Saturday, October 17, 2026
MiningNewsTerminal
Saturday, October 17, 2026 Admin

LUN.TO ·

Lundin Mining Files Ni 43‐101 Technical Report for the Eagle Mine on SEDAR

Resource Estimates Technical Reports (NI 43-101)

Corporate Office UK Office 

150 King Street West, Suite 1500  Hayworthe House, P.O. Box 38  Market Place, Haywards Heath Toronto, ON M5H 1J9  West Sussex, RH16 1DB Phone: +1 416 342 5560  United Kingdom Fax:     +1 416 348 0303  Phone: +44 (0) 1444 411 900

NEWS RELEASE LUNDIN MINING FILES NI 43‐101 TECHNICAL REPORT FOR THE EAGLE  MINE ON SEDAR 

Toronto,  July  26,  2013  ‐  Lundin  Mining  Corporation  (TSX:  LUN)  (OMX:  LUMI)  (“Lundin  Mining”  or  the “Company”)  reports  that  an  independent  National  Instrument  43‐101  Technical  Report  (the  "Report")  for  its Eagle  nickel/copper  mine  has  been  filed  today  on  SEDAR  (www.sedar.com).  The  Report  is  titled  “NI  43‐101 Technical Report on the Eagle Mine, Upper Peninsula of Michigan, USA” and was prepared by Mark Owen and Lewis Meyer from Wardell Armstrong International ("WAI"), based in London, United Kingdom.

Report Highlights: 

  • Probable  Ore  Reserves  (JORC)  of  5.18Mt  at  2.93%  Ni  and  2.49%  Cu,  with  gold,  cobalt,  platinum  and palladium by‐products;
  • Initial production is scheduled for late 2014, with full commercial production by mid‐2015;
  • Approximately US$400M initial capital expenditures remaining to be spent as of July 31, 2013;
  • Average production in first three full years of 23ktpa nickel and 20ktpa copper at estimated C1 cash costs of under US$2.00 per pound of nickel;
  • Average  Life  of  Mine  production  of  17ktpa  nickel  and  17ktpa  copper  at  estimated  C1  cash  costs  of approximately US$2.50 per pound of nickel; and
  • Estimated 8 year mine life (late 2014 – 2022) with upside potential.

For further information on the Probable Ore Reserves and production estimates, please see the Report under Lundin Mining’s profile on SEDAR (www.sedar.com).

Qualified Person: 

The  Qualified  Persons  for the  technical  information  contained  herein  are  Mark  Owen,  Technical  Director  and Lewis Meyer, Associate Director, Wardell Armstrong International.  Mark Owen and Lewis Meyer have reviewed and approved the contents of this news release.

The reserve estimate reported in this release has been prepared using accepted industry practice and classified in accordance with the JORC Code (2004). There are no material differences between the definitions of Proven and Probable  Mineral  Reserves  under  the  applicable  definitions  adopted  by  the  Canadian  Institute  of  Mining, Metallurgy and Petroleum (the "CIM Definition Standards") and the corresponding equivalent definitions in the JORC Code for Proved and Probable Ore Reserves.

About Lundin Mining 

Lundin Mining is a diversified base metals mining company with operations and projects in Portugal, Sweden, Spain and the U.S.A producing copper, zinc, lead and nickel. In addition, Lundin Mining holds a 24% equity stake in the world‐class Tenke Fungurume copper/cobalt mine in the Democratic Republic of Congo and in the Freeport Cobalt Oy business, which includes a cobalt refinery located in Kokkola, Finland.

On Behalf of the Board, 

Paul Conibear  President and CEO 

For further information, please contact:

Sophia Shane, Investor Relations North America:  +1‐604‐689‐7842 John Miniotis, Senior Business Analyst:  +1‐416‐342‐5565 Robert Eriksson, Investor Relations Sweden:  +46 8 545 015 50

Forward Looking Statements 

Certain  of  the  statements  made  and  information  contained  herein  is  “forward‐looking  information”  within  the  meaning  of  the Ontario Securities Act. Forward‐looking statements are subject to a variety of risks and uncertainties which could cause actual events or  results  to  differ  from  those  reflected  in  the  forward‐looking  statements,  including,  without  limitation,  risks  and  uncertainties relating to the estimated cash costs, the timing and amount of production from the Eagle Mine, the cost estimates for the Eagle Mine,  foreign  currency  fluctuations;  risks  inherent  in  mining  including  environmental  hazards,  industrial  accidents,  unusual  or unexpected geological formations, ground control problems and flooding; risks associated with the estimation of mineral resources and  reserves  and  the  geology,  grade  and  continuity  of  mineral  deposits;  the  possibility  that  future  exploration,  development  or mining  results  will  not  be  consistent  with  the  Company’s  expectations;  the  potential  for  and  effects  of  labour  disputes  or  other unanticipated  difficulties  with  or  shortages  of  labour  or  interruptions  in  production;  actual  ore  mined  varying  from  estimates  of grade, tonnage, dilution and metallurgical and other characteristics; the inherent uncertainty of production and cost estimates and the  potential  for  unexpected  costs  and  expenses,  commodity  price  fluctuations;  uncertain  political  and  economic  environments; changes in laws or policies, foreign taxation, delays or the inability to obtain necessary governmental permits; and other risks and uncertainties, including those described under Risk Factors Relating to the Company’s Business in the Company’s Annual Information Form and in each management discussion and analysis. Forward‐looking information is in addition based on various assumptions including, without limitation, the expectations and beliefs of management, the assumed long term price of copper, nickel, lead and zinc; that the Company can access financing, appropriate equipment and sufficient labour and that the political environment where the Company operates will continue to support the development and operation of mining projects. Should one or more of these risks and  uncertainties  materialize,  or  should  underlying  assumptions  prove  incorrect,  actual  results  may  vary  materially  from  those described  in  forward‐looking  statements.  Accordingly,  readers  are  advised  not  to  place  undue  reliance  on  forward‐looking statements.  Lundin Mining undertakes no obligation to update publicly or revise any forward‐looking information or statements, whether as a result of new information, future events or otherwise, except as required by applicable securities laws.