Nuinsco Files 43‐101 Technical Report for  Prairie Lake Critical Minerals & Phosphate Project 

Toronto, July 18, 2022 – Nuinsco Resources Limited (“Nuinsco” or the “Company”) (CSE: NWI) today announced the filing of a National Instrument 43‐101 (“NI 43‐101”) Technical Report (the “Technical Report”) for the initial Mineral  Resource  Estimate  (“MRE”)  for  the  Prairie  Lake  Critical  Minerals  and  Phosphate  Project  located  near Terrace  Bay,  Ontario  (“Prairie  Lake”  or  the  “Project”).  The  Technical  Report  is  available  for  review  at www.sedar.com and the Company's website (www.nuinsco.ca).

HIGHLIGHTS of the MRE Include: 

  • 871.8 million tonne Inferred Mineral Resource including 2.01 kg/t total rare earth oxides (“TREO”), plus 

niobium and phosphate. 

  • 15.6 million tonne Indicated Mineral Resource including 1.67 kg/t TREO, plus niobium and phosphate. 
  • Substantial potential remains to expand and upgrade the MRE. 
  • Situated in Ontario, Canada, a stable, mining friendly, jurisdiction – a potential key North American 

source of Critical Minerals to meet an anticipated enormous expansion in demand for such products. 

  • Project  is  exceptionally  close  to  the  TransCanada  Highway,  rail,  electrical  power,  and  shipping 

infrastructure. 

“The completion and filing of the Prairie Lake Project MRE is another step forward in the evaluation of the Project,” said Paul Jones, Nuinsco’s CEO.  "The Company is also conducting preliminary economic studies and examining a metallurgical program to better define the characteristics of the mineralization and enhanced potential for recovery and concentration of elements of economic interest.  The exceptional endowment of sought‐after commodities in the Project, many identified as Critical Elements defined under the Canadian Minerals and Metals Plan, combined with outstanding technical and logistical attributes make Prairie Lake a very significant asset to the Company.”

As tabulated below, the pit‐constrained MRE consists of a 15.6 million tonne Indicated Mineral Resource and a very large 871.8 million tonne Inferred Mineral Resource in accordance with National Instrument 43‐101. The MRE also includes  niobium  and  phosphate  in  oxides  which,  along  with  the  TREO,  are  expected  to  be  key  drivers  of  a Preliminary Economic Assessment on the Project that will commence shortly.

Prairie Lake Project Pit‐Constrained Mineral Resource Estimate(1‐6)

Rare Earth OxidesNiobiumPhosp hate
ClassCut‐OffTonnesNd O 2 3Pr O 6 11Sc O 2 3CeO 2La O 2 3Sm O 2 3Ta O 2 5Y O 2 3TREONb O 2 5P O 2 5
NSR C$/tMg/tg/tg/tg/tg/tg/tg/tg/tkg/t%%
Indicated3015.6344961575430058281001.670.163.71
Inferred30871.8409821890538879171272.010.103.39

*TREO = Total Rare Earth Oxides: neodymium, Nd2O3 ; praseodymium, Pr6O11; scandium, Sc2O3; Cerium, CeO2; lanthanum, La2O3; samarium, Sm2O3; tantalum, Ta2O5; yttrium, Y2O3.

1.  Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. 

The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio‐ political, marketing, or other relevant issues. 

3.  The Inferred Mineral Resource in this estimate has a lower level of confidence than that applied to an Indicated Mineral  Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of the Inferred  Mineral Resource could potentially be upgraded to an Indicated Mineral Resource with continued exploration. 

4. The Mineral Resources were estimated in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum  (CIM), CIM Standards on Mineral Resources and Reserves, Definitions (2014) and Best Practices Guidelines (2019)  prepared by the CIM Standing Committee on Reserve Definitions and adopted by the CIM Council. 

