TriMetals Mining Inc. Completes Very Positive NI 43-101 Compliant PEA at Gold Springs

May 1, 2014, Vancouver, British Columbia—TriMetals Mining Inc. (TSX: TMI and TMI.B, US OTCQX: TMIAF & TMIBF), a gold stock, is pleased to announce the completion of its very positive first 43-101 compliant Preliminary Economic Assessment (“PEA”) at the Gold Springs gold-silver project in mining friendly Nevada/Utah, USA.

The PEA supports:

  • a 9 year, 10,000 tpd “heap-leach” project;
  • a pre-tax NPV5%of US$162 million;
  • a pre-tax IRR of 57.5%;
  • a cash cost of US$614/AuEq*oz; and
  • total costs of US$749/AuEq*oz.

These estimates were made using the previously disclosed 2014 mineral resource estimate for Gold Springs, a $1,300/oz gold price and $21/oz silver price and assumes contractor mining. The Company has so far only drilled portions of 2 of 18 areas of outcropping gold mineralization and none of the buried geophysical targets at Gold Springs.

The entire Technical Report containing the PEA can be viewed under the Company’s profile on SEDAR or on the Company's website at:

www.trimetalsmining.com

Ralph Fitch, President and CEO stated “As I alluded to in my recent Letter to Shareholders a strongly positive PEA such as the one announced here moves the Company from the realm of exploration speculation to a Company with an asset with an estimated value that can be moved towards production by completion of engineering studies. The massive advantage the Company has is that less than 10% of the prospective areas at Gold Springs have been drilled, so even though the present resource estimate provides the ounces for a strongly positive PEA, there is a significant opportunity to expand the estimated resource through drilling and further enhance both the project and Company’s common share-valuation.”

Importantly the study also reviewed economics at lower gold prices and the project returned a positive pre-tax net present value with a discount rate of 5% (“NPV5%”) of $82 million with a pretax 33% internal rate of return (“IRR”) even at a $1,000/oz gold price.

Lane and Associates Inc. was contracted to complete a Scoping Study on the Gold Springs Project which was upgraded into a PEA supported by a National Instrument 43-101 compliant Technical Report. The concept was to assess whether the present project could potentially be developed into a profitable operation.

The issue was studied by developing a series of pits using the existing Gold Springs resource estimate starting with the highest grade material and lowest production rate, Case 1, to a pit including the lowest mineable grade and a higher production rate, Case 7.

The seven cases assessed in the PEA using the existing resource estimate show that the most robust case (Case 4), the one described at the beginning of this news release, is a 10,000 tonne per day (“tpd”) open pit operation which extracts the gold and silver in a “heap leach” and recovers the metal through the Merrill- Crowe process.

The actual project would be designed such that it could be expanded if and when the resource estimate is expanded.

Management believes that additional expansion of the resource estimate from the present base, with additional exploration, is very likely since resource drilling has only been carried out on a limited portion of the prospective areas.

The PEA used a base case gold price of $1,300 an ounce and a silver price of $21 an ounce. Each Case was also reviewed at lower gold prices and Case 4 returned a positive pre-tax NPV5% of $82million with a pre-tax 33%IRR even at a $1,000/oz gold price (with $21/oz silver price) and if gold rises in value, then the Case 4 pre-tax NPV5% doubles to $324M at a gold price of $1,900/oz. This demonstrates that Gold Springs is a very robust gold-silver project.

Case 4-Contractor Mining capex is $58M and operating costs are $8.16/ore tonne. The pre-tax payback period is approximately 1.5 years or approximately 2 years after tax. The Case 4 project produced an average of 48,000 oz AuEq* per year yielding an average pre-tax cash flow per year of $25M for 9 years with the first 3 years being $13M, $50M and $46M.

In the after tax Case 4- Contractor Mining Scenario the NPV5% drops to US$109 million from US$162 million and the IRR from 57.5% to 42%. This assumed a 25% Federal tax rate and 5% State tax for Nevada and Utah.

About TriMetals Mining Inc.

TriMetals Mining Inc. is a growth focused mineral exploration company creating value through the exploration and development of the near surface, Gold Springs gold-silver project in mining friendly Nevada and Utah in the U.S.A.; the advancement of the large scale Escalones copper-gold project in Chile, and realization of value from the expropriated Malku Khota project in Bolivia through an arbitration process.

The Company’s approach to business combines the team’s track record of discovery and advancement of large projects, key operational and process expertise, and a focus on community relations and sustainable development. Management has extensive experience in the global exploration and mining industry.

The Company’s common shares and Class B shares are listed on the Toronto Stock Exchange under the symbols “TMI” and “TMI.B” and the common shares and Class B shares also trade on the OTCQX market under the symbol “TMIAF” and “TMIBF”. Additional information related to TriMetals Mining Inc. is available at www.trimetalsmining.com and on SEDAR at www.sedar.com.

