Laurion Reports Initial NI43‐101 Mineral Resource Estimate of 9,761,000 Tonnes Hosting Measured & Indicated Resource of 165,018 Oz Gold and 5,533,907 Oz Silver (265,635 Oz AuEQ) at Bell Mountain

Resource Estimates Exploration Programs

Laurion Reports Initial NI43‐101 Mineral Resource Estimate of 9,761,000 Tonnes Hosting Measured  & Indicated Resource of 165,018 Oz Gold and 5,533,907 Oz Silver (265,635 Oz AuEQ) at Bell  Mountain 

TORONTO  –  April  6,  2011  –  Laurion  Mineral  Exploration  Inc.  (TSX.V:  LME;  OTCQX:  LMEFF)  (“Laurion”)  is  pleased  to announce the completion of an initial NI43‐101 Mineral Resource Estimate for  its  100%  owned Bell Mountain Project located in  Churchill County, Nevada.  The mineral resource  estimate  was  prepared  by  Telesto Nevada, Inc.  of  Reno, Nevada  in  accordance  with  Canadian National Instrument 43‐101 requirements.  The resource is based on 54,692 feet (16,671 m) of reverse circulation (”RC”) drilling completed on the Varga, Spurr and Sphinx zones.

Resource Estimate Highlights: 

  • Measured and Indicated resource of 9,761,000 tonnes of material at an average grade of 0.526 g/t gold and 

17.63 g/t silver, hosting 165,018 ounces gold and 5,533,907 ounces silver 

  • Inferred resource of 2,046,000 tonnes of material at an average grade of 0.449 g/t gold and 13.26 g/t silver 

hosting 29,550 ounces gold and 872,411 ounces silver 

Table 1 – Global Bell Mountain Resource Estimate

MetricTonnage ('000 Tonnes)Average Gold Grade (g/Tonne)Gold (grams)Gold (ozs)Average Silver Grade (g/Tonne)Silver (grams)Silver (ozs)Total Equivalent Ounces Of Gold
Measured5,9520.5313,158,063101,53416.6298,913,0803,180,127159,355
Indicated3,8100.5181,974,57563,48419.2273,210,7962,353,780106,280
Total Measured and Indicated9,7610.5265,132,638165,01817.63172,123,8765,533,907265,635
Inferred2,0460.449919,10829,55013.2627,135,036872,41145,412

Notes:  

1. Rounding of tons as required by Form 43‐101F1 reporting guidelines (Item 19) results in apparent differences between tons, grade and contained ounces in the mineral resource.

2. Mineral Resources are estimated at a pit discard cutoff Grade at 0.192 g/t AuEQ

3. The assumed parameters used for Bell Mountain used establishing a cut‐off grade is identified as follows:

  • Gold Price ‐ $1,149.89/oz (US) ‐ 60% 3‐year previous average/40% 2‐year forward (Dec. 31, 2010)
  • Silver Price ‐ $20.92/oz US ‐ 60% 3‐year previous average/40% 2‐year forward (Dec. 31, 2010)
  • Recovery ‐ Gold 80%, Silver 51%
  • Total Operating Costs ‐ $11.43/ton (mining, processing and G&A)
  • Gold Equivalent Ratio ‐ 55 to 1 (calculations assume metallurgical recoveries and net smelter returns to be 100%)

Parameters  used  to  estimate  the  in‐situ  resource  are  based  on  information  supplied  by  Bell  Mountain  Group. Assumptions  were  made  for  items  like  strip  ratio,  mining  costs,  processing  costs  and  recovery  percentages.    These assumptions  were  based  on  published  and  previously  calculated  rates  for  other  mining  operations  having  similar parameters, and on testwork performed on Bell Mountain samples.  The operation parameters assume open pit mining and cyanide heap leaching.  A  conceptual  open  pit  mining  method was  used  for  the  purpose  of  delineating  the mineralization  with  a  reasonable  prospect  of  economic  extraction.  Tonnage  estimates  were  based  on  a  2.6 grams/cubic  centimeter  density  factor.    Inverse  distance  square  method  was  used  to  interpolate  grade  in  the resource  model  (geostatistical methods of calculating resources) using the database based on the reverse circulation (”RC”) and core drilling.