5.  US$ Metal prices used were $80/Kg Nd2O3, $80/Kg Pr6O11, $1,500/Kg Sc2O3, $50/Kg Nb2O5, $250/t P2O5, $1.35/Kg CeO2,  $1.35/Kg La2O3, $3.50/Kg Sm2O3, Nil$/t Ta2O5 and $13/kg Y2O3, 0.78 FX all with combined process recoveries and  payables of 50%,  except P2O5 at 75%.  

6.  The constraining pit optimization parameters were C$2.50/t mining cost for all material, C$25/t process cost, C$5/t  G&A cost and 45‐degree pit slopes with a C$30/t NSR cut‐off. 

The Prairie Lake MRE was conducted in accordance with NI 43‐101 standards of disclosure and the CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014) and Best Practices (2019).  The Project benefits from a location in a politically stable jurisdiction; is exceptionally well located near available rail, road, shipping, and power infrastructure; and is ideally placed in North America with respect to current supply chain concerns for critical minerals.

The mineralization of economic interest contained within the Prairie Lake complex occurs at surface and extends to unknown depths below the deepest drilling yet conducted (circa 525 metres vertically). There is no indication that mineralization diminishes with depth and is known to occur at surface throughout the extents of the complex.

Prairie Lake Project Pit‐Constrained Mineral Resource Estimate Sensitivity to NSR Cut‐Off 

ClassCut‐OffTonnesNd O 2 3Pr O 6 11Sc O 2 3CeO 2La O 2 3Sm O 2 3Ta O 2 5Y O 2 3TREO*Nb O 2 5P O 2 5
NSR C$/tMg/tg/tg/tg/tg/tg/tg/tg/tkg/t%%
Indicated5014.53581001678730660281011.730.173.75
4015.2349981576630259281011.690.173.73
3015.6344961575430058281001.670.163.71
2015.7343961575130058271001.660.163.70
1015.7343961575130058271001.660.163.70
Inferred50815.1419831993039481171272.060.103.43
40860.1412821991138980171282.020.103.40
30871.8409821890538879171272.010.103.39
20873.4409821890438779171272.010.103.38
10873.5409821890438779171272.010.103.38

Prairie Lake consists of 46 mineral claims covering an area of ~630 ha and is superbly located, easily accessed by an all‐weather road from the TransCanada Highway located 28 kilometres to the south. The MRE for the Project is based on 73 inclined diamond drill holes performed between 1969 and 2010 totalling 12,180 metres. Additionally 2,068 metres of surface trenching is included in the MRE.  A total of 5,409 drill core samples and 1,042 channel samples are incorporated into the MRE, excluding QA/QC samples.  A composite length of 1.5 metres was used and they were capped as follows: 1,850 g/t Nd2O3, 250 g/t Pr6O11, no cap Sc2O3, 1% Nb2O5, 14% P2O5, 3,700 g/t CeO2, 1,700 g/t La2O3, 520 g/t Sm2O3, no cap Ta2O5 and 570 g/t Y2O3. Grade interpolation was undertaken with the ID2 method on 10m x 10m x 10m blocks. Indicated Mineral Resources were classified within a 55m x 55m x 40m search ellipse and three drill holes while Inferred Mineral Resources were classified in two passes with a 110m x 110m x 80m search ellipse with two drill holes and subsequently a 220m x 220 m x 160m search ellipse with one drill hole.

Historical drill core analyses were performed by Xray Assay Laboratories (Don Mills, Ontario) and Bondar Clegg and Company  Ltd  (Ottawa,  Ontario).    All  analyses  since  2007  have  been  performed  at  Activation  Laboratories  in Ancaster, Ontario (ISO/IEC 17025:2005); samples were delivered to the Activation Laboratories facility in Thunder Bay (ISO/IEC 17025:2005), Ontario for preparation and onward delivery to Ancaster.

Eugene Puritch, P.Eng., FEC, CET acts as Nuinsco's independent Qualified Person under National Instrument 43‐ 101. Mr. Puritch has reviewed and approved the technical contents of this news release.