Qualified Person

The information in this news release was derived from the Preliminary Economic Assessment on the Gold Springs Property, Utah/Nevada, USA dated April 30, 2014, authored by Lane and Associates and Kurt Katsura. Lane and Associates prepared the economic analysis in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects (NI 43-101). Ms. Terre Lane, President of Lane and Associates is a “qualified person”, as defined in NI 43-101, is “independent” of the Company, as defined in NI 43-101, and has reviewed and approved the technical information regarding the economic analysis in this release. The NI 43-101 compliant Technical Report supporting the PEA was filed on SEDAR on May 1, 2014.

Gold Equivalence: AuEq* was calculated using a gold/silver ratio of 57.14 to be consistent with that used for the previously reported resource estimate.

TriMetals Mining Inc. Contact:

Ralph Fitch Matias Herrero President & CEO Chief Financial Officer 303.584.0606 303.584.0606 [email protected] [email protected]

Forward Looking Statements

The PEA was prepared to broadly quantify the Gold Springs project's capital and operating  cost  parameters  and  to  provide  guidance  on  the  type  and  scale  of  future  project  engineering and development work that will be needed to ultimately define the project's  likelihood of a positive feasibility determination and optimal production rate. It was not  prepared to be used as a valuation of the project nor should it be considered to be a final  feasibility study on which a commercial production decision could be made. The capital  and  operating  cost  estimates  which  were  used  have  been  developed  only  to  an  approximate order of magnitude based on generally understood capital cost to production  level  relationships,  and  although  they  are  based  on  engineering  studies,  these  are  preliminary so the ultimate costs may vary widely from the amounts set out in the PEA.  This could materially adversely impact the projected economics of the project. As is normal  at  this  stage  of  a  project,  data  in  some  areas  was  incomplete  and  estimates  were  developed based solely on the expertise of the Company’s employees and consultants. At  this  stage  of  development  for  Gold  Springs  the  criteria,  methods  and  estimates  are  preliminary and result in a high level of subjective judgment being employed. There can  be no assurance that the potential results contained in the PEA will be realized 

Certain  statements  contained  herein  constitute  “forward‐looking  statements”.  These  forward  looking  statements  include,  but  are  not  limited  to,  statements  regarding  estimated  mineral  resources  and  the  potential  for  delineation  of  additional  resources  through  further  exploration  at  the  Gold  Springs,  as  well  as  statements  regarding  estimated net present values, internal rates of return, daily and annual production, costs,  metal prices, and statements regarding the Company’s development plan for Gold Springs.   These forward‐ looking statements are based on current expectations and entail various  risks and uncertainties. Actual  results  may  materially  differ  from  expectations  if  known   and  unknown  risks  or uncertainties affect our business or if our estimates or assumptions  prove  inaccurate.  Factors  that  could  cause  results  or  events  to  differ  materially  from  current expectations expressed or implied by the forward‐looking statements, include, but  are  not    limited  to,  risks  of  the  mineral  exploration  industry  which  may  affect  the  advancement  of  the  Gold  Springs  project,  including  possible  variations  in  mineral  resources, grade, metal prices, capital and operating costs, and the application of taxes;  availability of sufficient financing to fund planned or further required work in a timely  manner  and  on  acceptable  terms;  timely  receipt  of  required  permits,  availability  of  equipment  and  qualified  personnel,  failure  of  equipment  or  processes  to  operate  as  anticipated,  changes  in  project  parameters  as  plans  continue  to  be  refined;  failure  of  equipment or processes to operate as anticipated; regulatory, environmental and other  risks of the mining industry more fully described in the Company’s Annual Information  Form,  which  is  available  on  SEDAR  at    www.sedar.com.    The  assumptions  made  in  developing  the  forward‐looking  statements  include:  the  accuracy  of  current  resource  estimates  and  the  interpretation  of  drill,  metallurgical  testing  and  other  exploration  results; the timely receipt of required permits for the Gold Springs project; the continuing  support  for  mining  by  local  governments  in  Nevada  and  Utah;  the  availability  of  equipment and qualified personnel to advance the Gold Springs project; execution of the  Company’s existing plans and further exploration and development programs for Gold  Spring,  which  may  change  due  to  changes  in  the  views  of  the  Company  or  if  new  information arises which makes it prudent to change such plans or programs; efficiency of  the markets in factoring developments at the Gold Springs into its common share price  and the assumptions and estimates disclosed in the Preliminary Economic Assessment on  the Gold Springs Property, Utah/Nevada, USA dated April 30, 2014, authored by Lane and  Associates and Kurt Katsura.  

Readers are cautioned not to place undue reliance on the forward‐looking statements  contained in this press release. Except as required by law, TMI assumes no obligation to  update or revise any forward‐looking statement, whether as a result of new information,  future  events  or  any  other  reason.  Unless  otherwise  indicated,  forward‐looking  statements in this press release describe the Company’s expectations as of May 1, 2014. 

Readers are also cautioned that the PEA is preliminary in nature and includes inferred  mineral resources that are considered too speculative geologically to have the economic  considerations  applied  to  them  that  would  enable  them  to  be categorized  as  mineral  reserves and there is no certainty that the results indicated in the PEA will be realized.   Mineral resources that are not mineral reserves do not have economic viability.