Technical Reports (NI 43-101) Economic Studies

February 23, 2016

Ivanhoe Mines releases positive results of independent pre-feasibility study for planned first phase of mine development at the Kamoa Copper Project in the Democratic Republic of Congo

First phase of development envisages an annual production rate of 100,000 tonnes of copper at a mine-site cash cost of US$0.75/lb copper

KGHM developed controlled convergence room-and-pillar mining method potentially could provide significant cost savings

KOLWEZI, DEMOCRATIC REPUBLIC OF CONGO — Ivanhoe Mines (TSX: IVN) Executive Chairman Robert Friedland and Chief Executive Officer Lars-Eric Johansson today welcomed the positive findings of an independent pre-feasibility study (PFS) for the first phase of development of the Kamoa Copper Project in the Democratic Republic of Congo (DRC).

The Kamoa Copper Project — a joint venture between Ivanhoe Mines and Zijin Mining Group Co., Ltd. — has been independently ranked as the world’s largest, undeveloped, high-grade copper discovery by international mining consultant Wood Mackenzie.

The Kamoa 2016 PFS was independently prepared by OreWin Pty Ltd., Amec Foster Wheeler E&C Services Inc. and SRK Consulting Inc. The report reflects the initial phase of project development and describes the construction and operation of a three-million-tonne-per-annum (Mtpa) underground mine, concentrator processing facility and associated infrastructure. The first phase of mining would target high-grade copper mineralization from shallow, underground resources to yield a high-value concentrate. The planned second phase would entail a major expansion of the mine and mill, and construction of a smelter to produce blister copper.

The Kamoa 2016 PFS includes an economic analysis that is based on Probable Mineral Reserves. A NI 43-101 technical report will be filed on SEDAR at www.sedar.com and on Ivanhoe Mines’ website at www.ivanhoemines.com within 45 days of the issuance of this news release.

Highlights of the Kamoa 2016 PFS:

  • Annual mine production of 3 Mtpa at an average grade of 3.86% copper over a 24-year mine

life, resulting in annual copper production of approximately 100,000 tonnes.

  • Initial capital cost, including contingency, is US$1.2 billion, approximately US$200 million

lower than estimated in the Kamoa 2013 PEA.

  • Life-of-mine average mine-site cash cost is US$0.75/lb of copper.
  • After-tax net present value (NPV) at an 8% discount rate of US$986 million.
  • After-tax internal rate of return (IRR) of 17.2% and a payback period of 4.6 years.
  • High-grade copper concentrate with an average grade of 39.2% copper and very low arsenic

levels.

  • Improvements to the mining method have the potential to reduce average mine site cash

cost during the first phase to US$0.61/lb of copper, and improve the after-tax NPV at an 8% discount rate to US$1.182 billion, the IRR to 18.9% and the payback period to 4.3 years.

“The results of this independent pre-feasibility study confirm the robustness of the Kamoa Copper Project over a wide range of copper prices, with the potential for significant improvement in the results as we move forward on the Feasibility Study,” said Mr. Friedland.

“We know of no other copper project in the world that offers the potential of multi-decade, large- scale, mechanized production from a near surface, stratiform deposit grading nearly 4% copper, with the demonstrated potential for further high-grade discoveries nearby, and located close to a major mining centre.

“With the support of our partners –– including our joint-venture partner, Zijin Mining, our employees, local entrepreneurs and community members, and the DRC government –– we are looking forward to building a major new, safe, mechanized copper mine on the western edge of the DRC’s famous Copperbelt.”

The Kamoa 2016 PFS has identified several areas for further evaluation to optimize the project’s economics, including:

  • The use of controlled convergence room-and-pillar mining, which has been successfully

used by KGHM Polska Miedź S.A. (KGHM) at its copper-mining operations in Poland for the past 20 years. Based on detailed analysis by KGHM Cuprum R&D Centre Ltd., this mining method appears to be well suited to the Kamoa deposit and, if implemented, potentially could provide significant cost savings as there would be no requirement for cemented backfill and ore extraction ratios would increase.

  • Increased production up to 4 Mtpa from the proposed initial mining area, with only limited

adjustments to the ore-handling and ventilation systems, thereby resulting in a more efficient use of capital.

Kamoa 2016 PFS Results

The base case described in the PFS is the construction and operation of an underground mine, concentrator processing facility and associated infrastructure. The base-case mining rate and concentrator feed capacity is 3 Mtpa. The life-of-mine production scenario schedules 71.9 million tonnes at an average grade of 3.86% copper over 24 years, producing 6.1 million tonnes of copper concentrate, containing approximately 5.3 billion pounds of copper.

The economic analysis used a long-term price assumption of US$3.00/lb of copper and returns an after-tax NPV at an 8% discount rate of US$986 million. It has an after-tax IRR of 17.2% and a payback period of 4.6 years.

