MURCHISON MINERALS AQUIRES ADDITIONAL GROUND   NEAR ITS BRABANT‐MCKENZIE PROPERTY 

June 7, 2018 (Toronto, Ontario): Murchison Minerals Ltd. (“Murchison” or the “Company”) (TSXV: MUR) is pleased to announce that it has acquired more ground near its Brabant‐McKenzie property (the “Property”) by staking and is planning additional ground geophysics at the Property.

The  Company  continues  to  expand  its  regional  review  of  mineralized  showings  on  the  Property  and surrounding area. The Company has recently staked an additional 1,301 hectares of ground adjacent to and southeast of the current Property in order to cover prospective geology and reported mineralized showings hosting anomalous copper and zinc values

New Claims 

The Company staked claims numbered MC00011056 adjacent to the Property which covers previous work outlined in Saskatchewan Mineral Deposit Index (“SMDI”) 0429 assessment report (“SMDI 0429”). As noted in the assessment report the area, “hosts a sulphide zone that was traced for a length of 2,000 ft (609.6 m)  over widths of up to 20 ft (6.1 m). Several trenches along the zone expose rusty weathered quartz‐feldspar‐ actinolite  gneiss  containing  abundant  pyrrhotite  and  graphite  and  a  small  amount  of  chalcopyrite.  The  sulphide mineral content ranges from about 60% to over 90%. Within this zone a showing consisting of a  sulphide lens hosting pyrite, pyrrhotite and minor sphalerite and covering an area of 2 ft by 30 ft (0.6 x 9.1 m)  is noted.  One sample of massive pyrrhotite from the showing gave 0.36% Cu.” 

Other showings noted in SMDI 0429 and located within MC00011056 include:  

“A  2,400  x  500  ft  (731.5  x  152.4  m)  northeast‐trending  fine‐grained  pyrrhotite  zone  containing  low (anomalous) copper and zinc values was identified on the east shore of Brabant Lake A sulphide lens hosting pyrite, pyrrhotite and minor sphalerite and covering an area of 2 ft by 30 ft (0.6 x 9.1 m).  One sample of massive pyrrhotite from the showing gave 0.36% Cu. 

Several  boulders  2  to  4  ft  (0.6  to  1.2  m)  in  diameter  at  the  south  end  of  the  zone,  consisting  of essentially  of  massive  pyrrhotite  with  abundant  graphite  and  scattered  irregular  grains  of  chalcopyrite. 

[Trench  no.  4]  is  approximately  1,400  ft  (426.7  m)  to  the  east  of  the  Brabant  Lake  shore  [  which] exposed a 20 ft. (6.1 m) width of nearly massive sulphides pyrrhotite‐pyrite + minor chalcopyrite and  wurtzite (associated with pyrite and sphalerite) and graphite. Wurtzite and hydrozincate were noted  in association with pyrite but not with pyrrhotite. Several assays gave 0.25% Cu. Mineralized float  from the showing area assayed 0.24% Cu.” 

The  Company  also  staked  claims  numbered  MC00011057  approximately  2.0  kilometres  southeast  of  the Property based on showings noted in SMDI 0436 assessment report. It notes the identification of “showings  that host chalcopyrite associated with pyrrhotite in schistose rocks.  Chalcopyrite makes up a much higher  1 | Page proportion of the sulphides than in other type of sulphide zones.”  The Company does not know of any follow up work that has been conducted on this showing since the initial discovery in 1969.

All mineralized values noted are historical only and have not been verified by Murchison.

Murchison is planning a regional summer prospecting, sampling and mapping program over the showings on the newly staked ground, to further defined their potential as exploration targets as the Company works to demonstrate the VMS potential of the area. The Company will also be conducting additional prospecting, sampling and mapping over the TOM2, T2T, Priority 3 geophysical anomalies in order to further define these anomalies as drill targets.

Priority 3 Geophysics Anomaly Update 

The Company has submitted permits for a ground electromagnetic and magnetometer geophysical survey on the Priority 3 VTEM airborne anomaly. Additionally, it has submitted bid tender requests to a number of geophysical contractors. The Company expects to initiate this survey in early to mid‐July 2018.

Qualifying Statement  

The  foregoing  scientific  and  technical  disclosures  have  been  reviewed  and  approved  by  Kent  Pearson,  P. Geo., and Finley Bakker, P. Geo., who are qualified persons as defined by National Instrument 43‐101. Mr. Bakker  is  an  independent  consultant  to  Murchison  and  the  Brabant‐McKenzie  project.  Mr.  Pearson  is President and Chief Executive Officer of the Company.

About the Brabant‐McKenzie Project 

The Brabant‐McKenzie project is located 175 km Northeast of La Ronge, Saskatchewan and approximately 3 km from the community of Brabant Lake. The area is accessed year‐round via Highway 102 and is serviced by grid power. The project consists of one mining lease which hosts the Brabant‐McKenzie Deposit and an additional 15 mineral claims totaling 7,031 hectares which cover approximately 18 kilometers of strike length over  favourable  geological  horizons,  multiple  known  mineralized  showings  and  identified  geophysical conductors.

The Brabant‐McKenzie Deposit hosts an indicated resource of resource 1.5 million tonnes grading 7.46% Zn, 0.70% Cu, 0.39% Pb, 31.16 g/t Ag, [10.09% Zn Eq] and an inferred resource of 4.5 million tonnes grading 5.99% Zn, 0.62% Cu, 0.39% Pb, 19.39 g/t Ag, [7.99% Zn Eq] as disclosed in the report dated November 25, 2017 and filed on SEDAR on March 13, 2018.

About Murchison Minerals Ltd. 

Murchison is a Canadian based exploration company focused on the exploration and development of the 100% owned Brabant‐McKenzie zinc‐copper‐silver project in North‐Central Saskatchewan. The Company also has the HPM nickel‐copper‐cobalt project in Quebec and gold project in the Pickle Lake area of northwestern Ontario.

Additional information about Murchison and its exploration projects can be found on the Company’s website at www.murchisonminerals.com.

For further information, please contact:

Kent Pearson, President and Chief Executive Officer or

2 | Page

Erik H. Martin, Chief Financial Officer [email protected] (416) 350‐3776

Forward‐Looking Information 

Certain  information  set  forth  in  this  news  release  may  contain  forward‐looking  information  that  involves  substantial  known  and  unknown  risks  and  uncertainties.  This  forward‐looking  information  is  subject  to  numerous risks and uncertainties, certain of which are beyond the control of the Company, including, but not  limited to, the impact of general economic conditions, industry conditions, and dependence upon regulatory  approvals. Readers are cautioned that the assumptions used in the preparation of such information, although  considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance  should not be placed on forward‐looking information. The parties undertake no obligation to update forward‐ looking information except as otherwise may be required by applicable securities law. 

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the  TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. 

3 | Page