Saturday, October 17, 2026
MiningNewsTerminal
Saturday, October 17, 2026 Admin

NUAG.TO ·

New Pacific Metals Reports Inaugural Resource Estimate for the Silver Sand Deposit, Bolivia

Resource Estimates Technical Reports (NI 43-101)

NEWS REL LEASE  

Trading Sy ymbol:    TSX‐V V: NUAG OTCQ QX: NUPMF 

New Pacific Metals s Reports Inaugural R Resource E Estimate for the   Silver Sand S d Deposit, Bolivia 

Vancouver, British Columbia – April 14, 2020 –New PacificMetals Corp.(TSX‐V: NUAG) (OTCQX: NUPMF)
(“New Pacific” or the “Company”) is pleased toreport the first independent NationalInstrument 43‐101
(“NI 43‐101”) MineralResource estimate for its100% ownedSilver SandDeposit, Bolivia. The study was
completed by AMC Mining Consultants (Canada)Ltd. (“AMC”).ril 15, 2020 at 10:30 am Eastern
The Company will hosta webcast to discuss theSilver Sand Project on Ap
Time / 7:30 am PacificTime – details of which are at the bottom of the news release.

eptual  open  pit  mining  co The  resou urce  estimate e  used  prope erty  boundar ry  and  conce onstraints  an nd  are presented d  in  Table  1  using  a  45  g g/t  silver  cut‐off  grade.  T The  model  is depleted  fo or  historical  m mining activities:

eptual Pit1 co Table 1: Silver Sand De eposit ‐ Conce onstrained M Mineral Resource as of 31 D December 20 019. 

ResourcecategoryTonnes (Mt)Ag (g/t)Ag (Moz)
Measured8.4 26.99159 13043.05 112.81
Indicated
Measured& Indicated35.39137155.86
Inferred9.8411235.55

1 Notes:

  • CIM Definition Standards (2014)

) were used for r reporting the e Mineral Resou urces.

  • The Qualified Person is Dinara Nussipakynova, P.Geo. of AMC C Mining Consu ultants (Canada) Ltd.

s are constrained by an optim

  • Mine eral Resources mized pit shell at a metal pri ice of US$18.7 70/oz Ag, recov very of 90% % Ag and Cut-o off grade of 45 g/t Ag.

eral Resources are reported i

  • Mine inside the Claim m boundary.

ning to extend outside the claim to the NE and SW.

  • Pit o optimization allows waste min
  • Drilling results up to 31 December 2019.

exactly due to rounding.

  • The numbers may not compute e
  • Mine eral Resources that are not M Mineral Reserve es do not have e demonstrated d economic via ability.

Source: AM MC

Surrounding the conceptual constrained open pit is a zoneof mineralized material of similar tenor and
grade which has beendrilled at variable distances rangingfrom 25mto plus 100m: The first area
immediately surrounds and encompasses the pit and has been drilled between 25mand 50m distances.
The Company considers this area to contain potential tonnage range of 7Mt to 15Mtand grades ranging
from 85 g/t Ag to 150g/t Ag. This area requires additional engineering studies tobe includedin any

future  mine  plans.     The  second  area  occurs  at  the  southern  end  of  the  Silver  Sand  deposit  and  has received less exploration to date.  The Company has defined an additional tonnages from 10Mt to 20Mt and grades ranging from 85 g/t Ag to 150 g/t Ag exploration target surrounding and below the current defined resource.   Initial drilling has intersected silver mineralization over similar widths and intervals as the main deposit, however, drill density insufficient to categorize the zone as Inferred at this time.   The potential quantity and grade from these two areas are conceptual in nature, there has been insufficient exploration to define a mineral resource, and it is uncertain if further exploration will result in the target being delineated as a mineral resource.