The initial capital cost, including contingency, is US$1.2 billion. The initial capital cost includes a US$104 million advance payment to the DRC state-owned electricity company, SNEL, to upgrade two hydro power plants (Koni and Mwadingusha) to provide Kamoa with access to clean electricity during the initial phase of operations. The upgrading work is being led by Stucky Ltd., of Switzerland, and the advance payment is expected to be recovered through a reduction in the power tariff once Kamoa is in operation. The life-of-mine average mine site cash cost is US$0.75/lb of copper. Key results of the PFS are summarized in Table 1.1.

Table 1.1 PFS Results Summary

ItemUnitTotal
Ore Processed (Life of Mine)
Quantity Ore Treatedkilotonne (kt)71,893
Copper Feed Grade%3.86
Concentrate Produced (Life of Mine)
Copper Concentrate Producedkt (dry)6,106
Copper Recovery%86.36
Copper Concentrate Grade%39.20
Contained Metal in Concentratemillion pounds (Mlb)5,277
Contained Metal in Concentratekt2,394
Key Financial Results
Initial CapitalUS$M1,213
Mine-Site Cash CostUS$/lb Payable Cu0.75
Total Cash CostUS$/lb Payable Cu1.48
Site Operating CostsUS$/t ore53.22
After-Tax NPV8%US$M986
After-Tax IRR%17.2%
Project Payback PeriodYears4.6

Table 1.2 summarizes the financial results and Table 1.3 summarizes mine production and processing statistics.

Table 1.2 Financial Results

Before TaxationAfter Taxation
Net Present Value (US$M)Undiscounted5,7914,096
4.0%2,9792,036
6.0%2,1521,429
8.0%1,549986
10.0%1,104657
12.0%768409
IRR–20.7%17.2%
Project Payback (years)–4.14.6

Table 1.3 Mine Production and Processing Statistics

ItemUnitTotal LOMYears 1-5Years 6-10LOM
Ore Processed
Quantity Ore Treatedkt71,8932,9343,0082,996
Copper Feed Grade%3.864.354.083.86
Concentrate Produced
Copper Concentrate Producedkt6,106283271254
Copper Recovery%86.3687.0686.6886.36
Copper Concentrate Grade%39.2039.2039.2039.20
Contained Metal in Concentrate
Copperkt2,394111106100
CopperMlb5,277245234220
Payable Metal
Copperkt2,31410710396
CopperMlb5,102237227213

Figures 1.1 and 1.2 depict the processing, concentrate and metal production, respectively.

Figure 1.1 Processing Production

3,500 7.00

3,000 6.00

2,500 5.00

2,000 4.00

1,500 3.00

1,000 2.00

1.00

  • – 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Project Time (Years)

Ore Milled Cu Grade Milled

Figure by OreWin, February 2016.

Figure 1.2 Concentrate and Metal Production

– 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Project Time (Years)

Concentrate Produced (kt) Cu in Concentrate (kt)

Figure by OreWin, February 2016.

Figure 1.3 Copper Equivalent Production for Highly-Probable Copper Projects Currently Under Construction

Target Annual Copper Copper Head Grade Eq. Production (ktpa) (% Cu) 350 6.00%

5.00%

4.00%

3.00%

2.00%

1.00%

  • -

Figure based on data from Wood Mackenzie, February 2016. Note: All greenfield development projects classified as “highly probable” by Wood Mackenzie. Source: Wood Mackenzie (based on public disclosure and information gathered in the process of routine research. The Kamoa 2016 PFS has not been reviewed by Wood Mackenzie).

Table 1.4 summarizes unit operating costs and Table 1.5 provides a breakdown of revenue and operating costs. The capital costs for the project are detailed in Table 1.6.

Table 1.4 Unit Operating Costs

US$/lb Payable Copper
LOM AVGYears 15Years 610
Mine Site Transport Treatment & Refining Charges Royalties & Export Tax0.75 0.41 0.18 0.150.55 0.43 0.18 0.110.75 0.40 0.18 0.16
Total C1 Cash Cost1.481.271.48

Table 1.5 Revenue and Operating Costs

DescriptionTOTAL LOMYEARS 1-5YEARS 6-10LOM AVG
US$MUS$/t Ore Milled
REVENUE Copper in Concentrate REALIZATION COSTS Transport Treatment & Refining Royalties & Export Tax Total Realization Costs15,305 2,082 911 748 3,741242 35 14 9 58226 30 13 12 56213 29 13 10 52
Net Sales Revenue11,565184170161
SITE OPERATING COSTS Underground Mining Processing Tailings General & Administration SNEL Discount Customs Total Site Operating Costs2,453 886 25 511 -109 60 3,82625 12 0 8 -2 1 4537 12 0 7 -2 1 5634 12 0 7 -2 1 53
Operating Margin Operating Margin7,738 66.9%140 75.8%114 67.0%108 66.9%

Table 1.6 Capital Investment Summary

DescriptionInitial CapitalSustainingTotal
US$MUS$MUS$M
MINING Underground Mining Subtotal508 508499 4991,007 1,007
POWER Power Infrastructure On Site Power Supply Off Site Subtotal19 104 1604 – 423 141 164
CONCENTRATE & TAILINGS Process Plant Tailings Subtotal160 23 1828 62 69167 84 252
INFRASTRUCTURE Plant Infrastructure Other Infrastructure Owners Camp Contractors Camp Subtotal18 8 10 23 594 2 2 5 1423 10 12 28 73
INDIRECTS Engineering, Procurement and Construction Management Subtotal58 58– –58 58
OWNERS COST Owners Cost Closure Subtotal95 – 95– 67 6795 67 162
Capital Expenditure before Contingency1,0256551,679
Contingency18944233
Capital Expenditure after Contingency1,2136991,912

