Tuesday, October 20, 2026
MiningNewsTerminal
Tuesday, October 20, 2026 Admin

ISO.TO ·

IsoEnergy to Acquire Dawn Lake North Block to Expand Geiger Property in the Athabasca Basin

Mergers & Acquisitions Property Options & Staking Exploration Programs

Vancouver, BC, March 26, 2018 – IsoEnergy Ltd. (“IsoEnergy” or the “Company”) (TSXV: ISO; OTCQX: ISENF) is pleased to announce that it has entered into an agreement with Cameco Corp., Orano Canada Inc. and JCU (Canada) Exploration Company Ltd. to acquire a 100% interest in 33 mineral claims from their Dawn Lake property constituting the 6,800 hectare Dawn Lake North Block (the “Property”) in the Eastern Athabasca Basin of Saskatchewan.

Craig Parry, Chief Executive Officer commented: “I’m very pleased with the addition of the Dawn Lake North claims to our Geiger property as it furthers our objective of acquiring highly prospective assets in the Eastern Athabasca Basin near uranium mining and milling infrastructure.  IsoEnergy is uniquely positioned to apply the basement‐hosted uranium experience of its Officers and Directors gained from recent discoveries such as the Arrow and Gryphon deposits to properties on which there has been limited testing of basement potential.  We continue to believe in the strong fundamentals of the uranium sector and will continue to execute on our strategy of acquiring undervalued assets during this time of unsustainably low uranium prices and ahead of the inevitable return to normalized pricing levels.”

Steve  Blower,  Vice  President  of  Exploration  commented:  “The  acquisition  of  Dawn  Lake  North  further strengthens  our  exploration  property  portfolio  due  to  the  presence  of  uranium  and  uranium  pathfinder mineralization along with many kilometres of underexplored graphitic metasediments with basement‐hosted drill targets beneath thin sandstone cover.  Strategically, its location linking the current Geiger claims ensures exploration efficiency on the entire block.”

The Property 

Dawn Lake North is contiguous with IsoEnergy’s recently acquired Geiger property and is located 10 kilometres northwest  of  IsoEnergy’s  Radio  property  and  15  kilometres  northwest  of  Orano  Canada’s  McClean  Lake uranium mine and mill (Figure 1).  It will be treated as an expansion of the Geiger property and the combined set of claims will be referred to as Geiger henceforth.  The total area of the expanded Geiger property will be 12,594 hectares.

A  total  of  63  historic  drill  holes  have  been  completed  at  the  Property  along  115  kilometres  of  graphitic conductors (Figure 2).  Sandstone cover is thin, ranging between 100 metres and 300 metres in previous drilling.  The Property is located adjacent to the Wollaston‐Mudjatik transition zone ‐ a major crustal suture related to most of the major uranium deposits in the eastern Athabasca Basin.

Two  zones  of  basement  hosted  mineralization  have  been  intersected  in  historic  drilling.    Drill  hole  Q23‐5 intersected  1.5  metres  of  0.08%  U3O8,  0.98%  Co  and  0.75%  Ni  12  metres  below  the  unconformity  in  the northern part of the property.  Sandstone in the drill hole contains intervals of strong bleaching with clay and secondary hematite.  The upper basement in Q23‐5 is strongly clay and chlorite altered over the top eight metres.  Additionally, drill hole Q48‐1 intersected uranium pathfinder mineralization consisting of 0.79% Cu and 0.11% As over 0.3 metres in a graphitic fault gouge 40 metres below the unconformity in the southern part of  the  Property.    Follow  up  drilling  was  highly  recommended  at  the  time  due  to  the  presence  of  the mineralization and impressive sandstone alteration consisting of long intervals of strong bleaching, fracturing and clay alteration.  However, no follow‐up was completed in the immediate area.

Exploration work including drilling of targets around these mineralized zones will become a major focus of IsoEnergy’s future exploration plans.  Additionally, further exploration on high‐priority targets along the large strike length of graphitic conductors on the Property will be completed.

The Terms 

In exchange for a 100% interest in the Property, IsoEnergy will pay C$200,000 in cash and will issue 3,330,000 common shares to the Joint Venture.  The shares will be subject to a 4‐month hold period and the transaction is subject to TSXV approval.

Initial exploration efforts consisting of data compilation and interpretation will begin immediately.  This may be followed by a core drilling program in the second half of 2018 that would evaluate high priority targets at both the Dawn Lake North property and the original Geiger property.

Figure 1 – Location Map

Figure 2 – Property Map  

Qualified Person Statement 

The scientific and technical information contained in this news release was prepared by Steve Blower, P.Geo., IsoEnergy’s Vice President, Exploration, who is a “qualified person” (as defined in National Instrument 43‐101

  • Standards of Disclosure for Mineral Projects).  Mr. Blower has verified the data disclosed.

