Wardrop  Delivers  Positive  Preliminary  Assessment  for  Songjiagou  Gold  Project

Vancouver,   British   Columbia,   January   20,   2011.   Majestic   Gold   Corp.   (TSX.V:MJS, Frankfurt:P5E)  is  pleased  to  announce  that  Wardrop,  A  Tetra  Tech  Company,    (“Wardrop”) has   completed   and   delivered   a   positive   Preliminary   Assessment   (“PA”   or   “Preliminary Assessment”)  for  the  Songjiagou  Gold  Project  located  in  Shandong  Province,  People’s  Republic of  China.

Highlights  are  as  follows:

Net  Present  Value  of  US    $525  million  using  a  10%  discount  rate   •

  • Internal  Rate  of  Return  of  78.6%  
  • Payback  in  1.4  years  

Total  gold  production  of    2.324  million  ounces  (average  105,645  oz/yr)  for  life-­ •

of-­mine  

  • Life-­of-­Mine  strip  ratio  1.87  :  1  (waste  to  ore)  

Mine-­Life  of  22  years.    

•

“The  Preliminary  Assessment  provided  by  Wardrop  has  exceeded  our  expectations  and  will form  the  basis  for  our  continued  development  of  the  Songjiagou  project”  stated  Rod  Husband, President  and  CEO  of  Majestic  Gold  Corp.

A  summary  of  the  main  sections  of  the  Preliminary  Assessment  are  as  follows:

Resource    

In  2006,  Wardrop  prepared  a  National  Instrument  43-­‐101  (NI  43-­‐101)  compliant,  resource estimate   of   the   Songjiagou   deposit.   On   the   basis   of   additional   data   collected   during   2006, Wardrop  prepared  an  updated  estimate  in  late  2007.

In   April   2010   Wardrop   completed   an   update   of   the   2007   resource   estimate   to   take   into account  assay  results  from  surface  core  drilling  and  trenching  that  were  carried  out  during 2007,  as  well  as  depletion  from  surface  mining  since  the  time  of  the  last  estimate.  Depletion attributable  to  underground  mining  during  the  same  interval  was  negligible.

The  April  2010  updated  resource  estimate  was  made  using  an  un-­‐rotated  block  model,  which is  to  say  the  blocks  in  the  model  were  oriented  orthogonally  east-­‐west  and  north  south.  In October  2010,  Majestic  requested  that  the  estimate  be  redone  using  a  block  model  rotated parallel  to  the  trend  of  the  deposit  as  well  as  a  lower  cutoff  (0.3  g/t  versus  0.4  g/t  gold).

The   lower   threshold   grade   (0.3   versus   0.4   g/t)   is   attributable   to   a   lower   cost   for   contract mining  and  milling  that  Majestic  negotiated  during  the  period  between  the  two  estimates.

The  rotated  orientation  is  consistent  with  previous  estimates  and  also  aligns  the  block  model with  cross-­‐sections  that  are  cut  perpendicular  to  the  strike  of  the  deposit.  The  change  in  block model  orientation  as  well  as  the  decrease  in  cutoff  grade  resulted  in  an  overall  enhancement of  both  estimated  tonnes  and  grade.  This  report  incorporates  those  changes.  There  has  been no  change  in  the  underlying  data  between  the  April  2010  estimate  and  the  current  estimate.

The  resource  used  in  preparation  of  the  Preliminary  Assessment  is  tabulated  as  follows:

*Resource CategoryCut-­off (g/t)TonnesAu Uncap g/t**Au Cap g/tOunces Au UncapOunces Au Cap
Indicated0.3033,739,5861.3841.1471,501,2981,244,211
Inferred0.3038,812,0541.5001.4671,871,7551,830,576
  • The  preliminary  assessment  includes  inferred  mineral  resources  that  are  considered  too  speculative

geologically   to   have   the   economic   considerations   applied   to   them   that   would   enable   them   to   be categorized   as   mineral   reserves,   and   there   is   no   certainty   that   the   preliminary   assessment   will   be realized.  All  figures  have  been  rounded  to  reflect  the  relative  accuracy  of  the  estimates **  gold  grades  were  capped  at  40.0  g/t

Open   pit   optimization   was   carried   out   using   Whittle™   4.3   which   uses   a   series   of   Lerchs Grossman   (LG)   pit   shells   at   different   prices   of   gold   to   optimize   the   size   of   the   pit   while maximizing   net   present   value   (NVP)   of   the   deposit.   The   resulting   LG   shells   generated   the highest  discounted  cash  flow  from  the  ore  body  at  varying  prices  of  gold.    The  LG  shell  used for  optimization  does  not  apply  practical  mining  considerations  and  constraints.

The  strategic  planning  using  the  generated  LG  pit  resulted  in  the  following  potential  mineable resources,  which  forms  the  basis  of  the  preliminary  Assessment:

*Potentially Mineable Resources ClassificationTonnesGrade, Au(g/t)
Indicated29,875,5271.207
Inferred22,806,4731.936

*Potentially  Mineable  Resources  include  the  inferred  mineral  resources  end  are  not  mineral  reserves.

