Mirasol Reports Coeur's Updated Resource Estimate for the Joaquin Project with 39.7 Million Measured + Indicated, plus 31.7 million Inferred Silver Ounces Accessible by Open Pit

Resource Estimates Technical Reports (NI 43-101)

VANCOUVER, Aug. 7, 2012 /CNW/ - Mirasol Resources Ltd. (TSX-V: MRZ, Frankfurt: M8R) is pleased to announce the second National Instrument 43-101 resource estimate for the Joaquin Silver-Gold Project, Santa Cruz Province, Argentina, as prepared by an independent consultant for Mirasol's joint venture partner, Coeur d'Alene Mines ("Coeur"). The estimate is an in-pit resource for the La Negra and La Morocha deposits, and includes 39.7 million ounces of silver in the measured and indicated categories, and 31.7 million ounces of silver in the inferred category, when both oxide and sulphide mineralization are combined for the two adjacent deposits (Table 1, Figure 1 ).

Table 1. Resources Joaquin Project Totals

Mineral Type and CategoryTonnes (000)Silver g/tSilver oz. (000)Gold g/tGold oz.
Total of Oxides & Sulphides
Measured1,80095.85,6000.106,000
Indicated11,90089.234,1000.1036,600
Meas. + Indic.13,70090.139,7000.1042,600
Inferred8,300118.331,7000.0719,800

Mineral resources that are not mineral reserves have not demonstrated economic viability

The estimate was prepared according to NI 43-101 standards and in accordance with CIM Standards on Mineral Resources and Reserves: Definitions and Guidelines (CIM 2005) by independent consulting firm NCL Ingenieria y Construcción Ltda. ("NCL") of Chile, which was selected and contracted by Coeur, and who also performed the original NI 43-101 resource estimate (press release May 9, 2011).

Also, a significant amount of infill diamond drill hole data was not incorporated into the current estimate due to time constraints, particularly from the La Morocha deposit. Mirasol has received assay results from many of the omitted holes, that include the best hole (DDJ-277) containing a 35.3 metre core length intercept of 704 grams per tonne (g/t) silver and 0.24 g/t gold, which includes 15.3 metres of 2,372 g/t silver and 0.90 g/t gold. The infill holes in the Morocha deposit confirm grade and continuity, and Mirasol expects their eventual inclusion will further increase the confidence classification of the resource, and perhaps also increase the average silver grade. (Table 4 and Appendix 1).

Geological data was used to separate the mineralization into oxide and sulphide types, and discreet mineralized bodies were defined by geology and grade shells to spatially limit the assay data. At Morocha, a single tabular body, dipping moderately north-easterly, was defined. At La Negra, a sub-vertical feeder and subhorizontal manto (planar tabular) bodies were defined.

The in-pit resources have been computer-modeled by Whittle® Pit mine shells designed using the technical parameters determined by Coeur's Technical Services Group and accepted by NCL (Table 2). They include Coeur's current estimates of the operating costs and parameters. Sufficient work has not yet been done to classify the resources as reserves and the parameters used in Table 2 are considered to be preliminary in nature. The resources are not demonstrated to have economic viability at this stage, but are believed to have a reasonable probability of doing so, when required additional engineering studies are completed.

Table 2. Parameters used for Whittle® Pits

ParameterUnitsMay 2011August 2012
La MorochaLa Negra
Open Pit MiningUS$/tonne$2.00$2.79$2.82
Oxide Leaching$14.50$13.93$13.93
Sulphide Processing$28.00$20.75$20.75
Reclamation-$0.04$0.04
Incremental Tailings-$0.75$0.75
Silver - smelting$US/ounce$0.50$0.15$0.15
Gold - smelting$10.00$7.50$7.50
Transport & Refining-$2.50$2.50
Royalty (Argentina)%-33
Silver - price$US/ounce$20$30$30
Gold - price$1,300$1,500$1,500
Pit Slope Angledegrees505050
Oxide Silver Recovery%707070
Oxide Gold Recovery858585
Sulphide Silver Recovery868686
Sulphide Gold Recovery929292
Cut-off Oxide (resource reporting)grams/tonne33 Silver equivalent25 Silver25 Silver
Cut-off Sulphide (resource reporting)grams/tonne51.9 Silver equivalent37 Silver37 Silver