This news release refers to properties other than those in which the Company has an interest. Mineralization on those other properties is not necessarily indicative of mineralization on the Company’s properties.

About IsoEnergy 

IsoEnergy is a well‐funded uranium exploration and development company with a portfolio of prospective projects in the eastern Athabasca Basin in Saskatchewan, Canada and a historic inferred mineral resource estimate at the Mountain Lake uranium deposit in Nunavut.  IsoEnergy is led by a Board and Management team with a track record of success in uranium exploration, development and operations.  The Company was founded and is supported by the team at its major shareholder, NexGen Energy Ltd.

Craig Parry  Chief Executive Officer   IsoEnergy Ltd. 

+1 778 379 3211 [email protected] www.isoenergy.ca

Investor Relations  Kin Communications 

+1 604 684 6730 [email protected] www.isoenergy.ca

Neither the TSX Venture Exchange nor its Regulations Services Provider (as that term is defined in the  policies  of  the  TSX  Venture  Exchange)  accepts  responsibility  for  the  adequacy  or  accuracy  of  this  release. 

This news release shall not constitute an offer to sell or a solicitation of any offer to buy any securities,  nor shall there be any sale of any securities in any jurisdiction in which such offer, solicitation or sale  would be unlawful. The securities referenced herein have not been, nor will they be, registered under the  United States Securities Act of 1933, as amended (the “U.S. Securities Act”), and such securities may not  be  offered  or  sold  within  the  United  States  absent  registration  under  the  U.S.  Securities  Act  or  an  applicable exemption from the registration requirements thereunder.  

Forward‐Looking Information 

The  information  contained  herein  contains  “forward‐looking  statements”  within  the  meaning  of  the  United States Private Securities Litigation Reform Act of 1995 and “forward‐looking information” within  the meaning of applicable Canadian securities legislation. “Forward‐looking information” includes, but is  not  limited  to,  statements  with  respect  to  the  activities,  events  or  developments  that  the  Company  expects or anticipates will or may occur in the future, including, without limitation, planned exploration  activities and completion of the acquisition of the Property. Generally, but not always, forward‐looking  information  and  statements  can  be  identified  by  the  use  of  words  such  as  “plans”,  “expects”,  “is  expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the  negative connotation thereof or variations of such words and phrases or state that certain actions, events  or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved” or the negative  connotation thereof. 

Such forward‐looking information and statements are based on numerous assumptions, including among  others, that the results of planned exploration activities are as anticipated, the price of uranium, the  anticipated cost of planned exploration activities, that general business and economic conditions will not  change  in  a  material  adverse  manner,  that  financing  will  be  available  if  and  when  needed  and  on  reasonable terms, that third party contractors, equipment and supplies and governmental and other  approvals  required  to  conduct  the  Company’s  planned  exploration  activities  will  be  available  on  reasonable terms and in a timely manner and that the acquisition of the Property will be completed on  the terms currently agreed to. Although the assumptions made by the Company in providing forward‐ looking information or making forward‐looking statements are considered reasonable by management  at the time, there can be no assurance that such assumptions will prove to be accurate. 

Forward‐looking information and statements also involve known and unknown risks and uncertainties  and other factors, which may cause actual events or results in future periods to differ materially from any  projections  of  future  events  or  results  expressed  or  implied  by  such  forward‐looking  information  or  statements,  including,  among  others:  negative  operating  cash  flow  and  dependence  on  third  party  financing,  uncertainty  of  additional  financing,  no  known  mineral  reserves  or  resources,  the  limited  operating history of the Company, the influence of a large shareholder,  alternative sources of energy and  uranium  prices,  aboriginal  title  and  consultation  issues,  reliance  on  key  management  and  other  personnel, actual results of exploration activities being different than anticipated, changes in exploration  programs  based  upon  results,  availability  of  third  party  contractors,  availability  of  equipment  and  supplies, failure of equipment to operate as anticipated; accidents, effects of weather and other natural  phenomena  and  other  risks  associated  with  the  mineral  exploration  industry,  environmental  risks,  changes in laws and regulations, community relations and delays in obtaining governmental or other  approvals. 

Although the Company has attempted to identify important factors that could cause actual results to  differ materially from those contained in the forward‐looking information or implied by forward‐looking  information,  there  may  be  other  factors  that  cause  results  not  to  be  as  anticipated,  estimated  or  intended. There can be no assurance that forward‐looking information and statements will prove to be  accurate, as actual results and future events could differ materially from those anticipated, estimated or  intended.  Accordingly,  readers  should  not  place  undue  reliance  on  forward‐looking  statements  or  information.  The Company undertakes no obligation to update or reissue forward‐looking information  as a result of new information or events except as required by applicable securities laws