orthogonal to the strike of the granite body that hosts mineralisation. Mineralised data in relation to possible structures and the extent to which this is known, considering structures within the granite appear to comprise two dominant trends: a series of 50-10m thick stacked zones dipping at geological the deposit type. approximately 20 degrees toward NW and a 10-30m wide steeply-dipping zone close to the eastern granite contact. There structure is no indication that exploration results to date are affected by a significant bias due to orientation.
If the relationship between the drilling orientation and the orientation of key mineralised structures is considered to have introduced a sampling bias, this should be assessed and reported if material.
Sample security The measures taken to ensure sample security. RC and core samples were delivered to the secure core yard compound at Edikan gold mine by Perseus personnel. RC field sample splits and samples of half diamond core were placed in numbered bags and those bags, in turn, placed into polywoven sacks that were closed with plastic cable ties prior to transport to the assay laboratory by laboratory personnel. Security guards were employed at drilling sites and at the core yard compound on a 24 hour per day basis.
Results of field duplicates along with the general consistency of assay results between adjacent drill holes and drilling methods provide confidence in the general reliability of the assay data.
Audits or reviews The results of any audits or reviews of sampling techniques and data. Nkosuo drill hole data have not been subject to any formal audit.
The Competent Person has reviewed the available sampling and assaying quality control data and found no evidence of significant errors or bias likely to significantly affect the reliability of the exploration data. These reviews included checks of database integrity, comparisons between database records and laboratory source files, and review of QAQC information.
The Competent Person considers that the sample preparation, security and analytical procedures adopted for the Nkosuo drilling provide an adequate basis for estimation of Mineral Resources.
The Competent Person considers that the poor sample recoveries in both RC and core drilling of weathered mineralisation potentially increase the risk associated with estimates of Mineral Resources and Ore Reserves at Nkosuo.
PERSEUSMINING.COM 12