HIGHLIGHTS 

  • Silver Sand is one of the more significant new global primary silver discoveries in the last decade.
  • Mineralization remains open to the North and South and at depth. No feeder zones or source intrusions have been discovered to date.  The Company classifies the exploration potential as good to excellent
  • Detailed drilling indicates good mineral continuity to provide high confidence – lower technical risk. Measured & Indicated tonnes of 35.39 Mt @ 137 g/t Ag for 155.86 Moz or ~70% of the resource estimate.
  • Mineralization starts at or near‐surface and is amenable to potential open‐pit mining extraction: Approximately 70% of the resources are within 200 m of the conceptual open pit surface.
  • Favourable initial metallurgical test work indicates laboratory‐based recoveries of up to 97% for the various oxide – transition and sulphide mineral domains (see news release dated August 23, 2019 for details).
  • Resource estimate excludes the recently discovered Snake Hole zone where drilling intercepted 72.4 m grading 279 g/t Ag (see news release dated January 13, 2020 for details) and the final 37 infill drill holes released on February 19, 2020, which returned high‐grade intervals from the core of the deposit.
  • Technical studies to facilitate the Preliminary Economic Assessment commenced in Q1‐2020 and are ongoing using independent subject matter experts.
  • New Pacific remains well funded to advance the Silver Sand deposit with US$32 million in the treasury.

RESOURCE ESTIMATE DETAILS 

The resource estimate is based on a geological model that included assay results received by New Pacific for the Silver Sand deposit to December 31, 2019. The estimate does not include any drill results from the recently discovered Snake Hole prospect, located 600 m to the east of the Silver Sand resource. A mineralization  wireframe  was  constructed  by  New  Pacific  with  LeapFrog©  software.  The  domain  was reviewed by the independent Qualified Person (QP) and minor modifications made prior to estimation. One  of  the  modifications  was  to  separate  the  one  domain  into  two  separate  domains  based  on  the orientation of modelled zones of continuous mineralization.

AMC completed an ordinary kriging (OK) estimate on these domains. Prior to estimation, drillhole data were composited to 1.4 m and samples were capped for all variables within each domain where required. Silver values for both domains were capped at 1,500 g/t Ag.

In  addition  to  the  OK  estimate  completed  inside  the  domains,  a  background  OK  estimate  was  also completed outside of mineralization wireframes.

The parent block size was 5 mE x 5 mN x 5 mRL with sub‐blocking employed. Sub‐blocking resulted in minimum cell dimensions of 1.25 mE x 1.25 mN x 0.5 mRL.

The background mineralization (outside the mineralization domains) was estimated with a parent block dimension of 10 mE x 10 mN x 10 mRL.

As mineralization is hosted in one rock type, the QP assigned density measurements to the block model based  on  the  mean  density.  Density  values  of  2.54  tonnes/m3 and  2.50  tonnes/m3  were  assigned  to blocks inside and outside of the mineralized domains respectively.

Mineral  Resource  classification  was  completed  using  an  assessment  of  geological  and  mineralization continuity, data quality and data density. Estimation passes were used as an initial guide for classification. Wireframes were then generated manually to build coherent volumes for the different classes.

Table 2 shows the search parameters and number of samples used for each pass. The highest confidence level is Pass 1. The lowest confidence level is Pass 3.

Table 2: Minimum and maximum sample parameters 

X (m)Minimum no. of samplesMaximum no. ofMinimum no. of
PassY (m)Z (m)
samplesdrillholes
130 60 9030 60 9010 20 308 6 424 20 204 3 2
2
3

The block model was assigned Measured, Indicated, and Inferred Mineral Resource classifications.

QA/QC and DATA VERIFICATION 

Qualified  Person,  Simeon  Robinson,  P.Geo.,  considers  sample  preparation,  analytical,  and  security protocols employed by New Pacific to be acceptable. The QP has reviewed the Quality Assurance and Quality Control (QA/QC) procedures used by New Pacific including certified reference materials, blank, duplicate, and umpire data, and has made some recommendations. The QP does not consider these to have  a  material  impact  on  the  Mineral  Resource  estimate  and  considers  the  assay  database  to  be adequate for Mineral Resource estimation.

Dinara Nussipakynova, P.Geo., is the QP for Mineral Resources and data verification. Data verification included a review of the assay database and collar locations. The QP considers the assay database to be acceptable for Mineral Resource estimation.