About Nuinsco Resources Limited 

Nuinsco Resources has over 50 years of exploration success and is a growth‐oriented, multi‐commodity mineral exploration company focused on prospective opportunities in Canada and internationally. Currently the Company has four properties in Ontario – the high‐grade Sunbeam Gold Property near Atikokan, the Dash Lake Gold Property near Terrace Bay, the large multi‐commodity (rare‐earths, niobium, tantalum, phosphate) Prairie Lake project near Terrace  Bay,  and  the  Zig  Zag  Lake  Property  (lithium,  tantalum)  near  Armstrong.  In  addition,  Nuinsco  has  an agreement for gold exploitation at the El Sid Project in the Eastern Desert of Egypt.

Cautionary Note Regarding Forward‐Looking Information 

This press release contains forward‐looking statements or information (collectively, “FLI”) within the meaning of  applicable Canadian securities legislation. FLI is based on expectations, estimates, projections and interpretations  as at the date of this press release.  

All  statements,  other  than  statements  of  historical  fact,  included  herein  are  FLI  that  involve  various  risks,  assumptions, estimates and uncertainties. Generally, FLI can be identified by the use of statements that include  words  such  as  “seeks”,  “believes”,  “anticipates”,  “plans”,  “continues”,  “budget”,  “scheduled”,  “estimates”,  “expects”, “forecasts”, “intends”, “projects”, “predicts”, “proposes”, "potential", “targets” and variations of such  words and phrases, or by statements that certain actions, events or results “may”, “will”, “could”, “would”, “should”  or “might”, “be taken”, “occur” or “be achieved.” 

FLI herein  includes, but is not limited  to: future  drill results;  the Company’s  ability  to convert Inferred  Mineral  Resources into Measured and Indicated Mineral Resources; environmental matters; stakeholder engagement and  relationships; parameters and methods used to estimate the MRE at Prairie Lake; the prospects, if any, of the  Project; future drilling at the Deposits; and the significance of historical exploration activities and results.  

FLI is designed to help you understand management’s current views of its near‐ and longer‐term prospects, and it  may not be appropriate for other purposes.  FLI by their nature are based on assumptions and involve known and  unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of  the Company to be materially different from any future results, performance or achievements expressed or implied  by such FLI. Although the FLI contained in this press release is based upon what management believes, or believed  at the time, to be reasonable assumptions, the Company cannot assure shareholders and prospective purchasers of  securities of the Company that actual results will be consistent with such FLI, as there may be other factors that  cause results not to be as anticipated, estimated or intended, and neither the Company  nor any other person  assumes responsibility for the accuracy and completeness of any such FLI.  Except as required by law, the Company  does not undertake, and assumes no obligation, to update or revise any such FLI contained herein to reflect new  events or circumstances, except as may be required by law. Unless otherwise noted, this press release has been  prepared based on information available as of the date of this press release. Accordingly, you should not place undue  reliance on the FLI or information contained herein.  

Furthermore,  should  one  or  more  of  the  risks,  uncertainties  or  other  factors  materialize,  or  should  underlying  assumptions prove incorrect, actual results may vary materially from those described in FLI. 

Assumptions upon which FLI is based, without limitation, include: the ability of exploration activities to accurately  predict  mineralization;  the  accuracy  of  geological  modelling;  the  ability  of  the  Company  to  complete  further  exploration activities; the legitimacy of title and property interests in the Project; the accuracy of key assumptions,  parameters or methods used to estimate the MRE; the ability of the Company to obtain required approvals; the  results  of  exploration  activities;  the  evolution  of  the  global  economic  climate;  metal  prices;  environmental  expectations;  community  and  non‐governmental  actions;  and  any  impacts  of  COVID‐19  on  the  Project,  the  Company’s  financial  position,  the  Company’s  ability  to  secure  required  funding,  or  operations.  Risks  and  uncertainties  about  the  Company’s  business  are  more  fully  discussed  in  the  disclosure  materials  filed  with  the  securities regulatory authorities in Canada, which are available at www.sedar.com. 

