Sunday, October 25, 2026
MiningNewsTerminal
Sunday, October 25, 2026 Admin

OGC.TO ·

OceanaGold Announces Ongoing Exploration Success at Haile

Drill Results Exploration Programs

September 11, 2025 News Release

OceanaGold Announces Ongoing Exploration Success at Haile

(VANCOUVER, BC) OceanaGold Corporation (TSX: OGC) (OTCQX: OCANF) ("OceanaGold" or the "Company") is pleased to announce positive results from its exploration and resource conversion drilling programs at the Haile Gold Mine (“Haile”) in the United States.

Gerard Bond, President and CEO of OceanaGold, said “With a record high exploration budget of $10 million at Haile this year, we are delighted by the excellent return on investment we continue to generate through exploration. These exciting results continue to demonstrate the continuity of high-grade mineralization at several deposits across the property, notably at Ledbetter Phase 4, Horseshoe Underground, and the promising new early-stage Pisces and Clydesdale targets. The exploration success continues to highlight the exceptional upside for low-risk organic growth we have within our existing portfolio of assets.”

Drilling Highlights (core length):

Ledbetter Phase 4 (conversion drilling)

• 28.9 m @ 18.33 g/t Au (DDH1279)

  • 8.7 m @ 22.30 g/t Au (DDH1281)

Horseshoe (conversion drilling)

• 16.1 m @ 16.33 g/t Au (UGD0082)

  • 14.6 m @ 10.33 g/t Au (UGD0084)
  • 24.0 m @ 7.99 g/t Au (UGD0085)
  • 22.0 m @ 8.60 g/t Au (UGD0086)
  • 10.2 m @ 11.12 g/t Au (UGD0084)

Pisces (Initial drilling, located 300 m south of Horseshoe)

  • 7.6 m @ 10.39 g/t Au (DDH1271)
  • 6.6 m @ 3.34 g/t Au (DDH1290)

Clydesdale (initial drilling, located 100 m northwest of Palomino)

  • 26.2 m @ 4.11 g/t Au (DDH1282)

Results can be viewed in 3D using VRIFY at the following link:

https://vrify.com/meetings/recordings/c880f1e8-449e-41a1-916c-125c8df72661

VRIFY note: Drill results reflect only those set forth in OceanaGold’s press release dated September 11, 2025, and do not include all historical drill results except those relevant to the current targets in this release.

Ledbetter Phase 4 – High-Grade Results Targeting Underground Resource Conversion

Mineralization in Ledbetter Phase 4 is located within the current final phase of the open pit Mineral Reserve (Figure 1). An ongoing resource conversion drill program is enhancing resource confidence and providing samples for metallurgical testing in support of the current trade-off study for the evaluation of a potential underground mine at Ledbetter, which has potential for improved overall site economics.

A zone of mineralization, down-dip of Ledbetter Phase 4 extension, has been tested with a total of four holes, or 1,975 metres (“m”). The program has returned results with strong mineralized intersections: 28.9 m @ 18.33 g/t Au from 489.1 m including 1.3 m @ 189.22 g/t (DDH1279), and 8.7 m @ 22.30 g/t Au from 375.9 m including 5.0 m @ 35.86 g/t (DDH1281).

Figure 1: Schematic cross section (looking northeast) showing Ledbetter mineralization with recent drill holes annotated.

Horseshoe Underground – Support for Additional Resource Growth

At Horseshoe Underground, drilling continues on both resource conversion and definition programs, totalling 7,467 m from 24 holes since the February 2025 news release. Conversion drilling totalling 4,261 m in 14 holes has targeted Inferred Mineral Resources in the lower levels of the deposit. Notable intercepts include: 16.1 m @ 16.33 g/t Au from 274.3 m (UGD0082) and 14.6 m @ 10.33 g/t from 235.6 m (UGD0084), 24.0 m @ 7.99 g/t from 258.6 m (UGD0085) and 22.0 m @ 8.60 g/t from 259.3 m (UGD0086); the latter three holes extending high-grade mineralization to the southwest.

