Graphite One Increases Tonnage, Grade and Contained Graphite of Measured and Indicated, and Inferred Resources in Updated Miner Al Resource Estimate Measured and Indicated Resources: 10.95 mt Grading 7.8% Cg at 5% Cg Cut‐off Grade

Resource Estimates Technical Reports (NI 43-101)

MEASURED and INDICATED RESOURCES:  10.95 Mt Grading 7.8% Cg at 5% Cg Cut‐Off Grade  14% Increase in Contained Graphite Over 2017 PEA

INFERRED RESOURCES:  91.89 Mt Grading 8.0% Cg at 5% Cg Cut‐Off Grade 

March  26,  2019  –  Vancouver,  British  Columbia  –  Graphite  One  Inc.  (GPH:  TSX‐V;  GPHOF:  OTCQB)  (“Graphite  One”  or  the  “Company”)  is  pleased  to  announce  the  completion  of  an  updated  mineral resource estimate for its Graphite Creek Project of 1.69 million tonnes (“Mt”) Measured, grading 8.0% graphitic carbon (“Cg”); 9.26 Mt Indicated, grading 7.7% Cg; and, 91.89 Mt Inferred, with 8.0% Cg, all using a 5% Cg cut‐off grade.  The results from the drill program completed during the 2018 field program moved from Indicated to Measured Resource status a portion of the previously released resource estimate set forth in the NI 43‐101 Preliminary Economic Analysis on the Graphite One Project dated June 30, 2017 and filed July 12, 2017 (“PEA”).

Table 1: Resource Estimate Comparison: March 2019 Update to PEA
MINERAL RESOURCE CLASSIFICATIONResource ReportTONNAGE (MILLION TONNES)GRAPHITE GRADE (% Cg)CONTAINED GRAPHITE (TONNES)
March 2019 Results 91.89 8.0% 7,342,883 Inferred Change from PEA 29% 14% 48%
March 2019 Results 9.26 7.7% 715,363 Indicated Change from PEA ‐10% 7% ‐4%
March 2019 Results 1.69 8.0% 135,171 Measured Change from PEA n/a n/a n/a

March 2019 Results 10.95 7.8% 850,534 Measured + Indicated Change from PEA 6% 8% 14% Note: Cut‐off Grades for March 2019 Update at 5%; PEA at 6%

“This increase in resources demonstrates the potential for a robust, high‐grade US Graphite project,” said Anthony Huston, Graphite One President and CEO.  “Having these results in hand as we commence our Pre‐Feasibility work will help us refine our mine design and knowledge of recovery, size distribution and the unique qualities of our graphite mineralization as highlighted in the PEA.”

The U.S. Government has placed graphite on its Critical Minerals List of materials critical to “the national economy and national security of the United States”.1   There is currently no U.S. graphite production.

1Page J5; Schulz, K.J., DeYoung, J.H., Jr., Seal, R.R., II, and Bradley, D.C., eds., 2017, Critical mineral resources of the United States—Economic and environmental geology and prospects for future supply: U.S. Geological Survey Professional Paper 1802, 797 p., https://pubs.er.usgs.gov/publication/pp1802 .

“Graphite Creek continues to show potential to be a significant domestic source of critical materials for electric vehicle batteries, power storage and various other critical and strategic end uses,” Mr. Huston added.  “With the rapid rise in graphite demand associated with renewable energy applications, and the proliferation  of  EV  battery  and  energy  storage  manufacturing,  we  believe  Graphite  One  could  be  an important part of this new energy supply chain.”

The Graphite Creek Project is a large‐flake graphite deposit located in the Kigluaik Mountains on the Seward Peninsula approximately 60 km north of the City of Nome, Alaska.

Highlights of the Updated Mineral Resource Estimate (5% Cut‐off Grade): 

The following are the highlights of the updated resource estimate as compared to the estimate reported in the PEA.