Resources reported herein are only those within the pit shell designed using the parameters in Table 2, and only those within the pit shells that exceed the cut-off grade. Project-specific metallurgical test work is at preliminary stage at Joaquin. Additional test work has been performed since the initial resource estimate, however it was decided not to change the assumptions of the metallurgical recovery parameters. It was determined that lower processing costs are to be expected for the oxide mineralization than the sulphide mineralization (Table 2) and this was incorporated into the pit design. The sulphide mineralization is, however, higher grade on average. For the purposes of reporting the current resource estimate results, a cut-off grade of 25 g/t silver was used for oxide mineralization, and a cut-off of 37 g/t silver was used from sulphide mineralization for mineralization within the pit design. Most of the resource is comprised of oxide mineralization (74% of the silver ounces) with lesser sulphide mineralization (26% of the silver ounces). The majority of the sulphide mineralization is found at La Morocha where it occurs beneath oxide mineralization.

The current resources are tabulated on a project-wide basis (Table 1), as well as separately for the La Morocha (Table 3A) and La Negra (Table 3B) deposits, and are differentiated by category into those resources categorized as Measured and Indicated (with greater confidence levels) and Inferred (lesser confidence level), and by mineralization type into oxide and sulphide types. Individually, on a tonnage basis, the La Negra resource has progressed from 53% Indicated with no Measured in May 2011 to a current combined 89% Measured and Indicated classification (Figure 2). At La Morocha in May 2011 there was no Measured and 4% Indicated and this has now progressed to Measured and Indicated of 27%. On a project-wide basis, 62% of the resource tonnes have now been classified as Measured and Indicated while the remaining 38% are classified as Inferred. This is a large increase over the initial resource estimate (May 2011) in which 34% of the total tonnes were classified as Indicated and the remainder as Inferred.

Table 3A. Resources La Morocha Deposit

Mineral Type and CategoryTonnes (000)Silver g/tSilver oz. (000)Gold g/tGold oz.
Oxides
Measured50081.21,4000.05900
Indicated1,60082.34,3000.052,600
Meas. + Indic.2,10082.05,7000.053,500
Inferred5,40098.016,9000.069,600
Sulphides
Measured100275.79000.14500
Indicated400258.53,0000.151,700
Meas. + Indic.500262.43,9000.152,200
Inferred1,500222.210,9000.136,400
Total of Oxides & Sulphides
Measured600113.32,3000.071,300
Indicated2,000114.47,3000.074,300
Meas. + Indic.2,600114.19,6000.075,700
Inferred6,900125.427,8000.0716,000

Table 3B. Resources La Negra Deposit

Mineral Type and CategoryTonnes (000)Silver g/tSilver oz. (000)Gold g/tGold oz.
Oxides
Measured1,10084.52,9000.124,300
Indicated9,30082.124,5000.1030,400
Meas. + Indic.10,40082.427,4000.1034,700
Inferred1,10077.82,8000.082,900
Sulphides
Measured100106.74000.09300
Indicated600114.72,3000.091,900
Meas. + Indic.700113.62,7000.092,200
Inferred300105.31,1000.091,000
Total of Oxides & Sulphides
Measured1,20086.53,3000.124,600
Indicated9,90084.226,8000.1032,300
Meas. + Indic.11,10084.430,1000.1036,900
Inferred1,40084.03,9000.083,900

Due to time constraints, NCL was unable to include 29 infill holes and 2 metallurgical holes at the Morocha deposit, and 13 infill and expansion holes at the La Negra deposit in the estimate (Figures 3 and 4). Results of infill drilling at La Morocha have been very successful in confirming the current resource, and infill drilling cut some of the longest intercepts and highest silver grades to date (Figure 3, Tables 3 and 4, and Appendices 1 and 2). Mirasol expects that incorporation of these unused holes at La Morocha will significantly increase the percentage of tonnes in the Measured and Indicated categories, which currently represent 27% of the total tonnes, to a much higher percentage, as occurred at La Negra where the percentage increased from 53% as Indicated to 89% as Measured and Indicated, when the infill holes were included (Figure 2).