Definition drilling totalling 10 holes for 3,206 m has targeted step-out opportunities, primarily south and west of the current resource. Assay results for nine holes have been received with the following significant intercepts: 7.6 m @ 3.63 g/t Au from 271.0 m and 9.1 m @ 3.40 g/t Au from 299.9 m (UGD0097) and 5.0 m @ 5.64 g/t Au from 267.9 m (UGD0100). The definition drill program is ongoing with 2,600 m remaining to be drilled in 2025. These results demonstrate the potential for continued resource growth, and drilling will remain focused on further defining step-out targets to support future underground development.

Figure 2: Schematic long section (looking northwest) showing Horseshoe mineralization with recent significant intercepts annotated.

Pisces – Initial Drilling of High-Grade Target

The Pisces target is located along the prospective corridor between the Horseshoe and Palomino deposits at approximately 550 m below surface and close to existing and planned underground infrastructure.

A total of nine holes for 6,167 m has been drilled in 2025, with the testing of geological and grade continuity. Significant intercepts include: 7.6 m @ 10.39 g/t Au from 647.0 m (DDH1271), 6.8 m @ 2.60 g/t Au from 571.0 m (DDH1285) and 6.6 m @ 3.34 g/t Au (DDH1290), demonstrating continuity of mineralization in the eastern area of the target towards Horseshoe. See the VRIFY link for visual representation of the results.

In conjunction with previously reported results, 44.2 m @ 10.85 g/t Au from 591 m (DDH1267), 9.4 m @ 44.14 g/t Au from 686.1 m (DDH1269) and 42.7 m @ 6.07 g/t Au from 560.2 m (DDH1257), (released February 24, 2025), the highest-grade mineralization defines a 150 m strike length. This zone of highergrade mineralization remains to be further tested, while the target remains open to the northeast towards Horseshoe and down-dip.

Clydesdale – Successful Early-Stage Result

The early-stage Clydesdale drill target is located 100 m northwest of Palomino and approximately 300 m stratigraphically lower at approximately 800 m below surface. The target is defined by anomalous gold grades in wall rock metasediments, anomalous pathfinder geochemistry, and alteration mineralogy (Table 2). A total of two holes totalling 1,600 m have been drilled in 2025 to test the target. Initial results have returned one significant intercept of 26.2 m @ 4.11 g/t Au from 780.7 m including 14.6 m @ 6.21 g/t Au (DDH1282). See the VRIFY link for visual representation of the results.

Follow-up drilling is ongoing with two additional holes to be completed by the end of the year for a total of 1,800 m.

Figure 3: Plan map showing 2025 drillhole locations

Table 1: Haile drill intersections subsequent to the February 24, 2025, drill results update.

Hole IDFromToIntervalAuTargetActivity
(m)(m)(m)(g/t)
DDH1278NSRLedbetter 04Conversion
DDH1279489.1519.228.918.33Ledbetter 04Conversion
Including505.5506.81.3189.22Ledbetter 04Conversion
DDW1280NSRLedbetter 04Conversion
DDH1281375.9384.58.722.30Ledbetter 04Conversion
Including375.9380.95.035.86Ledbetter 04Conversion
UGD0079197.2206.49.12.49HorseshoeConversion
And275.5276.91.412.14HorseshoeConversion
UGD0080207.6213.55.93.56HorseshoeConversion
UGD0081NSRHorseshoeConversion
UGD0082274.3290.316.116.33HorseshoeConversion
UGD0083NSRHorseshoeConversion
UGD0084235.6250.214.610.33HorseshoeConversion
Including244.8247.83.137.14HorseshoeConversion
And263.0273.310.211.12HorseshoeConversion
UGD0085258.6282.624.07.99HorseshoeConversion
UGD0086259.3281.322.08.60HorseshoeConversion
UGD0088238.6247.89.21.97HorseshoeConversion
UGD0089217.2231.714.52.46HorseshoeConversion
And236.0243.87.89.24HorseshoeConversion
Including242.7243.40.742.60HorseshoeConversion
UGD0090NSRHorseshoeConversion
UGD0091NSRHorseshoeConversion
UGD0092NSRHorseshoeConversion
UGD0093NSRHorseshoeConversion
UGD0094NSRHorseshoeDefinition
UGD0095NSRHorseshoeDefinition
UGD0096NSRHorseshoeDefinition
UGD0097271.0278.67.63.63HorseshoeDefinition
And299.9309.19.13.40HorseshoeDefinition
UGD0098NSRHorseshoeDefinition
UGD0099NSRHorseshoeDefinition
UGD0100267.9272.95.05.64HorseshoeDefinition
UGD0101NSRHorseshoeDefinition
UGD0102NSRHorseshoeDefinition
UGD0103NSRHorseshoeDefinition
DDH1271647.0654.67.610.39PiscesInitial Drilling
DDH1272551.4563.612.20.26PiscesInitial Drilling
DDH1274607.5609.01.53.21PiscesInitial Drilling
DDH1277599.4600.81.41.02PiscesInitial Drilling
DDH1285522.3529.87.51.79PiscesInitial Drilling
And571.0577.86.82.60PiscesInitial Drilling
DDH1286627.7632.04.30.57PiscesInitial Drilling
DDH1290642.4648.96.63.34PiscesInitial Drilling
DDH1293536.2543.47.22.56PiscesInitial Drilling
UGD0109413.0431.318.30.22PiscesInitial Drilling
DDH1276400.5406.66.12.30ClydesdaleInitial Drilling
DDH1282768.6772.43.85.27ClydesdaleInitial Drilling
DDH1282780.7806.926.24.11ClydesdaleInitial Drilling
Including792.2806.914.66.21ClydesdaleInitial Drilling

