Monday, October 19, 2026
MiningNewsTerminal
Monday, October 19, 2026 Admin

MNO.TO ·

Meridian Reports Shallow High‐Grade Drill Results and 1km Step Out From Cabaçal

Drill Results Resource Estimates Economic Studies Exploration Programs

8th Floor, 4 More London Riverside | London SE1 2AU| United Kingdom 

Meridian Reports Shallow High‐Grade Drill Results and 1km Step Out From  Cabaçal  

CD‐264 returns 12.6m @ 15.5g/t AuEq from 43.3m in Northwest Extension 

LONDON, United Kingdom, July 11, 2023 / Accesswire / Meridian Mining UK S (TSX: MNO) (OTCQX:  MRRDF) (Frankfurt/Tradegate: 2MM) (“Meridian” or the “Company”) is pleased to provide an update on its programs at Cabaçal, where CD‐264 has returned further strong results from the Cabaçal Northwest Extension ("CNWE"). CD‐264 has intersected a high‐grade zone of 12.6m @ 15.5g/t AuEq (15.3g/t Au, 0.2% Cu & 0.6g/t Ag) from 43.3m, representing a northern extension of similar high‐grade results (CD‐ 049,  CD‐0721).  This  and  additional  results  in  the  mine  area  show  the  potential  to  better  define  the projection of higher grade trends across the deposit. In parallel with the resource development program, the Company is advancing with exploration of near‐mine extensions, with a copper gossan identified at surface,  located  350m  southeast  of  CD‐240's  copper  feeder  zone.  Drilling  has  also  confirmed  the mineralized position of the VMS horizon in a 1km step‐out to the southeast of the Cabaçal mine.

HIGHLIGHTS REPORTED TODAY

  • Cabaçal Northwest Extension returns more high‐grade gold intersections; 
    • CD‐264 returns 12.6m @ 15.5g/t AuEq (15.3g/t Au, 0.2% Cu & 0.6g/t Ag) from 43.3m;
    • New results consolidate domain of high‐grade mineralization extending over 175m;
  • 1km  step‐out  along  the  Cabaçal  trend  intersects  a  base  metal  horizon  correlative  with  the 

Cabaçal system; 

  • CD‐255 drill hole adds context for further exploration for VMS sulphide mounds;
  • Arrival of Geonics down‐hole probe to assist in targeting thicker Cu‐Zn‐Ag‐Au zones;
  • Preparations advance for mobilization of new Santa Helena drill rig o Contractor representative due on site this month to prepare for mobilization of regional drill rig, with program to commence at Santa Helena;

o Program targeting verification of historic drilling and exploratory holes into satellite zones surrounding the historic resource ; and

  • Cabaçal development studies are advancing in preparation for submission of the Environmental  Impact Assessment for the consideration of up to 4.5Mtpa expanded production scenario.

Dr. Adrian McArthur, CEO, comments: “The CD‐264 high‐grade result of 12.6m @ 15.5g/t AuEq from 43.3m shows the value of infill drilling in achieving better definition of shallow high‐grade trends within  the Cabaçal deposit. The result continues to build on the importance of the CNWE as a focal point for early  production  scenarios.  We  are  advancing  Cabaçal  vigorously  on  multiple  fronts,  with  drilling,  with  geotechnical evaluation, and with environmental studies to support expanded production scenarios to be  evaluated in a PEA update. Our goal remains to continue moving Cabaçal on its pathway to development,  whilst laying the foundation to realize the broader discovery potential of this under‐explored belt." 

1 Meridian News Release of November 29, 2021, September 7, 2021, May 3, 2022.

CABAÇAL RESOURCE AND EXTENSIONS

The drilling program at Cabaçal continues to follow recommendations arising from the PEA. The resource definition  program  aims  to  achieve  better  definition  of  the  higher  grade  trends  within  the  broader mineralized halo. The projection of the high‐grade trend at shallowing depths in CD‐264 returning 12.6m @ 15.5g/t AuEq from 43.3m is encouraging (Figure 1; Figure 2). Further drilling is being scheduled to test for the projection of the trend within the broader footprint of Cu‐Au mineralization, both to the northwest and southeast where the drill spacing is currently more open.

Figure 1: Location of CD‐264’s intersection, extending the projection of the high‐grade CNWE trend. Colour  points represent drill assays plotted as AuEq (g/t) in plan view. Digital elevation image in the background. 