Preliminary  Production  Schedule  

The  life-­‐of-­‐mine  strip  ratio  is  1.87  to  1  (waste  to  ore).    Total  ounces  contained  in  the  resource are  3,074,787;  of  this  2,324,000  ounces  are  potentially  recoverable  as  bullion  during  the  mine operations  at  an  average  annual  production  of  approximately  106,000  ounces  per  year.

The  following  table  summarizes  the  information  from  the  Preliminary  Economic  Assessment Production  Schedule.

Preliminary  Production  Summary     Unit   Years  1-­8   LOM   Process  Feed  

Gold   g/t   2.12   1.52

Material  Mined  

Mill Feedkt18,49452,682
Wastekt47,746100,377
Ore Minedkt18,49452,682
Strip Ratio2.331.87

Total  Production  

Gold     koz   1,152   2,324

Average  Production  

Gold     koz   144   106

The  following  table  details  the  planned  Production  Schedule  for  the  Life-­‐of-­‐Mine:

Preliminary  Production  Schedule *Tonnes  

MinedTonnesTonnesTonnesMill feed
IncludingTotalMoved toStockpileWasteROM OreStripGoldGold
StockpileMinedStockpileto MillMinedMilledRatioGradeRec.
Ktktktktktkt#g/tkoz
Year 11,4004,472-­‐3,0721,4002.190.74231
Year 22,4427,644237-­‐4,9652,4421.853.431256
Year 32,4427,173332-­‐4,3992,4421.592.881215

Year  4   344

2,44210,500-­‐7,7142,4422.771.868139
Year 52,4429,574284-­‐6,8482,4422.512.201164
Year 62,44210,354304-­‐7,6082,4422.771.696126
Year 72,4429,343262-­‐6,6392,4422.461.760131
Year 82,4429,150207-­‐6,5012,4422.451.803134

Year  9   212

2,4429,302-­‐6,6482,4422.501.635122
Year 102,4427,640222-­‐4,9762,4421.871.31697
Year 112,4427,115211-­‐4,4622,4421.681.27094
Year 122,4426,671202-­‐4,0272,4421.521.450107
Year 132,4426,274182-­‐3,6502,4421.391.554116

Year  14   185

2,4426,006-­‐3,3792,4421.291.539115
Year 152,4426,493264-­‐3,7872,4421.401.422105
Year 162,4426,772319-­‐4,0112,4421.451.16286
Year 172,4425,918251-­‐3,2252,4421.201.25693
Year 182,4425,871316-­‐3,1132,4421.131.22690

Year  19   455

2,4058,354375,4942,4421.921.27094
Year 207543,289821,6882,4532,4422.930.48634
Year 211,6625,4175857803,1702,4421.410.72052
Year 2236360452,0792362,4420.640.47833

TOTAL/       AVG   53,559   153,936   5,461   4,584   100,377   52,682   1.87   1.523   2,434   *Tonnes   Mined   Including   Stockpile   is   Potentially   Mineable   Resources   category.     The   preliminary assessment  includes  inferred  mineral  resources  that  are  considered  too  speculative  geologically  to  have the   economic   considerations   applied   to   them   that   would   enable   them   to   be   categorized   as   mineral reserves,  and  there  is  no  certainty  that  the  preliminary  assessment  will  be  realized.

Capital  Costs  

Total   capital   costs   are   estimated   at   $129.2   million   including   initial   capital,   initial   working capital  and  sustaining  capital.    The  majority  of  sustaining  capital  is  required  in  years  4  and  5 and  consists  mainly  of  capital  required  to  expand  tailings  storage  facilities.    A  more  detailed breakdown  of  the  capital  costs  is  provided  in  the  following  table.

Capital  Costs   000’s  US$

Pre-­‐production  (pre-­‐strip)   0 Initial  Capital   64,377 Initial  Working  Capital   7,120 Sustaining  Capital   64,787

Total  Capital  Costs   129,163  

Operation  Costs  

Life-­‐of-­‐mine  (“LOM”)  operating  costs  are  estimated  at  US$11.67  per  tonne  milled,  including mining,  process  and  transportation  costs  based  on  the  current  contract  terms.  The  details  of these  costs  are  tabulated  as  follows:

Operating  Costs   US$/tonne   milled  

Mining,  Process  and  Transport   10.72 G&A  and  Quality  Control   0.95

TOTAL  OPERATING  COSTS   11.67  

Operating  Cash  Flows  

Operating  cash  flows  based  on  pit  optimization  parameters  employed  by  Wardrop  indicate that   in   years   1-­‐8   the   mine   will   approximately   produce   a   total   of   1,152,000   ounces   of   gold (144,000   ounces   annually)   and   generate   US$841   million   (US$105   million   annually)   in operating  cash  flow  compared  with  life-­‐of  mine  production  of  2.32  million  ounces  of  gold  in concentrate  (106,000  ounces  annually)  and  operating  cash  flow  of  US$1.516  billion  (US$68.9 million  annually).