COVID‐19 ‐ FUTURE WORK 

New  Pacific’s  commitment  to  the  health  and  safety  of  our  team  and  the  communities  in  which  we operate is one of the core values of the Company.  In response to the COVID‐19 pandemic and based on guidance and directives from relevant public health authorities, the Company has elected to temporarily suspend all field‐based operations in Bolivia.  The Company’s Health & Safety Team has implemented Company‐wide safety protocols such as 14‐day self‐isolation where necessary, travel restrictions, remote working and enhanced hygiene controls.  Both of the Company’s corporate offices in Vancouver and La Paz are closed with all staff having implemented work‐from‐home protocols.  New Pacific continues to monitor  the  situation  and  will  return  to  normal  operations  when  it  is  deemed  safe  to  do  so  by  the respective public  health authorities.

In  the  interim,  the  Company  is  actively  completing  detailed  geological  (structural  and geochemical/geometallurgical) studies on the Silver Sand Deposit to support future advanced technical studies.  Advanced discussions with multiple Subject Matter Experts continue in preparation for when field studies are permitted to restart.

In  addition,  members  of  the  Exploration  Team  are  compiling  and  interpreting  results  from  recently completed detailed mapping and sampling work along with target identification/generation at the Silver Sand North Block including for the high priority El Bronce and Jisas targets.

With regards to its regional exploration programs, implementation of the Silverstrike Project has been completed in addition to first‐pass detailed surface mapping and sampling programs.

QUALITY ASSURANCE AND QUALITY CONTROL 

HQ‐size drill core samples from altered and mineralized intervals are split into halves by diamond saw, with  an  average  sample  length  of  between  one  to  one  and  a  half  metres  at  the  Company’s  core processing facility located in Betanzos, a small town located 20 kilometres from the project site.  Half core samples are stored in a secure storage facility in Betanzos for future reference, with the other half shipped in securely sealed bags to ALS Global in Oruro, Bolivia for preparation, and ALS Global in Lima, Peru for geochemical analysis.  All samples are first analyzed by a multi‐element ICP package (ALS code ME‐MS41)  with  ore  grade  over  limits  for  silver,  lead  and  zinc  further  analyzed  using  ALS  code  OG46. Further silver over limits are analyzed by gravimetric analysis (ALS code of GRA21).

A standard quality assurance and quality control (“QAQC”) protocol is employed to monitor the quality of sample preparation and analysis.  Standards of certified reference materials and blanks are inserted into the normal core sample sequences prior to shipping to the lab at a ratio of 20:1 (i.e., every 20 samples contain at least one standard sample and one blank sample).  Duplicate samples of coarse rejects at a ratio of 20:1 are sent to a second internationally accredited lab for check analysis.  The assay results of QAQC samples of standards and blanks do not show any significant bias of analysis or contamination during sample preparation.

QUALIFIED PERSONS 

The  Mineral  Resource  estimate  and  data  verification  was  completed  by  AMC.  Dinara  Nussipakynova, P.Geo., Principal Geologist with AMC is the Qualified Person for the purpose of NI 43‐101 for all technical information  pertaining  to  the  current  Mineral  Resource.    New  Pacific’s  quality  assurance  and  quality control  program  was  reviewed  by  AMC.  Simeon  Robinson,  P.Geo.,  Senior  Geologist  with  AMC  is  the Qualified  Person  for  the  purpose  of  NI  43‐101  for  all  technical  information  pertaining  to  the  current Mineral Resource.  The Qualified Persons under NI 43‐101 have reviewed the technical content of this news release for the Silver Sand deposit and have approved its dissemination.

Further details supporting the geological model, estimation procedure and metallurgical testwork will be available in a NI 43‐101 technical report.  The technical report will be posted under the Company’s profile at www.sedar.com within 45 days from the date of this news release.

WEBCAST DETAILS 

The Company will host a conference call and presentation webcast at 10:30 am Eastern Time / 7:30 am Pacific Time on April 15, 2020 to provide further information.   Participants are advised to dial in five minutes  prior  to  the  scheduled  start  time  of  the  call.    A  presentation  will  be  made  available  on  the Company’s website prior to the webcast.  Webcast details:

Date:  April 15, 2020 at 10:30 am Eastern Time / 7:30 am Pacific Time 

Toll‐free:  Canada/USA  1‐800‐319‐4610  Toronto  1‐416‐915‐3239  International  1‐604‐638‐5340 

Webcast:  http://www.gowebcasting.com/10584

About New Pacific  

New Pacific is a Canadian exploration and development company which owns the Silver Sand Project in Potosí Department, Bolivia and the Tagish Lake gold project in Yukon, Canada.