Figure 1.4 Capital Intensity for Highly-Probable Copper Projects Currently Under Construction

Capital Intensity (US$ / tpa Copper Eq. Production)

$30,000

$25,000

$20,000 Average: $16,184 $15,000

$10,000

$5,000

-

Figure based on data from Wood Mackenzie, February 2016. Note: All greenfield development projects classified as “highly probable” by Wood Mackenzie. Source: Wood Mackenzie (based on public disclosure and information gathered in the process of routine research. The Kamoa 2016 PFS has not been reviewed by Wood Mackenzie).

The cash flow sensitivity to metal price variation is shown in Table 1.7 for copper prices from US$2.00/lb to US$4.00/lb.

The sensitivity of after-tax NPV to initial capital cost, direct operating costs, transport and copper feed grade is shown in Table 1.8. The table shows the impact on the base case after-tax NPV8% of US$986M.

Table 1.7 Copper Price Sensitivity

After Tax NPV (US$M)Copper Price – US$/lb
Discount Rate2.002.503.003.504.00
Undiscounted 4.0% 6.0% 8.0% 10.0% 12.0% 15.0%613 -20 -206 -340 -438 -508 -5792,364 1,020 624 336 123 -36 -2064,096 2,036 1,429 986 657 409 1425,828 3,050 2,230 1,632 1,187 851 4867,560 4,063 3,030 2,276 1,714 1,289 827
IRR3.8%11.5%17.2%22.2%26.6%

Table 1.8 Additional Sensitivities

Change from Base NPV8% (US$M)
VariableUnitsBase Value-25.0%-10.0%–10.0%25.0%
Initial CapitalUS$M1,2131,2521,092986879720
Direct operating costs per tonne of ore milledUS$/t531,2151,077986894757
Transport costs per tonne of concentrateUS$/t356 / 3001,1221,040986931849
Copper feed grade% Cu3.86%1756629861,3081,794

Figure 1.5 Cumulative Cash Flow

3,500

2,500

1,500

-500

-1,500 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

Project Time (Years)

Figure by OreWin, February 2016.

Kamoa Copper Project Description

The Kamoa Copper Project is a very large, stratiform copper deposit with adjacent prospective exploration areas within the Central African Copperbelt, approximately 25 kilometres west of the town of Kolwezi and about 270 kilometres west of Lubumbashi. The Kamoa copper deposit was discovered by Ivanhoe Mines in 2008.

In August 2012, the DRC government granted mining licences to Ivanhoe Mines for the Kamoa Copper Project that cover a total of 400 square kilometres. The licences are valid for 30 years and can be renewed at 15-year intervals. Mine development work at the Kamoa Copper Project began in July 2014 with construction of a box cut for the decline ramps that will provide underground access to the initial high-grade mining area in Kansoko Sud.

Ivanhoe Mines owns a 49.5% interest in Kamoa Holding Limited (Kamoa Holding), an Ivanhoe affiliate that presently owns 95%, on an indirect basis, of the Kamoa Copper Project. Zijin Mining owns a 49.5% interest in Kamoa Holding, which it acquired from Ivanhoe in December 2015 for an aggregate cash consideration of US$412 million. The remaining 1% interest in Kamoa Holding is held by privatelyowned Crystal River Global Limited.

A 5%, non-dilutable interest in Kamoa Copper SA, the affiliate that owns the Kamoa Copper Project, was transferred to the DRC government on September 11, 2012, for no consideration, in accordance with the DRC Mining Code. Ivanhoe also has offered to transfer an additional 15% interest to the DRC government on terms to be negotiated. Constructive and cordial negotiations between Ivanhoe Mines, Zijin and senior DRC government officials have been continuing in this regard.

On January 25, 2016, Ivanhoe announced that the Kamoa exploration team made a major new highgrade and flat-lying stratiform copper discovery, named Kakula, located approximately five kilometres southwest of Kamoa’s currently defined resources. The Kakula Discovery is situated within the 400square-kilometre Kamoa Mining Licence area and represents a major extension of the Kamoa copper deposit, which the company discovered in 2008. Two exploration drill holes completed in late 2015 in the Kakula exploration area — DD996 and DD997 — rank among the highest-grade and highest-gradethickness intersections drilled to date within the Kamoa Mining Licence area. The Kakula Discovery is not included in the economic analysis of the Kamoa 2016 PFS. Additional details of the Kakula Discovery can be found in Ivanhoe’s January 25, 2016 news release available at www.ivanhoemines.com.

Box cut (portal) at Kamoa’s initial high-grade mining area — Kansoko Sud

Figure 1.6 Kamoa Project map showing the Indicated and Inferred Resource areas, the initial mining area at Kansoko Sud, and the Kakula exploration area