Notes:

  • Intervals are core length, not true width.

“Initial Drilling” intercepts are associated with early-stage exploration drilling, “Definition” drilling intercepts are intercepts outside the current resource model shell directed at defining mineralization to an Inferred Resource category and “Conversion” drilling are intercepts converting Inferred Resources to Indicated Resources category. NSR = No Significant Result.

Table 2: Historical and OGC Haile drill intersections relevant to the Ledbetter 04, Pisces, and Clydesdale target areas.

Hole IDFromToIntervalAuTargetActivity
(m)(m)(m)(g/t)
DDH0436NSRLedbetter 04Initial Drilling
DDH0439NSRLedbetter 04Initial Drilling
DDH0450NSRLedbetter 04Initial Drilling
DDH0451NSRLedbetter 04Initial Drilling
DDH0461NSRLedbetter 04Initial Drilling
DDH0632^NSRLedbetter 04Initial Drilling
DDH0638^469.2478.99.82.42Ledbetter 04Initial Drilling
DDH0646^NSRLedbetter 04Initial Drilling
DDH0653^*465.8478.112.31.82Ledbetter 04Initial Drilling
DDH0686^NSRLedbetter 04Initial Drilling
DDH0841^401.4407.56.13.81Ledbetter 04Initial Drilling
DDH1201^NSRLedbetter 04Advanced Drilling
DDH1207^NSRLedbetter 04Advanced Drilling
DDH1208^NSRLedbetter 04Advanced Drilling
DDH1213^468.3481.813.52.95Ledbetter 04Advanced Drilling
DDH1252^NSRLedbetter 04Conversion
DDH1253^NSRLedbetter 04Conversion
DDH1255^431.9443.811.92.88Ledbetter 04Conversion
DDH1256^431.5438.26.72.63Ledbetter 04Conversion
DDH1260^NSRLedbetter 04Conversion
RC2002NSRLedbetter 04Initial Drilling
RC2019NSRLedbetter 04Initial Drilling
RC2058441.9461.819.85.27Ledbetter 04Initial Drilling
RC2064NSRLedbetter 04Initial Drilling
RC2067NSRLedbetter 04Initial Drilling
RC2108NSRLedbetter 04Initial Drilling
RCT0050NSRLedbetter 04Initial Drilling
RCT0067NSRLedbetter 04Initial Drilling
RCT0068NSRLedbetter 04Initial Drilling
RCT0088NSRLedbetter 04Initial Drilling
RCT0134432.8445.012.22.16Ledbetter 04Initial Drilling
RCT0149NSRLedbetter 04Initial Drilling
RCT0161428.5441.913.542.40Ledbetter 04Initial Drilling
Including429.8431.31.5318.52Ledbetter 04Initial Drilling
RCT0167410.7441.931.24.85Ledbetter 04Initial Drilling
RCT0203NSRLedbetter 04Initial Drilling
RCT0204438.9445.06.14.51Ledbetter 04Initial Drilling
DDH0599^NSRPiscesInitial Drilling
DDH0636^545.4550.95.52.81PiscesInitial Drilling
And597.9611.613.72.31PiscesInitial Drilling
DDH1067^NSRPiscesInitial Drilling
DDH1204^NSRPiscesInitial Drilling
DDH1245^NSRPiscesInitial Drilling
DDH1247^**NSRPiscesInitial Drilling
RCT0012356.6358.11.59.10PiscesInitial Drilling
And399.3413.013.73.24PiscesInitial Drilling
RCT0028NSRPiscesInitial Drilling
RCT0077NSRPiscesInitial Drilling
RCT0080144.8152.47.62.21PiscesInitial Drilling
And193.6202.79.13.89PiscesInitial Drilling
And251.8262.110.44.31PiscesInitial Drilling
RCT0091528.8538.09.15.61PiscesInitial Drilling
RCT0146NSRPiscesInitial Drilling
DDH1177^527.7535.27.53.65PalominoInitial Drilling
RCT0051510.5521.410.91.65ClydesdaleInitial Drilling
And634.0649.815.91.90ClydesdaleInitial Drilling
And713.2725.412.23.16ClydesdaleInitial Drilling
RCT0110269.8281.912.21.89ClydesdaleInitial Drilling
And507.2511.94.73.33ClydesdaleInitial Drilling
And526.8538.011.23.41ClydesdaleInitial Drilling
And774.2780.36.13.39ClydesdaleInitial Drilling
And823.0827.54.65.36ClydesdaleInitial Drilling
RCT0117502.9509.06.12.22ClydesdaleInitial Drilling
And600.5614.213.73.35ClydesdaleInitial Drilling
And641.6649.27.61.66ClydesdaleInitial Drilling
And688.9693.44.64.70ClydesdaleInitial Drilling
RCT0118519.6527.37.72.37ClydesdaleInitial Drilling