For further information, contact: 

New Pacific Metals Corp.

Gordon Neal President Phone:  (604) 633‐1368 Fax:   (604) 669‐9387 [email protected] www.newpacificmetals.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the  TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. 

Cautionary Statements Regarding Estimates of Mineral Resources 

This news release uses the terms measured, indicated and inferred resources as a relative measure of the level of  confidence  in  the  resource  estimate.  Readers  are  cautioned  that  mineral  resources  are  not  economic  mineral  reserves and that the economic viability of resources that are not mineral reserves has not been demonstrated. The  estimate of mineral resources may be materially affected by geology, environmental, permitting, legal, title, socio‐ political,  marketing  or  other  relevant  issues.  The  mineral  resource  estimate  is  classified  in  accordance  with  the  Canadian  Institute  of  Mining,  Metallurgy  and  Petroleum's  "CIM  Definition  Standards  on  Mineral  Resources  and  Mineral Reserves" incorporated by reference into NI 43‐101. Under Canadian rules, estimates of inferred mineral  resources may not form the basis of feasibility or pre‐feasibility studies or economic studies except for Preliminary  Assessment  as  defined  under  NI  43‐101.  Readers  are  cautioned  not  to  assume  that  further  work  on  the  stated  resources will lead to mineral reserves that can be mined economically. 

CAUTIONARY NOTE REGARDING FORWARD‐LOOKING INFORMATION 

Certain of the statements and information in this news release constitute “forward‐looking information” within the  meaning of applicable Canadian provincial securities laws. Any statements or information that express or involve  discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future  events or performance (often, but not always, using words or phrases such as “expects”, “is expected”, “anticipates”,  “believes”,  “plans”,  “projects”,  “estimates”,  “assumes”,  “intends”,  “strategies”,  “targets”,  “goals”,  “forecasts”,  “objectives”,  “budgets”,  “schedules”,  “potential”  or  variations  thereof  or  stating  that  certain  actions,  events  or  results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative of any of these  terms  and  similar  expressions)  are  not  statements  of  historical  fact  and  may  be  forward‐looking  statements  or  information.  

Forward‐looking statements or information are subject to a variety of known and unknown risks, uncertainties and  other  factors  that  could  cause  actual  events  or  results  to  differ  from  those  reflected  in  the  forward‐looking  statements  or  information,  including,  without  limitation,  risks  relating  to:  fluctuating  equity  prices,  bond  prices,  commodity prices; calculation of resources, reserves and mineralization, foreign exchange risks, interest rate risk,  foreign investment risk; loss of key personnel; conflicts of interest; dependence on management and others.   

This  list  is  not  exhaustive  of  the  factors  that  may  affect  any  of  the  Company’s  forward‐looking  statements  or  information.  Forward‐looking  statements  or  information  are  statements  about  the  future  and  are  inherently  uncertain, and actual achievements of the Company or other future events or conditions may differ materially from  those reflected in the forward‐looking statements or information due to a variety of risks, uncertainties and other  factors,  including,  without  limitation,  those  referred  to  in  the  Company’s  Annual  Information  Form  for  the  year  ended June 30, 2019 under the heading “Risk Factors”. Although the Company has attempted to identify important  factors that could cause actual results to differ materially, there may be other factors that cause results not to be as  anticipated,  estimated,  described  or  intended.  Accordingly,  readers  should  not place undue  reliance  on  forward‐ looking statements or information.   

The Company’s forward‐looking statements or information are based on the assumptions, beliefs, expectations and  opinions of management as of the date of this news release, and other than as required by applicable securities laws,  the Company does not assume any obligation to update forward‐looking statements or information if circumstances  or  management’s  assumptions,  beliefs,  expectations  or  opinions  should  change,  or  changes  in  any  other  events  affecting such statements or information. For the reasons set forth above, investors should not place undue reliance  on forward‐looking statements or information.

CAUTIONARY NOTE TO US INVESTORS 

This news release has been prepared in accordance with the requirements of NI 43‐101 and the Canadian Institute of  Mining, Metallurgy and Petroleum Definition Standards, which differ from the requirements of U.S. Securities laws.   NI 43‐101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public  disclosure an issuer makes of scientific and technical information concerning mineral projects.