Thursday, October 22, 2026
MiningNewsTerminal
Thursday, October 22, 2026 Admin

ERDA.V ·

Fancamp Receives NI 43-101 Resource Estimate for Its 46.72% Owned Magpie Deposit

Resource Estimates

FANCAMP EXPLORATION LTD.

7290 Gray Avenue, Burnaby, British Columbia, V5J 3Z2 Telephone: 604-434-8829 Facsimile: 604-434-8823 Web site: www.fancampexplorationltd.ca

NEWS RELEASE

FANCAMP RECEIVES NI 43-101 RESOURCE ESTIMATE FOR ITS 46.72% OWNED MAGPIE DEPOSIT

April 18, 2012 TSX Trading Symbol: FNC S.E.C. Exemption: 12(g)3-2(b)

Fancamp Exploration Ltd. (TSX Venture Exchange – FNC) is pleased to report the receipt of an NI 43-101 in pit mineral resource estimate prepared by P&E Mining Consultants Inc. (P&E) of Brampton, Ontario, on the Magpie #2 Deposit at its 46.72% owned Magpie Iron-Titanium Property with the following results:

Magpie #2 Deposit In Pit Resource at 15% FeT (Total Iron) Cut‐Off (1)(2)(3)(4)

ClassificationTonnes (M)FeT %Fe O % 2 3TiO % 2Cr O % 2 3V O % 2 5Al O 2 3
Indicated635.242.4960.7811.202.610.3010.56
Inferred293.242.2960.4911.212.540.3210.82

1. The  current  Mineral  Resource  estimates  were  calculated  using  the  Canadian  Institute  of  Mining,  Metallurgy  and  Petroleum  (CIM), CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines prepared by the CIM Standing Committee  on Reserve Definitions. 

2. Mineral resources, which are not mineral reserves, do not have demonstrated economic viability. The mineral resource estimate  may  be  materially  affected  by  environmental,  permitting,  legal,  title,  taxation,  socio‐political,  marketing,  or  other  relevant  issues. 

3. The quantity and grade of estimated Inferred Resource reported herein are uncertain and there has been insufficient exploration  to categorize them as an Indicated or Measured Resource. It is uncertain if further exploration will result in reclassification of  Inferred Mineral Resources to the Indicated or Measured Mineral Resource categories. 

4. P&E utilized a $1.00 Cdn/US exchange rate, a mining cost of C$1.90/tonne and C$9.50/tonne for the processing, G&A, and  freight costs. The process recovery, estimated to be 82%, and an Iron ore price of US$1.85/dmtu were used to complete the  Whittle pit optimization with 50 degree overall slopes to estimate the in‐situ Mineral Resources. 

Magpie In Pit Mineral Resources Estimates Sensitivity

INDICATED MINERAL RESOURCES
FeTVOLUMEDENSITYTONNAGEFeTFeO 2 3TiO 2CrO 2 3VO 2 5AlO 2 3
Cut‐Offm3t/m3Tonnes%%%%%%
20%137,613,3954.61634,218,02242.5260.8311.212.610.3010.57
19%137,722,9564.61634,527,44242.5160.8211.202.610.3010.57
18%137,825,4474.61634,814,52042.5060.8011.202.610.3010.57
17%137,870,2704.61634,940,06842.5060.8011.202.610.3010.57
16%137,913,6884.61635,061,68142.4960.7911.202.610.3010.56
15%137,953,9584.60635,174,47842.4960.7811.202.610.3010.56
14%137,989,7134.60635,274,62742.4860.7811.202.610.3010.56
13%138,020,9134.60635,362,01842.4860.7711.192.610.3010.56
12%138,047,3134.60635,435,96542.4760.7611.192.610.3010.56
11%138,065,9034.60635,488,03442.4760.7611.192.610.3010.56
10%138,088,0764.60635,550,14342.4760.7611.192.610.3010.56
INFERRED MINERAL RESOURCES
FeTVOLUMEDENSITYTONNAGEFeTFeO 2 3TiO 2CrO 2 3VO 2 5AlO 2 3
Cut‐Offm3t/m3Tonnes%%%%%%
20%63,688,6084.60293,057,30842.3060.5111.222.540.3210.82
19%63,714,5034.60293,130,57342.2960.5011.212.540.3210.82
18%63,720,9804.60293,148,71542.2960.5011.212.540.3210.82
17%63,731,4364.60293,178,00142.2960.5011.212.540.3210.82
16%63,740,4154.60293,203,15342.2960.5011.212.540.3210.82
15%63,740,8574.60293,204,38842.2960.4911.212.540.3210.82
14%63,745,0534.60293,216,14142.2860.4911.212.540.3210.82
13%63,750,7784.60293,232,17742.2860.4911.212.540.3210.82
12%63,750,7784.60293,232,17742.2860.4911.212.540.3210.82
11%63,755,5784.60293,245,62242.2860.4911.212.540.3210.82
10%63,757,9784.60293,252,34442.2860.4911.212.540.3210.82

The results of 34 drill holes over a 3.4 km strike length show the remarkable homogeneity of the Magpie Number 2 Deposit. Inverse distance squared (1/d2) grade interpolation was undertaken on 5 metre composites in constraining wireframes.

The Magpie #1 and #3 Occurrences, with their non NI 43-101 compliant historical resources of Proven and Probable Mineral Reserves of 89.2 million tonnes of 43.7% FeT (62.5% Fe2O3), 10.0% Ti02 and 1.3% Cr2O3, and 86.6 million tonnes of 40.7% FeT (58.2% Fe2O3), 10.3% TiO2 and 3.7% Cr2O3,respectively, are not as yet included.    Historical mineral reserves are non- compliant to NI 43-101 Mineral Reserves and Mineral Resources standards and therefore should not be relied upon. A Qualified Person has not done any work on the historical numbers to qualify them as current Mineral Resources. There is not sufficient exploration and/or development work at this time to indicate if these numbers or parts thereof will ever be qualified as current Mineral Resources.

A third drill program is planned, following the Initial Public Offering (“IPO”) to bring the Magpie #1 and #3 Occurrences to current NI 43-101 Mineral Resources standards. In addition, the NI 43-101 Mineral Resources estimates of the Magpie #2 Occurrence, will be upgraded to a higher quality Mineral Resources classification, together with further testing for depth extensions which are currently open.

Hydrometallurgical test work on the Magpie mineralization continues at SGS Lakefield, while beneficiation tests continue at COREM facilities in Quebec City for the objective of achieving optimal concentrate products suitable for smelting purposes.

The technical information in this news release was reviewed and approved by Qualified Persons Eugene Puritch, P. Eng., and Antoine Yassa, P. Geo., of P&E. A technical report to support this news release will be filed on SEDAR within 45 days.

ON BEHALF OF THE BOARD

“Peter H. Smith”, PhD., P.Eng., President

For further information, contact: Peter H. Smith, Ph.D., P.Eng., President, at 514-481-3172 or Michael D’Amico, Bay Street Connect Investor Relations at 647-500-6023 ([email protected])

No stock exchange or securities regulatory authority has reviewed or accepted responsibility for the adequacy or accuracy of this release. Some of the statements contained in this release are forward-looking statements, such as estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Since forward-looking statements address future events and conditions, by their very nature, they involve inherent risks and uncertainties.