The  projected  cash  flows  are  tabulated  below:

Operating  Cash  Flow    000’s  US$   Years  1-­8

Total   841,334 Average   105,167

LOM  

Total   1,515,927 Average   68,906

Economic  Returns  

Wardrop  evaluated  the  economic  viability  of  the  Songjiagou  project  using  pre-­‐tax  discounted cash   flow   analysis   based   on   the   engineering   work   and   cost   estimates   discussed   in   the Preliminary   Assessment.     Over   the   life   of   the   mine,   Songjiagou   is   estimated   to   produce   on average  106,000  ounces  gold  in  concentrate  per  year.    Total  gold  produced  for  LOM  will  be 2.324  million  ounces;  with  a  gold  price  of  $973  per  ounce  and  total  operating  cash  flow  of US$1,516  million,  the  total  cash  cost  is  US$745  million  or  US$321  per  ounce  of  gold.    The  pre-­‐ tax  Net  Present  Value  is  US$525  million  and  the  IRR  is  78.6%.

The  following  table  illustrates  the  project  NPV’s  using  various  discount  rates  besides  the  10% base  case.

Economic Returns Project NPV Unit Pre-­Tax 14.0% discount rate million US$ 381 12.0% discount rate million US$ 446
10.0% discount ratemillion US$525
8.0% discount rate million US$ 624 Project IRR 78.6% Payback Years 1.4 Mine Life Years 22

Sensitivity  Analysis  

Sensitivity  analysis  was  conducted  for  gold  price,  exchange  rate,  gold  feed  grade,  operating costs  and  initial  capital  costs  over  a  +/-­‐  30%  range.    The  results  are  shown  in  following  table and  graph.

Sensitivity  Analysis  (in  US$  millions)  

NPV  @  10%  discount  rate  

Variable-­30% -­20%-­10%0%10%20%30%
Gold Price276359442525608691774
Exchange Rate553544534525516507497
Gold Feed Grade277360442525608691774
Operating Cost586566545525505485464
Initial Capital Cost542536531525520514508

As  the  table  shows  and  the  following  graph  illustrates,  the  main  factors  impacting  the  NPV  are gold  price  and  gold  feed  grade,  while  exchange  rate,  operating  costs  and  initial  capital  costs have  a  much  smaller  effect  on  NPVs.

Pre-­tax  NPV  @  10%  Sensitivity  Analysis  

Gold  Price

Exchange  Rate

Gold    Feed  Grade

Operating  Cost

Initial  Capital  Cost

-­‐30%   -­‐20%   -­‐10%   0%   10%   20%   30%

Based   on   the   estimates   in   the   Preliminary   Economic   Assessment,   Majestic   plans   to   move ahead  with  continued  development  of  the  project,  including  more  detailed  engineering  studies and  applications  for  mining  permits.

The Preliminary Economic Assessment was prepared by Wardrop consultants, all of whom are independent of Majestic and are Qualified Persons as defined by section 1.4 of National Instrument 43-101. The QP’s have reviewed and approved the information in this news release. The consultants (QPs) with their responsibilities are as follows:

Wardrop, under the direction of Greg Mosher, P.Geo., for all matters relating to geology and mineral resource estimate.

Wardrop,  under  the  direction  of  Nory  Narciso,  P.Eng.,  for  all  matters  relating  to  mine  planning, mine  design  and  report  coordination.

Wardrop,  under  the  direction  of  John  Huang,  P.Eng.,  for  all  matters  relating  to  mineral processing,  metallurgical  testing,  infrastructure,  tailings  management  facility,  environmental impact  considerations,  license  and  permit,  operating  and  capital  cost  estimates  and  smelting terms.

Wardrop,  under  the  direction  of  Miloje  Vicentijevic,  P.Eng.,  M.Eng.  for  all  matters  relating  to economic  analysis.

Mike Hibbitts, P.Geo VP Development and Exploration, and a Director of Majestic, has read and approved the information in this news release.

On  Behalf  of  the  Board  of  Directors   MAJESTIC  GOLD  CORP.  

Signed  "Rod  Husband"

Rod  Husband,  P.Geo President

Contact:

Investor  Relations:  (604)  681-­‐4653  or  1-­‐866-­‐282-­‐8398 Email:   [email protected]  or  visit  our  Website:  www.majesticgold.net

Neither  TSX  Venture  Exchange  nor  its  Regulation  Services  Provider  (as  that  term  is  defined  in  the  policies   of  the  TSX  Venture  Exchange)  accepts  responsibility  for  the  adequacy  or  accuracy  of  this  release.  

This   news   release   may   contain   forward-­looking   statements   including   but   not   limited   to   comments   regarding   the   timing   and   content   of   upcoming   work   programs,   geological   interpretations,   receipt   of   property   titles,   potential   mineral   recovery   processes,   etc.   Forward-­looking   statements   address   future   events   and   conditions   and   therefore,   involve   inherent   risks   and   uncertainties.   Actual   results   may   differ   materially  from  those  currently  anticipated  in  such  statements.