Cynthia Le Sueur–Aquin, Laurion’s President and CEO commented, "This initial resource estimate is a significant milestone  in creating value for the Corporation.  We are extremely encouraged with the results of the initial resource estimate which  resulted in an increase of 49%  from the historic resource of 2.1 million tonnes of 1.33 g/t gold and 37.55 g/t silver as a  result of the 56 hole RC drill program completed in November 2010 on the Spurr and Varga zones.   Laurion’s primary goal  is to successfully advance the project to production in the short to medium term, contemplating a conventional low cost  open pit mining method with heap leach processing configuration.   Environmental Assessment and Pre‐Feasibility study  work has commenced.  In addition, strong potential exists for further resource addition on the Spurr‐Varga fault which  remains open at depth and laterally. The Spurr‐Varga fault extends for 1.8km on surface. The Sphinx zone remains open  at depth and laterally and can be traced on surface for 900 meters. Laurion  will look to further expand the resource and  potentially drill test a number of high priority regional  targets." 

Next Steps for the Bell Mountain Project: 

1. To  complete  environmental  permitting  requirements  to  include  development  of  baseline  needs  and  mine  plan  of operations.

2. To complete a Preliminary Feasibility study for Bell Mountain.

3. To  concurrently  review  Laurion’s  target  zone  geology  focusing  on  extending  known  mineralization  and  testing peripheral targets within the 2,900 acres package at Bell Mountain.

About Laurion Minerals Exploration Inc. 

The Corporation's focus is to make the transition from explorer to near‐term producer and envisages the realization of shareholder  value  and  wealth  through  monetization  of  its  discoveries  and  assets.    Laurion's  exploration  horizons  are focused primarily on gold with a secondary interest in base metals and PGEs with key interests in prospective mining properties located in Ontario and Churchill County, Nevada USA.

The  Corporation  has  an  option  to  acquire  a  100%  interest  in  the  Bell  Mountain  Gold  Project  with  Globex  Mining Enterprises Inc. (TSE: GMX, (G1M‐Frankfurt)) ("Globex")  of Rouyn‐Noranda, Quebec.

Laurion envisages the realization of shareholder value and wealth through monetization of its discoveries and assets.

QUALIFIED PERSON 

This news release has been reviewed and approved by Jonathan M. Brown,  Telesto Nevada, Inc. and Dana Durgin,  Laurion's  Bell  Mountain  consulting  geologist  (“Bell  Mountain  Group”)  who  are  Qualified  Persons  as defined  by  NI  43‐101,  with  the  ability  and  authority  to  verify  the  authenticity  and  validity  of  the  data comprising  this  resource estimate.

FOR FURTHER INFORMATION, CONTACT:

Laurion Mineral Exploration Inc. 

Cynthia Le Sueur‐Aquin – President

Or 

Karen Doxsee – Vice President Corporate Communications

Tel: 1‐888‐212‐4070 Tel: 1‐705‐788‐9186 Fax: 1‐705‐788‐9187 Website: www.laurion.ca

Neither  TSX  Venture  Exchange  nor  its  Regulation  Services  Provider  (as  that  term  is  defined  in  the  policies  of  the  TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release includes certain forward‐looking statements concerning the future performance of Laurion's business, operations  and  financial  performance  and  condition,  as  well  as  management's  objectives,  strategies,  beliefs  and intentions.  Such statements include, but are not limited to, statements concerning the approval of Laurion's application to trade its common shares over the facilities of the OTCQX and the commencement of such trading.  Forward‐looking statements are frequently identified by such words as "may", "will", "plan", "expect", "anticipate", "estimate", "intend" and similar words referring to future events and results.  Forward‐looking statements are based on the current opinions and  expectations  of  management.    All  forward‐looking  information  is  inherently  uncertain  and  subject  to  a  variety  of assumptions, risks and uncertainties, including the speculative nature of mineral exploration and development, fluctuating commodity prices, competitive risks and the availability of financing, as described in more detail in our recent securities filings available at www.sedar.com.  Actual events or results may differ materially from those projected in the forward‐ looking statements and Laurion cautions against placing undue reliance thereon.  Laurion and its management assume no obligation to revise or update these forward looking statements