  • Infill drilling results from 2018 and a more detailed block model have elevated a portion of the resource to Measured Resources, totalling 1.69 Mt at 8.0% Cg and 0.14 Mt of contained graphite.
  • Total Measured and Indicated Resources are 10.95 Mt at 7.8% Cg with 0.85 Mt of contained graphite.  This represents a 6% increase in tonnage, an 8% improvement in grade and a 14% increase in contained graphite when compared to the PEA’s Indicated Resource results.
  • Inferred  Resources  totalled  91.89  Mt  at  8.0%  Cg  with  7.3  Mt  of  contained  graphite.    This represents an increase in tonnage, grade and contained graphite when compared to the PEA’s Inferred Resources and supports the potential of a long‐term mine life described by the PEA.
  • High‐grade graphite mineralization is present at the surface and has been extended to depths of over 200 m by drilling.
  • The deposit remains open along strike in both the east and west directions, as well as down dip.
  • The updated resource estimate provides direction for continued drilling which is expected to form the basis for a pre‐feasibility study, the next phase for the Project.

Updated Mineral Resource Estimate for the Graphite Creek Project 

The updated mineral resource estimate for the Graphite Creek Project is summarized in Table 2 and compared to the previous mineral resource estimate reported in the PEA.

The PEA presented a cut‐off grade of 6.0% Cg “as it would produce mill feed grading 7% percent Cg.  This has  been  determined  to  be  the  minimum  grade  required  to  support  economically  viable  graphite production in western Alaska.”2  With this guidance, a cut‐off grade of 5.0% Cg for the updated resource estimate was selected as it resulted in Cg grades in excess of 7% in all resource categories.  The selected cut‐off grades in each case are highlighted in Table 2.

2 Page 14‐7; NI 43‐101 Preliminary Economic Analysis on the Graphite One Project; dated June 30, 2017 and filed July 12, 2017; Prepared by TRU Group

Table 2: Comparison of Estimated Resources ‐ March 2019 Resource Update to PEA Dated June 30, 2017
Graphite Creek Resource Estimate Update: March 2019PEA June 30, 2017

MINERAL  CUT‐OFF  TONNAGE  GRAPHITE  CONTAINED  CUT‐OFF  TONNAGE  GRAPHITE  CONTAINED  MINERAL  RESOURCE  GRADE     (MILLION  GRADE     GRAPHITE  GRADE     (MILLION  GRADE      GRAPHITE  RESOURCE  CLASSIFICATION (% Cg) TONNES) (% Cg) (TONNES) (% Cg) TONNES) (% Cg) (TONNES) CLASSIFICATION

IN FER RED4.0125.487.1%8,850,296
5.091.898.0%7,342,883
6.065.949.0%5,922,778
7.044.0110.2%4,504,835
8.029.7711.6%3,440,831
4.0121.626.2%7,591,000IN FER RED
5.0105.816.5%6,881,000
6.071.247.0%4,969,000
7.022.248.2%1,823,000
8.08.799.3%817,000
IN D ICATED4.012.576.9%864,110
5.09.267.7%715,363
6.06.458.7%561,470
7.04.329.8%423,790
8.02.8011.1%309,862
4.017.346.4%1,111,000IN D ICA TED
5.015.106.7%1,009,000
6.010.327.2%744,000
7.04.468.2%367,000
8.02.079.1%189,000
M EA SU R ED4.02.197.2%157,634
5.01.698.0%135,171
6.01.229.0%109,456
7.00.8410.1%84,904
8.00.5711.3%64,825
4.00.000.0%0M EA SU R ED
5.00.000.0%0
6.00.000.0%0
7.00.000.0%0
8.00.000.0%0
M EA SU IN D D ICR + AE TE D4.014.766.9%1,021,744
5.010.957.8%850,534
6.07.678.8%670,926
7.05.169.9%508,694
8.03.3711.1%374,687
4.017.346.4%1,111,000M EA SU IN D D ICR + AE TE D
5.015.106.7%1,009,000
6.010.327.2%744,000
7.04.468.2%367,000
8.02.079.1%189,000

Notes to the Mineral Resource Estimate:

1.     Mineral resources are not mineral reserves and do not have demonstrated economic viability. There is no guarantee that all or any part of the indicated or inferred mineral resource will be converted into a mineral reserve. The collective work to date from the Graphite Creek Property indicates that while the project is in early stages of exploration/resource work that indications of the size and grade of the graphite give suggestions that they are of high enough concentration to be of economic interest.