Table 4. Highlights of Drill Intercepts Not Included in the Current Resource Estimate

Drill HoleInter- ceptFrom (metres)To (metres)Intercept length (metres)Core Recv. (%)Silver (g/t)Gold (g/t)AgEQ (g/t)AgEQ gram- metre product
La Morocha - Infill Holes Not Included in Current Resource
DDJ-2631st114.6147.032.4971840.191966,368
DDJ-2651st67.992.024.11001290.041313,160
DDJ-2672nd76.0116.040.0982980.0830312,138
including88.696.17.5984370.074413,302
including101.0107.36.3971,1660.451,1957,531
DDJ-2691st118.0145.027.0951100.321303,519
DDJ-2701st66.0106.040.0981610.001616,422
DDJ-2712nd145.5175.029.5976540.1666419,583
including150.2153.83.6954,2571.234,33715,396
DDJ-2721st17.037.020.0901510.001513,023
DDJ-2751st85.2107.021.8972090.002094,546
DDJ-2761st95.0119.024.0963840.053879,293
including107.0112.05.01001,5510.001,5517,756
DDJ-2771st129.0164.335.3981,2530.461,28345,294
including131.0139.58.4997040.247206,081
including149.0164.315.3972,3720.902,43037,178
DDJ-279+1st166.0196.030.0991490.091544,631
DDJ-280+1st13.090.077.092530.01544,167
DDJ-282+1st68.0124.056.0981850.0018510,371
including+99.2104.04.81001,1970.001,1975,804
DDJ-283+1st117.0165.048.0953480.6739118,776
including+135.0142.07.0951,3840.001,3849,689
including+152.0157.05.0945155.438684,340
La Negra - Expansion Holes Not Included in Current Resource
DDJ-2282nd84.092.08.0951740.001741,391
DDJ-2331st98.0105.07.094800.0282571
DDJ-2334th128.0139.011.0691390.601781,958
DDJ-2371st47.069.022.089960.02972,136
DDJ-2372nd83.094.011.090630.0063696
DDJ-2381st29.042.013.095790.20921,192

Silver equivalent is calculated as AgEQ g/t = Ag g/t + 65 x Au g/t. Metallurgical recoveries are assumed to be 100%.

Primary intersections are calculated at a cutoff grade of 20 g/t with some internal dilution allowed at the discretion of the project's Qualified Person. "Included" intersections are calculated at a 50 g/t or higher cutoff grade.

Reported grades are not capped.

Estimated true widths have not been calculated and the AgEq gram metre product is thus based on the uncorrected core lengths of the intercepts + indicated holes are considered preliminary pending QA/QC data for certified standards the two indicated holes have 5m gaps in sampling which are assumed to have zero grade herein

Currently Mirasol holds a 49% interest in the Joaquin Joint Venture. Coeur may earn a 61% interest by completing a full feasibility study that meets criteria for bank financing, which is currently underway. On delivery of the feasibility study, Mirasol may retain a 39% participating interest or, at its election, request that Coeur provide mine financing, and in return Coeur may increase its participation to 71% in the project if it elects to proceed to the next stage.

Mirasol looks forward to future upgrades in the confidence classification of the Joaquin Project resources through incorporation of unused drill data, as well as expansion through the exploration for new deposits on this highly prospective property. At the present time, results are pending on 34 drill holes (DDJ-284 to 315), most of which were drilled on new exploration targets. The new resource estimate presented here represents a significant increase in confidence in the geometry, nature and grade of the La Negra and La Morocha silver-gold deposits and thus reduces uncertainty and shareholder risk associated with the resources. It also represents a significant step towards Coeur's goal of completing a feasibility study which meets bank finance criteria.

NCL and Coeur have provided technical information to Mirasol upon which Mirasol is relying. NCL is currently finalizing a NI 43-101 Technical Report describing in detail the methods and work on the Joaquin Project resource on behalf of Mirasol, which will be made available on SEDAR at www.sedar.com within the next 45 days. Methods used by NCL in the current resource estimate are in general similar to those used in the previous estimate (as posted on SEDAR on June 23, 2011).

Paul G. Lhotka, Principal Geologist for Mirasol, and the Qualified Person for Mirasol under NI 43-101, has summarized and approved the technical content of this news release and the drilling results presented here which are not included in the updated resource estimate.

Quality Assurance/Quality Control:

Coeur d'Alene operates the Joaquin Joint Venture and generated the drilling data used in this news release and reported it to Mirasol. Drill core samples were submitted to Alex Stewart (Assayers), Argentina S.A. and ALS Laboratories, both ISO 9000-2000 accredited laboratories located in Mendoza, Argentina. Gold and silver results were determined using standard fire assay techniques on a 30 gram sample with a gravimetric finish for gold and silver. Coeur's QAQC program includes the insertion of blanks, standards and duplicates into the sample stream for Joaquin drill holes. Mirasol has performed an independent analysis of the QAQC data generated by Coeur. Dr. Paul Lhotka has reviewed the Coeur data, calculated the intercepts in this news release, and is a qualified person as defined by National Instrument 43-101.