Figure 2: Quartz veining in chloritic host rock associated with CD‐264's intersection hosting visible gold. 

Additional drilling has been conducted in the Eastern Copper Zone ("ECZ"), where it was noted that the high‐grade trends in the block model clustered around drill holes in areas of wider spacing, dropping off in‐between. The new drill results show that basal concentrations of high‐grade mineralization continue in these intervening areas (CD‐256 & CD‐263; Table 1). The cumulative effect of such results is expected to present  a  more  accurate  depiction  of  the  higher  grade  population  across  the  deposit  as  the  drilling advances for the next resource update. The Company is currently conducting a Mise‐a‐la‐Masse survey to follow up on the geophysical response of stringer sulphide mineralization in the ECZ, with the survey currently targeting extensions to the CD‐254 result of 17.7m @ 1.6% CuEq / 2.4g/t AuEq from 50.0m2.

Exploratory evaluation of the extensions of the Cabaçal system continues. CD‐255 was a 1km step‐out along the Cabaçal trend (Figure 3). It intersected a base metal horizon interpreted to be correlative with the Cabaçal  system (5.3% Zn, 0.1% Cu, 0.2g/t Au & 32.4g/t Ag over 0.3m from 119.9m). The drill hole adds useful context for further planning of exploration for VMS sulphide mounds over time. The Company awaits the arrival of a down‐hole probe from Geonics to assist in targeting thicker Cu‐Zn‐Ag‐Au sulphide accumulations, which are less conductive than the copper dominant end member.

Recent prospecting by the geological team has also located some copper gossan at the south‐west flank of the resource area (Figure 4). Drilling in this area is sparse, with wide‐spaced historical BP holes not sampled systematically from surface. The gossan is located ~350m southeast of CD‐240's copper feeder zone,  possibly  in  an  up‐dip  position  to  the  Cabaçal  South  FLTEM  conductivity  anomaly3,  where  the Company has drilled just one hole. Following recognition of the gossan, trenching will be undertaken to guide further drilling and evaluate possible links to the feeder system.

2 Meridian News release June 14, 2023 3 Meridian News release April 12, 2021 Figure 3: Drilling overview, with location of CD‐255, pinpointing the open extension of the Cabaçal VMS  horizon in a 1km step out from the resource area. 

SANTA HELENA

Preparations continue at Santa Helena in advance of the arrival of the fourth drill rig. The objective of the drilling program will be to conduct both validation drilling on historical resource holes, and a first phase of exploratory drilling on satellite drill targets marked by geophysical responses for potential discoveries satellite to the main resource.

PROJECT DEVELOPMENT 

Project development studies are advancing in preparation for submission of the Environmental Impact Assessment (EIA‐RIMA), positioning the project for the consideration of an expanded production scenario of up to 4.5Mtpa. Project development studies underway also include a 12‐hole geotechnical drilling program. The PEA utilized default assumptions for pit will angles. Based on the PEA pit shell, a series of holes are being drilled to now gather specific data for the next phase of evaluation. If data supports a steepening of pit wall angles in a competent rock mass, results will have a positive impact on the stripping ratio.

Figure 4: Copper Gossan with portable XRF reading from surface float at the southwestern flank of the  resource area.