2.     Values in the tables have been rounded. Totals may not tally due to rounding.

Resource Estimate Details 

The Measured and Indicated Resource is constrained within a drilled area of approximately 730 m along the northeast striking trend of the graphitic schist, 185 m across the strike to the southeast and 200m below  surface.   Resource  estimation  utilized  56  drill  holes  (totaling  8,387.54m)  that  were  drilled  by Graphite One in 2012, 2013, 2014, and 2018.  The 2018 drill program drilled 801m, successfully tightening up the vertical and lateral drill spacing along 200 m of strike length within the core of the Graphite Creek deposit to bring part of the Indicated Resources to Measure Resources.  The deposit remains open along strike to both the east and west, and down dip.

The graphite deposits occur within distinct geological layers that comprise high‐grade massive to semi‐ massive segregated, and disseminated, large‐flake graphite in sillimanite‐garnet‐biotite‐quartz schist and biotite‐quartz schist (±garnet) host rocks.  The highest in‐situ graphite tonnage occurs in surface/near‐ surface mineralized lodes comprised of sillimanite‐garnet‐biotite‐quartz schist.

Of  the  7,893  assays  in  the  Graphite  One  database,  3,429  assays  were  situated  within  the  updated mineralized lodes.  Upon completion of the compositing process (at two metre intervals), a total of 1,700 composites were used in the estimation process.  Grade was estimated into 2 m (X dimension) x 2 m (Y) x 2 m (Z) blocks, rotated roughly parallel to the strike of mineralization.  Small block sizes were used to more accurately  follow  the  shape  of  mineralization  lodes  and  be  more  similar  to  future  mining methods.  Variography was used to help aid the search ellipsoid ranges used in the estimation.  After a first pass box search of 1 m x 1 m x 1 m, a multi‐pass approach was used with increasing search ellipsoid ranges.  Incremental search ellipsoid range was from 45 m x 22 m x 8 m to 1,500 m x 500 m x 500 m with the orientation tailored to each lode.   Estimation was completed using the inverse distance squared interpolation process. Density values were composited at 2‐meter intervals for a total of 3,777 density values.   Density  was  estimated  for  each  individual  block  throughout  the  block  model  regardless  of mineralized lode using similar search ranges as graphite.

The mineral resource estimate was prepared by Chris Valorose, M.Sc., MAusIMM of Valorose Consulting, Inc.

Mr.  William  Ellis,  P.  Geo,  with  Alaska  Earth  Sciences,  Inc.  provided  oversite  to  the  2018  drilling  and sampling program.  Mr. Ellis is a “Qualified Person” under NI 43‐101 and has reviewed and approved the technical content of this news release.

A technical report describing the 2018 drill program and Graphite Creek resource updated estimate will be filed on the Company’s website and on SEDAR within 45 days.

About Graphite One’s QA/QC Program 

Graphite One maintains a rigorous quality assurance/quality control (“QA/QC”) program with respect to the preparation, shipping, analysis and checking of all samples and data from the properties.  Quality control for drill programs at the Company's project covers the complete chain of custody of samples, including  verification  of  drill  hole  locations  (collar  surveys  and  down‐hole  directional  surveys),  core handling procedures (logging, sampling, sample shipping) and analytical‐related work, including duplicate sampling, "check analyses" at other laboratories and the insertion of standard and blank materials.  The QA/QC program also includes data verification procedures.

Sample preparation and primary analysis for the Graphite Creek project is done by Activation Laboratories Ltd (“Act Labs”).  Act Labs uses standard quality assurance and control policies in all aspects of laboratory operations.  All samples are assayed for Cg.  The technique used for determining Cg is by LECO whereby the pulp is either digested with hydrochloric and perchloric acids or subjected to a multistage furnace treatment to remove all forms of carbon with the exception of Cg.

As part of the comprehensive QA/QC program, one standard or blank was inserted into the assay stream for every 10 core samples submitted.  Blanks were inserted directly after highly mineralized samples to test for contamination during the preparation.  Three separate commercially available graphite standard materials were utilized in 2018.  These standards are an additional check on the internal standards utilized by Act Labs.

About Graphite One Inc. 

