Sunday, October 18, 2026
MiningNewsTerminal
Sunday, October 18, 2026 Admin

ISO.TO ·

IsoEnergy Receives Drilling Permits and Finalizes Plans to Extend Uranium Mineralization at the Hurricane Zone, Athabasca Basin, Saskatchewan

Drill Results Exploration Programs Permits & Approvals

Vancouver, BC, December 13, 2018 – IsoEnergy Ltd. (“IsoEnergy” or the “Company”) (TSXV: ISO; OTCQX:  ISENF) is pleased to announce that it is now in receipt of all required permits for its planned drilling program designed to extend the high‐grade uranium mineralization intersected in previously reported drill hole LE18‐ 01A – the Hurricane zone.

Planned Drilling Program Highlights 

  • The follow‐up drill program is planned to begin in early January, is fully funded and consists of 

4,500 metres of drilling in 10 drill holes 

  • Initial drill holes will be 12.5 metre step‐outs on section with drill hole LE18‐01A 
  • Subsequent drill holes will step out along strike 25‐50 metres in both directions 

The discovery drill hole LE18‐01A was completed on the 100% owned Larocque East property (the “Property”) in  the  Eastern  Athabasca  Basin,  Saskatchewan  in  July.    A  broad,  8.5‐metre‐long  interval  of  elevated  radioactivity (see news release dated July 25, 2018) averages 1.26% U3O8 (above a cutoff of 0.1% U3O8) and includes  a  zone  of  off‐scale  radioactivity  (>15,000  cps  on  an  SRAT  SPP2  scintillometer  (the  “SPP2”))  that averages 6.45% U3O8 over 1.0 metre.  Figure 1 shows the location of the Larocque East property and the Hurricane zone.

Steve Blower, Vice President, Exploration commented: “The geology and geochemistry at the Hurricane zone suggest  that  the  mineralization  intersected  in  drill  hole  LE18‐01A  may  extend  in  several  directions.    Our approach to the follow‐up drilling scheduled for January, 2019 will be thorough and systematic to ensure that we understand the controls on mineralization and maximize our chance of success.”

Planned Drilling Program

Drilling is planned to commence in January, 2019 after freeze‐up in the Athabasca Basin allows ground access to the property.  Initial drill holes will determine the nature and extent of the zone on the LE18‐01A cross‐ section, with holes drilled both to the northwest and southeast of drill hole LE18‐01A.  Drill hole spacing on the section is expected to be approximately 12.5 metres and is shown on the cross‐section in Figure 2.  Some of the on‐section follow‐up drill holes will be allowed to penetrate deep into the basement below LE18‐01A to explore for basement‐hosted uranium mineralization.  Once the dimensions and the geology on the LE18‐01A cross‐section are fully understood, subsequent drill holes will step out along‐strike of the Hurricane zone in both directions.  The expected step‐out distance along‐strike is 25‐50 metres, depending on the results from the initial drill holes.  All permits from the Saskatchewan Ministry of Environment required for the drilling program are now in hand.

The Hurricane Zone 

Mineralization at the Hurricane Zone lies beneath 40 metres of overburden and 285 metres of Athabasca sandstone.  Basement rocks are dominated by pelitic gneisses that are commonly highly graphitic.  Drill hole LE18‐01A intersected an 8.5‐metre‐long interval of uranium mineralization that straddles the sub‐Athabasca unconformity and consists of fracture controlled and disseminated pitchblende with hematite and clay from 338.5‐347.0 metres (down‐hole length).

The Property 

Larocque East consists of 6 mineral claims totaling 3,200 hectares and was recently purchased in May, 2018. The Property is owned 100% by IsoEnergy and is not encumbered by any royalties or other interests.  Larocque East is immediately adjacent to the north end of IsoEnergy’s recently expanded Geiger property and is 35 kilometres northwest of Orano Canada’s McClean Lake uranium mine and mill.

The Property covers a 15‐kilometre‐long northeast extension of the Larocque Lake conductor system; a trend of graphitic metasedimentary basement rocks that is associated with significant uranium mineralization in several occurrences to the southwest of the Larocque East property.  The closest of these are the Larocque Lake and Larocque North zones, which are located 6.5 kilometres and 0.4 kilometres, respectively, to the southwest of the western Larocque East property boundary.  Drilling at the Larocque Lake zone has returned intersections of up to 29.9% U3O8 over 7.0 metres in drill hole Q22‐040.  The Larocque East property is located adjacent  to  the  Wollaston‐Mudjatik transition  zone  ‐ a  major  crustal  suture  related to most of  the  major uranium  deposits  in  the  eastern  Athabasca  Basin.    Importantly,  the  vertical  distance  from  surface  to  the unconformity is short, ranging between 140 metres and 330 metres in previous drilling.  A total of 23 historical drill holes have been completed on the Property along approximately 22 kilometres of graphitic conductors.