Assay results from subsurface drill core or RC drill samples may be higher, lower or similar to results obtained from surface samples.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Appendix 1. Complete Results of Drill Intercepts Not Included in the Current Resource Estimate

Drill HoleInter- ceptFrom (metres)To (metres)Intercept length (metres)Core Recv. (%)Silver (g/t)Gold (g/t)AgEQ (g/t)AgEQ gram metre product
La Morocha - Holes
DDJ-253*1st129.0174.045.0942150.1622510,129
including*148.3158.09.7964790.375024,874
DDJ-254*1st124.0151.027.0992110.072155,817
including*136.0140.04.0995330.045362,143
DDJ-254*2nd155.0162.07.0971040.46134937
DDJ-254*3rd176.0181.35.399780.39103542
metallurgical holes DDJ-253 and 254 were previously published, but are not included in the current resource estimate
DDJ-2551st67.068.01.0971560.00156156
DDJ-2552nd83.183.40.31001690.0016942
DDJ-2553rd89.090.01.0100570.005757
DDJ-2554th115.0118.03.0912560.08262785
DDJ-2561st43.057.014.0981040.001041,459
DDJ-2562nd81.088.07.082240.0024167
DDJ-2571st41.068.027.092780.00782,106
DDJ-2581st100.0102.02.0100550.0055110
DDJ-2582nd107.0109.02.0973170.00317635
DDJ-2583rd112.0115.03.0100530.0053159
DDJ-2584th119.0120.01.0931380.00138138
DDJ-2591st123.0131.08.0991570.001571,252
DDJ-2592nd183.0186.03.096160.6759178
DDJ-2601st141.0143.02.098400.004080
DDJ-2602nd175.0177.02.098210.002142
DDJ-2603rd196.5199.02.5100310.8687217
DDJ-2611st14.032.918.9100230.0023425
DDJ-2621st69.0105.036.098760.00762,738
DDJ-2631st114.6147.032.4971840.191966,368
DDJ-2641st143.7145.01.391340.043750
DDJ-2642nd165.0185.020.078990.101052,106
DDJ-2643rd198.0204.06.079660.0469413
DDJ-2644th210.7218.07.397810.0081591
DDJ-2651st67.992.024.11001290.041313,160
DDJ-2652nd109.0112.73.7962450.00245905
DDJ-2661st6.027.021.082590.00591,245
DDJ-2662nd30.037.07.091240.0024170
DDJ-2663rd41.059.518.596480.0048897
DDJ-2671st57.066.09.0100350.0035319
DDJ-2672nd76.0116.040.0982980.0830312,138
including88.696.17.5984370.074413,302
including101.0107.36.3971,1660.451,1957,531
DDJ-2673rd121.2123.01.896950.0095171
DDJ-268#1st18.069.051.097340.00341,716
DDJ-2691st118.0145.027.0951100.321303,519
DDJ-2692nd150.0153.63.695350.2652188
DDJ-2693rd156.6161.04.498690.0773326
DDJ-2701st66.0106.040.0981610.001616,422
including80.281.81.61001,6020.001,6022,483
including90.593.02.5994000.004001,001
DDJ-2702nd118.0123.05.099230.0023115
DDJ-2711st125.6135.59.999570.0057564
DDJ-2712nd145.5175.029.5976540.1666419,583