GRAPHITE ONE INC. (GPH: TSX‐V; GPHOF: OTCQB) continues to develop its Graphite One Project (the “Project”), whereby the Company could potentially become an American producer of high grade Coated Spherical Graphite (“CSG”) that is integrated with a domestic graphite resource.  The Project is proposed as a vertically integrated enterprise to mine, process and manufacture high grade CSG primarily for the lithium‐ion  electric  vehicle  battery  market.    As  set  forth  in  the  Company’s  Preliminary  Economic Assessment, potential graphite mineralization mined from the Company’s Graphite Creek Property, is expected to be processed into concentrate at a graphite processing plant.  The proposed processing plant would be located on the Graphite Creek Property situated on the Seward Peninsula about 60 kilometers north of Nome, Alaska.  CSG and other value‐added graphite products, would likely be manufactured from the concentrate at the Company’s proposed graphite product manufacturing facility, the location of which is the subject of further study and analysis.  The Company intends to make a production decision on the Project once a feasibility study is completed.

ON BEHALF OF THE BOARD OF DIRECTORS  

"Anthony Huston” (signed)

For more information on Graphite One Inc. please visit the Company’s website, www.GraphiteOneInc.com or contact:

Anthony Huston  Investor Relations Contact CEO, President & Director  1‐604‐684‐6730 Tel: (604) 697‐2862  [email protected] Email: [email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This  release  includes  certain  statements  that  may  be  deemed  to  be  forward‐looking  statements.  All statements in this release, other than statements of historical facts, are forward‐looking statements.

Generally, forward‐looking information can be identified by the use of forward‐looking terminology such as “proposes”, “expects”, or “is expected”, “scheduled”, “estimates”, “projects”, “intends”, “assumes”, “believes”, “indicates” or variations of such words and phrases that state that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved”.

This release includes certain statements that may be deemed to be forward‐looking statements.  All statements in this release, other than statements of historical facts that address timing of receipt of regulatory approvals, exploration drilling, exploitation activities and events or developments that the Company expects, are forward‐looking statements.  Forward‐looking information in this press release includes  statements  about  inferred  resource  estimates  for  the  Graphite  Creek  Project,  the  potential existence and size of mineralization within the Graphite Creek Project; estimated timing and amount of future  expenditures,  recommendations  for  future  work  on  the  Graphite  Creek  Project,  geological interpretations  and  statements  about  Graphite  One’s  strategy,  future  operations  and  prospects. Information concerning inferred mineral resource estimates also may be deemed to be forward‐looking information in that it reflects a prediction of the mineralization that would be encountered if a mineral deposit were developed and mined.  Although the Company believes the expectations expressed in such forward‐looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward‐ looking statements.

Factors  that  could  cause  actual  results  to  differ  materially  from  those  in  forward‐looking  statements include market prices, exploitation and exploration successes, continuity of mineralization, uncertainties related  to  the  ability  to  obtain  necessary  permits,  licenses  and  title  and  delays  due  to  third  party opposition,  changes  in  government  policies  regarding  mining  and  natural  resource  exploration  and exploitation, and continued availability of capital and financing, and general economic, market or business conditions.

Readers are cautioned not to place undue reliance on this forward‐looking information, which is given as of the date that is expressed in this news release, and the Company undertakes no obligation to update publicly or revise any forward‐looking information, except as required by applicable securities laws. For more information on the Company, investors should review the Company's continuous disclosure filings that are available at www.sedar.com.

The mineral resource estimates reported in this press release were prepared in accordance with National Instrument 43‐101 Standards of Disclosure for Mineral Projects (“NI 43‐101”), as required by Canadian securities regulatory authorities. For United States reporting purposes, the United States Securities and Exchange  Commission  (“SEC”)  applies  different  standards  in  the  classification  of  mineralization.  In particular,  while  the  terms  “measured,”  “indicated”  and  “inferred”  mineral  resources  are  required pursuant to NI 43‐101, the SEC does not recognize such terms.  Canadian standards differ significantly from the requirements of the SEC.  Investors are cautioned not to assume that any part or all of the mineral  deposits  in  these  categories  constitute  or  will  ever  be  converted  into  reserves.    In  addition, “inferred”  mineral  resources  have  a  great  amount  of  uncertainty  as  to  their  existence  and  great uncertainty as to their economic and legal feasibility.  It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category.