Notes:

  • Intervals are core length, not true width.

• “Initial Drilling” intercepts are associated with early-stage exploration drilling, while “Conversion” drilling are intercepts converting Inferred Resources to Indicated Resources category. NSR = No Significant Result. All data, apart from holes marked “^”represent historical drilling conducted by Romarco Minerals prior to OceanaGold’s ownership of Haile

  • “^” represents OceanaGold holes.
  • “*” represents drill hole results reported by OceanaGold in its press release dated November 8, 2017.
  • “**” represents drill hole results reported by OceanaGold in its press release dated February 24, 2025.
  • All historical drill data collected by Romarco Minerals are considered historical in nature and based on prior data and reports prepared by Romarco Minerals. A qualified person from the Company has not undertaken independent investigation of the sampling nor has it independently analyzed the results of the historical drilling to verify the results. OceanaGold is not treating the historical data as current. There can be no assurance that any of the historical drill data is representative.

For further information relating to drill hole data please refer to the Company’s website at https://investors.oceanagold.com/additional-drillhole-data.

About OceanaGold

OceanaGold is a growing intermediate gold and copper producer committed to safely and responsibly maximizing the generation of Free Cash Flow from our operations and delivering strong returns for our shareholders. We have a portfolio of four operating mines: the Haile Gold Mine in the United States of America; the Didipio Mine in the Philippines; and the Macraes and Waihi operations in New Zealand.

For further information please contact:

Investor Relations:

Haley Mayers, VP, Investor Relations Tel: +1 604-678-4097 [email protected]

Valerie Burns, Manager, Investor Relations Tel: +1 604-235-0742 [email protected]

Media Relations:

Louise Burgess, VP, Communications Tel: +1 604-403-2019 [email protected]

Qualified Person Statement

The scientific and technical information relating to the Haile exploration results contained in this press release has been reviewed and approved by Craig Feebrey, a Member of the Australasian Institute of Mining and Metallurgy and a qualified person under National Instrument 43-101 – Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators (“NI 43-101”). Mr. Feebrey is the Executive Vice President and Chief Exploration Officer of OceanaGold.