including150.2153.83.6954,2571.234,33715,396
DDJ-2721st17.037.020.0901510.001513,023
Including33.034.71.7781,3010.001,3012,212
DDJ-2731st108.0126.018.0971170.001172,113
DDJ-2732nd132.2134.01.8100830.75132244
DDJ-2741st53.066.013.097440.0044577
DDJ-2742nd69.097.428.499670.02681,944
DDJ-2751st85.2107.021.8972090.002094,546
DDJ-2761st95.0119.024.0963840.053879,293
including107.0112.05.01001,5510.001,5517,756
DDJ-2771st129.0164.335.3981,2530.461,28345,294
including131.0139.58.4997040.247206,081
including149.0164.315.3972,3720.902,43037,178
DDJ-2781st30.051.021.097540.11611,278
DDJ-279+1st166.0196.030.0991490.091544,631
DDJ-280+1st13.090.077.092530.01544,167
DDJ-281+1st81.088.07.090720.65114801
DDJ-281+2nd95.099.04.098180.9680320
DDJ-281+3rd107.0110.03.092440.0044131
DDJ-282+1st68.0124.056.0981850.0018510,371
including+99.2104.04.81001,1970.001,1975,804
DDJ-282+2nd144.0150.06.087520.78102611
DDJ-283+1st117.0165.048.0953480.6739118,776
including+135.0142.07.0951,3840.001,3849,689
including+152.0157.05.0945155.438684,340
La Negra - Holes
DDJ-2281st77.080.03.098390.0039118
DDJ-2282nd84.092.08.0951740.001741,391
DDJ-2291st50.060.010.097860.0791908
DDJ-2292nd79.099.020.098340.0034680
DDJ-2293rd109.0114.05.0971100.00110552
DDJ-2294th122.0127.05.071770.0077387
DDJ-2301st30.047.017.095370.0037625
DDJ-2311st25.041.016.088640.00641,028
DDJ-2312nd55.066.011.092490.1559649
DDJ-2321st90.092.02.0100420.004284
DDJ-2322nd120.0123.03.096380.0542125
DDJ-2331st98.0105.07.094800.0282571
DDJ-2332nd113.0117.04.098450.1756224
DDJ-2333rd121.0123.02.095300.003059
DDJ-2334th128.0139.011.0691390.601781,958
DDJ-2341st15.035.020.090280.1437737
DDJ-2342nd75.077.02.090300.003059
DDJ-2351st124.0126.02.095330.003365
DDJ-2352nd129.0133.04.064320.0032127
DDJ-2353rd138.0143.05.0951240.00124619
DDJ-2361st112.0128.016.088500.0050801
DDJ-2362nd134.0137.03.086760.0076227
DDJ-2363rd141.0143.02.090560.0056112
DDJ-2371st47.069.022.089960.02972,136
DDJ-2372nd83.094.011.090630.0063696
DDJ-2373rd97.099.02.083320.003264
DDJ-2381st29.042.013.095790.20921,192
DDJ-2382nd48.070.022.095410.0041904
DDJ-2383rd83.088.05.0921260.00126629
DDJ-2384th93.0100.07.091360.0036254
DDJ-2481st21.023.02.0100540.0054108
DDJ-2482nd28.039.011.0981170.001171,287
DDJ-2483rd47.050.03.01003010.00301903
DDJ-2484th54.055.01.0100430.809595
DDJ-2501st24.026.02.0100480.004896
holes DDJ-239 to 247, and 249 are included in the current estimate, hence they are not listed here