Information Concerning Estimates of Mineral Resources 

The disclosure in this press release and referred to herein was prepared in accordance with NI 43‐101 which differs  significantly  from  the  requirements  of  the  U.S.  Securities  and  Exchange  Commission  (the  "SEC").    The  terms  "Measured Mineral Resource", "Indicated Mineral Resource" and "Inferred Mineral Resource" used in this press  release are in reference to the mining terms defined in the Canadian Institute of Mining, Metallurgy and Petroleum  Standards  (the  "CIM  Definition  Standards"),  which  definitions  have  been  adopted  by  NI  43‐101.    Accordingly,  information contained in this press release providing descriptions of our mineral deposits in accordance with NI 43‐ 101 may not be comparable to similar information made public by other U.S. companies subject to the United States  federal securities laws and the rules and regulations thereunder. 

Investors are cautioned not to assume that any part or all of Mineral Resources will ever be converted into reserves.  Pursuant to CIM Definition Standards, "Inferred Mineral Resources" are that part of a Mineral Resource for which  quantity  and  grade  or  quality  are  estimated  on  the  basis  of  limited  geological  evidence  and  sampling.    Such  geological evidence is sufficient to imply but not verify geological and grade or quality continuity.  An Inferred  Mineral Resource has a lower level of confidence than that applying to an Indicated Mineral Resource and must not  be  converted  to  a  Mineral  Reserve.  However,  it  is  reasonably  expected  that  the  majority  of  Inferred  Mineral  Resources could be upgraded to Indicated Mineral Resources with continued exploration.  Under Canadian rules,  estimates of Inferred Mineral Resources may not form the basis of Feasibility or Pre‐Feasibility studies, except in  rare cases.  Investors are cautioned not to assume that all or any part of an Inferred Mineral Resource is economically  or legally mineable.  Disclosure of "contained ounces" in a Mineral Resource is permitted disclosure under Canadian  regulations;  however,  the  SEC  normally  only  permits  issuers  to  report  mineralization  that  does  not  constitute  "reserves" by SEC standards as in place tonnage and grade without reference to unit measures. 

Canadian standards, including the CIM Definition Standards and NI 43‐101 (2014), differ significantly from standards  in the SEC Industry Guide 7.  Effective February 25, 2019, the SEC adopted new mining disclosure rules under subpart  1300 of Regulation S‐K of the United States Securities Act of 1933, as amended (the "SEC Modernization Rules"),  with compliance required for the first fiscal year beginning on or after January 1, 2021.  The SEC Modernization  Rules replace the historical property disclosure requirements included in SEC Industry Guide 7.  As a result of the  adoption of the SEC Modernization Rules, the SEC now recognizes estimates of "Measured Mineral Resources",  "Indicated  Mineral  Resources"  and  "Inferred  Mineral  Resources".    Information  regarding  Mineral  Resources  contained  or  referenced  in  this  press  release  may  not  be  comparable  to  similar  information  made  public  by  companies  that  report  according  to  U.S.  standards.    While  the  SEC  Modernization  Rules  are  purported  to  be  "substantially similar" to the CIM Definition Standards, readers are cautioned that there are differences between  the SEC Modernization Rules and the CIM Definitions Standards. Accordingly, there is no assurance any Mineral  Resources that the Company may report as "Measured Mineral Resources", "Indicated Mineral Resources" and  “Inferred Mineral Resources" under NI 43‐101 would be the same had the Company prepared the Mineral Resource  Estimates under the standards adopted under the SEC Modernization Rules.

To learn more, please visit www.nuinsco.ca or contact:
Paul Jones, CEOPaul Jones, CEOSean Stokes, Executive VPCathy Hume, ConsultantCathy Hume, ConsultantInstagram:
@nuinscoresources
[email protected][email protected][email protected]Twitter:
@NWIResources