Table 1: Drilling results

Hole‐IDDipAziEOHZoneIntAuEqCuEqCuAuAgZnFrom
(m)(m)(g/t)(%)(%)(g/t)(g/t)(%)(m)
CD‐264‐4906098.3CNWE
12.6 15.5 10.4 0.2 15.3 0.6 0.0 43.3 14.7 0.6 0.4 0.2 0.3 0.6 0.0 65.5
CD‐263‐70048104.1ECZ
4.0 0.3 0.2 0.2 0.0 1.3 0.0 66.9 15.0 1.0 0.7 0.6 0.2 2.9 0.1 74.7 Including 4.0 2.5 1.7 1.4 0.5 7.1 0.1 85.4
CD‐262‐4904549.3ECZ
2.6 0.5 0.3 0.3 0.1 1.1 0.0 17.0 1.3 3.3 2.2 1.8 0.6 11.3 0.1 22.8
CD‐261‐4905995.3CNWE
6.2 0.7 0.5 0.3 0.3 0.3 0.0 20.0 13.0 0.8 0.5 0.3 0.4 1.0 0.0 40.1 7.0 0.7 0.5 0.3 0.3 0.9 0.0 59.4 7.4 0.5 0.3 0.2 0.1 1.1 0.0 72.0
CD‐260‐49059113.2CNWE
1.0 1.0 0.6 0.1 0.9 0.1 0.0 13.3 1.0 0.8 0.5 0.0 0.8 0.4 0.0 18.0 20.1 0.6 0.4 0.3 0.2 1.1 0.0 34.8 6.3 0.2 0.1 0.1 0.1 1.1 0.0 61.1 10.3 0.1 0.1 0.0 0.1 2.8 1.0 85.6
CD‐259‐6704536.0Cabaçal‐
Sth
Abandoned
CD‐258‐4404549.4ECZ /
Gabbro
NSI
CD‐257‐51058127.2CNWE
23.8 0.5 0.3 0.3 0.1 0.7 0.0 11.3 3.2 0.8 0.5 0.5 0.2 0.7 0.0 85.0 6.8 1.7 1.1 0.7 0.8 2.6 0.0 98.1
CD‐256‐90000108.2ECZ
4.5 0.4 0.3 0.3 0.0 0.3 0.0 16.0 28.6 0.7 0.5 0.4 0.1 2.0 0.0 66.7 Including 4.9 2.3 1.5 1.2 0.5 6.2 0.2 88.5
CD‐255‐49046184.1C4A‐Sth
4.0 0.3 0.2 0.1 0.1 5.1 0.6 117.3 Including 0.3 0.1 0.2 32.4 5.3 119.9

ABOUT MERIDIAN

Meridian Mining UK S is focused on:

  • The development and exploration of the advanced stage Cabaçal VMS gold‐copper project;
  • Regional scale exploration of the Cabaçal VMS belt;
  • Exploration in the Jaurú & Araputanga Greenstone belts (the above all located in the State of Mato Grosso, Brazil); and
  • Exploring the Espigão polymetallic project in the State of Rondônia, Brazil.

Cabaçal is a gold‐copper‐silver rich VMS deposit with the potential to be a standalone mine within the 50km VMS belt. Cabaçal’s base and precious metal‐rich mineralization is hosted by volcanogenic type, massive, semi‐massive, stringer, and disseminated sulphides within deformed metavolcanic‐sedimentary rocks. A later‐stage sub‐vertical gold overprint event has emplaced high‐grade gold mineralization cross‐ cutting the dipping VMS layers.

The Cabaçal Mineral Resource estimate consists of Indicated resources of 52.9 million tonnes at 0.6g/t gold, 0.3% copper and 1.4g/t silver and Inferred resources of 10.3 million tonnes at 0.7g/t gold, 0.2% copper & 1.1g/t silver (at a 0.3 g/t gold equivalent cut‐off grade), including a higher‐grade near‐surface zone supporting a starter pit.

The Preliminary Economic Assessment technical report (the “PEA Technical Report”) dated March 30, 2023,  entitled:  "Cabaçal  Gold‐Copper  Project  NI  43‐101  Technical  Report  and  Preliminary  Economic Assessment, Mato Grosso, Brazil”  outlines a base case after‐tax NPV5 of USD 573 million and 58.4% IRR from a pre‐production  capital cost of  USD 180 million, leading  to capital repayment in 10.6 months (assuming metals price scenario of USD 1,650 per ounces of gold, USD 3.59 per pound of copper, and USD 21.35 per ounce of silver). Cabaçal has a low All‐in‐Sustaining‐Cost of USD 671 per ounce gold equivalent for the first five years, driven by high metallurgical recovery, a low life‐of‐mine strip ratio of 2.1:1, and the low operating cost environment of Brazil (see press release dated March 6, 2023).

Readers are encouraged to read the PEA Technical Report in its entirety.   The PEA Technical Report may be  found  on  the  Company's  website  at  www.meridianminig.co  and  under  the  Company's  profile  on SEDAR at www.sedar.com.

The qualified persons for the PEA Technical Report are: Robert Raponi (P. Eng), Principal Metallurgist with Ausenco Engineering), Scott Elfen (P. E.), Global Lead Geotechnical  and  Civil  Services  with  Ausenco Engineering),  Simon  Tear  (PGeo,  EurGeol),  Principal Geological Consultant of H&SC, Marcelo Batelochi, (MAusIMM,  CP  Geo),  Geological  Consultant  of  MB  Geologia  Ltda,  Joseph  Keane  (Mineral  Processing Engineer;  P.E),  of  SGS,  and  Guilherme  Gomides  Ferreira  (Mine  Engineer  MAIG)  of  GE21  Consultoria Mineral.