Silver equivalent is calculated as AgEQ g/t = Ag g/t + 65 x Au g/t. Metallurgical recoveries are assumed to be 100%.

Primary intersections are calculated at a cutoff grade of 20 g/t with some internal dilution allowed at the discretion of the project's Qualified Person. "Included" intersections are calculated at a 50 g/t or higher cutoff grade.

Reported grades are not capped.

Estimated true widths have not been calculated and the AgEq gram metre product is thus based on the uncorrected core lengths of the intercepts + indicated holes are considered preliminary pending QA/QC data for certified standards # indicated hole is pending a single assay which has been assumed to have zero grade herein the two indicated holes have 5m gaps in sampling which are assumed to have zero grade herein

Appendix 2. Joaquin Project -- Locations of Holes not Included in Current Resource Estimate (includes previously published DDJ- 253 and 254)

Hole IDE GKCIN GKCIElevation mAz degreesDip degreesLength m
DDJ-2282,458,994.64,677,485.0907.9234.00-55.0120.00
DDJ-2292,458,887.04,677,530.0912.5234.00-50.0130.00
DDJ-2302,458,621.54,677,270.1905.2234.00-52.090.00
DDJ-2312,458,582.24,677,305.5903.4234.00-50.092.00
DDJ-2322,458,849.44,677,318.3910.3234.00-50.0130.80
DDJ-2332,458,912.04,677,299.0921.0234.00-50.0140.00
DDJ-2342,458,804.64,677,166.8912.2234.00-45.077.00
DDJ-2352,459,030.24,677,562.0921.6234.00-50.0150.00
DDJ-2362,458,849.64,677,561.6916.3234.00-50.0200.00
DDJ-2372,458,679.44,677,624.5915.1234.00-50.0110.00
DDJ-2382,458,557.74,677,348.3902.7234.00-45.0101.00
DDJ-2392,458,503.14,677,627.9902.8238.00-50.065.00
DDJ-2402,458,467.54,677,601.2898.3235.00-50.160.00
DDJ-2412,458,463.84,677,743.6896.2234.00-47.085.00
DDJ-2422,458,444.74,677,580.5899.1234.00-50.040.00
DDJ-2432,458,441.84,677,612.6898.1235.00-50.041.00
DDJ-2442,458,408.94,677,643.9898.6235.00-50.040.00
DDJ-2452,458,416.64,677,680.6897.6235.00-50.050.00
DDJ-2462,458,437.34,677,724.9896.0232.90-44.860.00
DDJ-2472,458,416.34,677,709.9897.0236.00-47.055.00
DDJ-2482,458,396.74,677,695.6899.3237.00-45.055.00
DDJ-2492,458,453.44,677,708.7896.3234.00-50.065.00
DDJ-2502,458,433.14,677,661.6897.1225.00-85.050.00
DDJ-251*2,458,428.64,677,643.8897.50.00-90.050.00
DDJ-252*2,458,439.84,677,624.1897.9245.00-84.550.00
DDJ-253*2,457,130.24,677,534.0935.70.00-90.0200.00
DDJ-254*2,457,218.64,677,460.9940.90.00-90.0194.00
DDJ-2552,457,270.74,677,355.8944.490.00-88.2150.00
DDJ-2562,457,247.74,677,322.7947.7147.50-88.2120.00
DDJ-2572,457,192.54,677,330.0952.4122.70-88.690.00
DDJ-2582,457,240.44,677,394.5943.40.00-90.0170.00
DDJ-2592,457,264.04,677,428.6941.70.00-90.0200.00
DDJ-2602,457,285.94,677,460.6943.60.00-90.0221.00
DDJ-2612,457,158.14,677,369.1950.9215.00-50.080.00
DDJ-2622,457,106.24,677,467.7943.20.00-90.0140.00
DDJ-2632,457,126.44,677,495.4940.00.00-90.0170.00
DDJ-2642,457,162.84,677,552.2935.2149.00-89.3222.00
DDJ-2652,457,171.24,677,392.6948.689.00-87.0140.00
DDJ-2662,457,020.34,677,439.5947.6318.90-89.790.00
DDJ-2672,457,063.84,677,495.9939.7182.00-89.8140.00
DDJ-2682,456,930.74,677,483.2942.3139.20-88.287.00
DDJ-2692,457,091.74,677,532.5936.476.00-89.0191.00
DDJ-2702,456,962.14,677,524.9936.1120.00-87.6130.00
DDJ-2712,457,121.74,677,550.4934.655.90-89.8230.00
DDJ-2722,457,113.44,677,396.3950.8212.70-49.990.00
DDJ-2732,456,989.34,677,563.1928.0106.00-89.4160.00
DDJ-2742,457,143.74,677,435.1946.7216.40-59.6110.00
DDJ-2752,457,147.84,677,441.2946.5185.40-88.1143.00
DDJ-2762,456,936.14,677,570.9925.254.00-89.1147.00
DDJ-2772,457,175.14,677,478.1941.4351.10-89.4180.00
DDJ-2782,456,868.34,677,568.1924.2202.00-60.280.00
DDJ-2792,457,204.14,677,520.5938.141.50-89.2210.00
DDJ-2802,456,988.24,677,470.0944.1150.70-87.7120.00
DDJ-2812,456,890.04,677,596.7918.4170.30-89.4147.00
DDJ-2822,457,023.74,677,523.2934.892.30-88.9162.00
DDJ-2832,457,050.54,677,564.1929.50.00-90.0201.00
  • previously published

GKCI = Gauss Kruger Campo Inchauspe coordinates

SOURCE: Mirasol Resources Ltd.

%SEDAR: 00021558E

For further information:

Mary L. Little President and CEO

Tel:(604) 602-9989; Fax:(604) 609-9946

Email: [email protected] Website: www.mirasolresources.com

CO: Mirasol Resources Ltd.

CNW 08:30e 07-AUG-12