Figure 1 – Larocque East Property Location Map 

Figure 2 – LE18‐01A Cross Section with Uranium Geochemistry  

Qualified Person Statement 

The scientific and technical information contained in this news release was prepared by Steve Blower, P.Geo., IsoEnergy’s Vice President, Exploration, who is a “qualified person” (as defined in National Instrument 43‐101

  • Standards of Disclosure for Mineral Projects).  Mr. Blower has verified the data disclosed.  This news release

refers to properties other than those in which the Company has an interest. Mineralization on those other properties is not necessarily indicative of mineralization on the Company’s properties.  As drill hole LE18‐01A was drilled steeply at ‐70 degrees and the mineralization is interpreted to be horizontal, the true thickness is expected to be approximately 90% of the cored intervals.  Sample preparation and analyses were completed at SRC Geoanalytical Laboratories in Saskatoon, Saskatchewan.  Uranium assays at SRC are by Inductively Coupled Plasma – Optical Emission Spectroscopy (ICP‐OES) and quality is controlled through the inclusion of internal duplicates, blanks and standards.

About IsoEnergy 

IsoEnergy is a well‐funded uranium exploration and development company with a portfolio of prospective projects in the eastern Athabasca Basin in Saskatchewan, Canada and a historical inferred mineral resource estimate at the Mountain Lake uranium deposit in Nunavut.  IsoEnergy is led by a Board and Management team with a track record of success in uranium exploration, development and operations.  The Company was founded and is supported by the team at its major shareholder, NexGen Energy Ltd.

Craig Parry  Chief Executive Officer   IsoEnergy Ltd. 

+1 778 379 3211 [email protected] www.isoenergy.ca

Investor Relations  Kin Communications 

+1 604 684 6730 [email protected] www.isoenergy.ca

Neither the TSX Venture Exchange nor its Regulations Services Provider (as that term is defined in the  policies  of  the  TSX  Venture  Exchange)  accepts  responsibility  for  the  adequacy  or  accuracy  of  this  release. 

This news release shall not constitute an offer to sell or a solicitation of any offer to buy any securities,  nor shall there be any sale of any securities in any jurisdiction in which such offer, solicitation or sale  would be unlawful. The securities referenced herein have not been, nor will they be, registered under the  United States Securities Act of 1933, as amended (the “U.S. Securities Act”), and such securities may not  be  offered  or  sold  within  the  United  States  absent  registration  under  the  U.S.  Securities  Act  or  an  applicable exemption from the registration requirements thereunder.  

Forward‐Looking Information 

The  information  contained  herein  contains  “forward‐looking  statements”  within  the  meaning  of  the  United States Private Securities Litigation Reform Act of 1995 and “forward‐looking information” within  the meaning of applicable Canadian securities legislation. “Forward‐looking information” includes, but is  not  limited  to,  statements  with  respect  to  the  activities,  events  or  developments  that  the  Company  expects or anticipates will or may occur in the future, including, without limitation, planned exploration  activities. Generally, but not always, forward‐looking information and statements can be identified by  the  use  of  words  such  as  “plans”,  “expects”,  “is  expected”,  “budget”,  “scheduled”,  “estimates”,  “forecasts”, “intends”, “anticipates”, or “believes” or the negative connotation thereof or variations of  such words and phrases or state that certain actions, events or results “may”, “could”, “would”, “might”  or “will be taken”, “occur” or “be achieved” or the negative connotation thereof. 

Such forward‐looking information and statements are based on numerous assumptions, including among  others, that the results of planned exploration activities are as anticipated, the price of uranium, the  anticipated cost of planned exploration activities, general business and economic conditions will not  change  in  a  material  adverse  manner,  that  financing  will  be  available  if  and  when  needed  and  on  reasonable terms, that third party contractors, equipment and supplies and governmental and other  approvals  required  to  conduct  the  Company’s  planned  exploration  activities  will  be  available  on  reasonable terms and in a timely manner. Although the assumptions made by the Company in providing  forward‐looking  information  or  making  forward‐looking  statements  are  considered  reasonable  by  management at the time, there can be no assurance that such assumptions will prove to be accurate. 

Forward‐looking information and statements also involve known and unknown risks and uncertainties  and other factors, which may cause actual events or results in future periods to differ materially from any  projections  of  future  events  or  results  expressed  or  implied  by  such  forward‐looking  information  or  statements,  including,  among  others:  negative  operating  cash  flow  and  dependence  on  third  party  financing,  uncertainty  of  additional  financing,  no  known  mineral  reserves  or  resources,  the  limited  operating history of the Company, the influence of a large shareholder,  alternative sources of energy and  uranium  prices,  aboriginal  title  and  consultation  issues,  reliance  on  key  management  and  other  personnel, actual results of exploration activities being different than anticipated, changes in exploration  programs  based  upon  results,  availability  of  third  party  contractors,  availability  of  equipment  and  supplies, failure of equipment to operate as anticipated; accidents, effects of weather and other natural  phenomena  and  other  risks  associated  with  the  mineral  exploration  industry,  environmental  risks,  changes in laws and regulations, community relations and delays in obtaining governmental or other  approvals. 

Although the Company has attempted to identify important factors that could cause actual results to  differ materially from those contained in the forward‐looking information or implied by forward‐looking  information,  there  may  be  other  factors  that  cause  results  not  to  be  as  anticipated,  estimated  or  intended. There can be no assurance that forward‐looking information and statements will prove to be  accurate, as actual results and future events could differ materially from those anticipated, estimated or  intended.  Accordingly,  readers  should  not  place  undue  reliance  on  forward‐looking  statements  or  information.  The Company undertakes no obligation to update or reissue forward‐looking information  as a result of new information or events except as required by applicable securities laws