Quality Assurance and Quality Control (“QA/QC”)

From July 2017 to 2025 almost all Haile exploration core samples have been prepared at the ALS lab in Tucson, Arizona, and analyzed at the ALS lab in Reno, Nevada, each of which is independent from OceanaGold. Select resource conversion core samples were also prepared and analyzed at the SGS lab in Kershaw, South Carolina in 2025 which is also independent from OceanaGold, with confirmation pulp duplicates sent to the ALS lab in Reno, Nevada. Samples are pulverized from a 250g (ALS) or 450g (SGS) sample to 85% passing 75 mesh. Approximately 225g of pulp sample is used for fire assay. Assays are based on a 30g fire assay aliquot for gold with Atomic Absorption finish. If the gold value from Atomic Absorption is >10g/t, an additional 30g of pulp sample is fire assayed for gold using a gravimetric finish.

Some holes are composited and analyzed for carbon, sulphur and multi-elements using LECO and ICP- OES methods. Both ALS and SGS labs used for OceanaGold samples are ISO 17025 certified.

Blanks and standards are each inserted every 20th sample. Precision and accuracy of certified reference materials (“CRMs”) compared to expected values have been consistently within 5% RSD and often within 3%. Barren marble and sand are inserted as blanks every 20th sample. CRMs from RockLabs and OREAS are inserted every 20th sample (5%). All blanks and CRMs are handled by the OceanaGold Geology Team and are stored in the locked OceanaGold office.

All drill hole samples are handled and transported from the drill rigs to the secured Haile Exploration warehouse by OceanaGold personnel or contractors. Access to the property is controlled by locked doors and cameras monitored by OceanaGold security. The main gate requires an electronic employee badge to enter. Samples are packaged at the Haile Exploration warehouse by OceanaGold geologists and geotechnicians. Samples are trucked in sealed plastic barrels by certified couriers with submittal forms that are verified during sample pick-up and delivery to ALS. No sample shipments have been recorded as missing or tampered with.

Technical Report

For further information, please refer to the following NI 43-101 technical report available on the SEDAR+ website at www.sedarplus.com under the Company’s profile or on the Company’s website at www.oceanagold.com: "NI 43-101 Technical Report Haile Gold Mine Lancaster County, South Carolina" dated March 28, 2024, with an effective date of December 31, 2023, prepared by D. Carr, D, Londoño, J. Moore and B. Drury (OceanaGold); L. Standridge and R. Cook (Call & Nicholas, Inc.); J.N. Janney-Moore and W.L. Kingston (NewFields Mining & Technical Services LLC); and M. Sullivan and B. Miller Clarkson (SRK Consulting (U.S.), Inc.).

Cautionary Statement for Public Release

This press release contains certain "forward-looking statements" and "forward-looking information" (collectively, "forward-looking statements") within the meaning of applicable Canadian securities laws which may include, but is not limited to, statements with respect to the estimation of Mineral Reserves and Resources, potential Mineral Reserves and Resources growth, the realization of Mineral Reserves and Resources estimates, costs and timing of the development of new deposits and, costs and timing of future exploration and drilling programs. Forward-looking statements and information relate to future performance and reflect the Company’s expectations regarding the generation of Free Cash Flow, execution of business strategy, future growth, future production, estimated costs, results of operations, business prospects and opportunities of OceanaGold and its related subsidiaries. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects" or "does not expect", "is expected", "anticipates" or "does not anticipate", "plans", "estimates" or "intends", or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved) are not statements of historical fact and may be forward-looking statements. Forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those expressed in the forward-looking. They include, among others, those risk factors identified in the Company’s most recent Annual Information Form prepared and filed with securities regulators which is available on SEDAR+ at www.sedarplus.com under the Company’s name and on the Company’s website. There are no assurances the Company can fulfil forward-looking statements. Such forward-looking statements are only predictions based on current information available to management as of the date that such predictions are made; actual events or results may differ materially as a result of risks facing the Company, some of which are beyond the Company's control. Although the Company believes that any forward-looking statements contained in this press release is based on reasonable assumptions, readers cannot be assured that actual outcomes or results will be consistent with such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company expressly disclaims any intention or obligation to update or revise any forward-looking statements and information, whether as a result of new information, events or otherwise, except as required by applicable securities laws.