On behalf of the Board of Directors of Meridian Mining UK S

Dr. Adrian McArthur CEO and Director Meridian Mining UK S

Email: [email protected] Ph: +1 (778) 715‐6410 (PST)

Technical Notes  Samples have been analysed at the accredited ALS laboratory in Lima, Peru, and SGS laboratory in Belo  Horizonte.  Samples  at  ALS  are  dried,  crushed  with  70%  passing  <2mm,  split  off  to  give  a  mass  of  approximately 250g, and pulverized to >85% passing 200#. Routine gold analyses have been conducted by  Au‐AA23 (fire assay of a 30g charge with AAS finish). High‐grade samples (>10g/t Au) are repeated with a  gravimetric finish (Au‐GRA21). Samples with visible gold identified during logging are analysed by screen  fire assay method Au‐SCR21. Samples at SGS are dried, crushed with 75% passing <3 mm, split to give a  mass of 250‐300g, pulverized with 95% passing 150#. Gold analyses are conducted by FAA505 (fire assay  of a 50g charge), and base metal analysis by methods ICP40B and ICP40B_S (four acid digest with ICP‐OES  finish). Visible gold intervals are sampled by metallic screen fire assay method MET150‐FAASCR. Samples  are held in the Company’s secure facilities until dispatched and delivered by staff and commercial couriers  to the laboratory. Pulps are retained for umpire testwork, and ultimately returned to the Company for  storage.  The  Company  submits  a  range  of  quality  control  samples,  including  blanks  and  gold  and  polymetallic standards supplied by Rocklabs, ITAK and OREAS, supplementing laboratory quality control  procedures. In BPM sampling, gold was analysed historically by fire assay and base metals by three acid  digest and ICP finish at the Nomos laboratory in Rio de Janeiro. Silver was analysed by aqua regia digest  with an atomic absorption finish. True width is considered to be 80‐90% of intersection width. Assay figures  and intervals are rounded to 1 decimal place. Gold equivalents are calculated as: AuEq(g/t) = (Au(g/t) *  %Recovery) + (1.492*(Cu% * %Recovery)) + (0.013*(Ag(g/t) * %Recovery)), where: 

  • Au_recovery_ppm = 5.4368ln(Au_Grade_ppm)+88.856 
  • Cu_recovery_pct = 2.0006ln(Cu_Grade_pct)+94.686 
  • Ag_recovery_ppm = 13.342ln(Ag_Grade_ppm)+71.037 

Recoveries based on 2022 metallurgical testwork on core submitted to SGS Lakefield 

The Mise‐a‐la‐Masse survey is being conducted using the Company's in‐house team, utilizing its GDD GRx8‐ 16c receiver  and  5000W‐2400‐15A  transmitter.  Data  is processed  by  the  Company’s  independent  consultancy Core Geophysics. Geophysical and geochemical exploration targets are preliminary in nature  and not conclusive evidence of the likelihood of a mineral deposit. 

Qualified Person Dr. Adrian McArthur, B.Sc. Hons, Ph.D. FAusIMM., CEO and Director of Meridian as well as a Qualified Person as defined by National Instrument 43‐101, has reviewed and verified the technical information in this news release.

Stay up to date by subscribing for news alerts here: https://meridianmining.co/contact/ Follow Meridian on Twitter: https://twitter.com/MeridianMining Further information can be found at: www.meridianmining.co

FORWARD‐LOOKING STATEMENTS Some statements in this news release contain forward‐looking information or forward‐looking statements for the purposes of applicable securities laws. These statements address future events and conditions and so involve inherent risks and uncertainties, as disclosed under the heading "Risk Factors" in under the heading  "Risk  Factors"  in  Meridian's  most  recent  Annual  Information  Form  filed  on  www.sedar.com. While these factors and assumptions are considered reasonable by Meridian, in light of management’s experience  and  perception  of  current  conditions  and  expected  developments,  Meridian  can  give  no assurance that such expectations will prove to be correct. Any forward‐looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, Meridian disclaims any intent or obligation to update any forward‐looking statement, whether as a result of new information, future events, or results or otherwise.