Sunday, October 18, 2026
MiningNewsTerminal
Sunday, October 18, 2026 Admin

CIO.V ·

Drilling Results Finalised

Drill Results Resource Estimates Exploration Programs

ABN: 32 072 871 133

Central Iron Ore Limited

Suite 1, Level 2, 49-51 York Street, Sydney NSW Australia 2000 Tel. +61 2 9397 7521

NEWS RELEASE Symbol: CIO-TSXV

September 18, 2024 For Immediate Dissemination

Drilling Results Finalised

VANCOUVER, BRITISH COLUMBIA – (Marketwire – September 18, 2024), Central Iron Ore Limited (CIO

  • TSX.V) (“CIO” or “the Company”) is pleased to announce this Drilling Update.

Central Iron Ore is pleased to announce that the results for the 2024 Phase 1 RC drilling campaign have been finalised.

Figure 1. The sun sets after the first day's drilling of the 2024 Phase 1 RC campaign at British King (M37/30)

Highlights:

  • Assay results for the 75-hole, 5 911-meter 2024 Phase 1 RC program has been received and processed.
  • Multiple significant intercepts exceeding has been intercepted across the target area (Table 1) some notable intercepts include;
    • 24BKRC_004: 5m @ 20.52g/t from 110 meters
    • 24BKRC_007: 3m @ 28.26g/t from 96 meters
    • 24BKRC_010: 2m @ 24.02g/t from 75 meters
    • 24BKRC_015: 3m @ 35.61g/t from 58 meters
    • 24BKRC_028: 7m @ 8.53g/t from 61 meters
    • 24BKRC_017: 2m @ 2.44g/t from 80 meters And: 1m @ 6.24g/t from 84 meters And: 2m @ 26.7g/t from 93 meters
    • 24BKRC_028: 7m @ 8.53g/t from 61 meters
  • Commencing in late September, 321 metres of Diamond Drilling (6 drillholes) will twin selected RC drillholes the showed exceptional gold endowment. The diamond drillhole core will provide invaluable structural, mineralogical and metallurgical information
  • The British King Mineral Resource is currently being updated to include the results of the recent drilling

Drilling Results

Interpretation of the RC drilling assay results has confirmed high grade gold mineralisation across the prospect area (Figure 3). A clear geological understanding of the ore body has been developed with gold mineralisation associated with a primary laminated bucky quartz lode with continuity for the entire 840m of strike targeted by the drilling campaign (Figure 3 to Figure 6). Mineralisation is open down dip and along strike.

Figure 2. Section plan for the 2024 Phase 1 and historical drilling

Figure 3. Pierce Point Long section of the 2024 RC results

Figure 4. Section A-A': multiple significant high grade intercepts across multiple auriferous lodes have been identified

Figure 5. Section B-B': multiple significant high grade intercepts have been identified

Figure 6. Section C-C': multiple significant high grade intercepts across multiple auriferous lodes have been identified

Table 1. Significant Intercepts for the 2024 Phase 1 RC Campaign

Collar PositionSignificant Mineralised Intercepts
TargetHole IDHoleDipAziComments
DepthAvg. Grade
EastingNorthingARLFromToIntervalMetal (g*m)
(Au g/t)
British King - M37/3024BKRC 001 _58-603576908256326841445464711.291.291m @ 1.29g/t from 46 meters
and515327.1314.262m @ 7.13g/t from 51 meters
24BKRC 002 _86-603576908239326842445647061.307.806m @ 1.3g/t from 64 meters
24BKRC 003 _19-603576908218326841445-----NSI - abandoned before lode intercepted
24BKRC 004 _118-603576908198326840445110115520.52102.605m @ 20.52g/t from 110 meters
inc.110112248.0096.002m @ 48g/t from 110 meters
24BKRC 005 _60-603576908256326860445565935.5116.533m @ 5.51g/t from 56 meters
inc.5657111.5511.551m @ 11.55g/t from 56 meters
24BKRC 006 _89-603576908239326860445717436.3619.083m @ 6.36g/t from 71 meters
inc.7172111.7011.701m @ 11.7g/t from 71 meters
24BKRC 007 _110-6035769082173268604459699328.2684.783m @ 28.26g/t from 96 meters
inc.9698240.2080.402m @ 40.2g/t from 96 meters
24BKRC 008 _119-60357690819732685944511211316.036.031m @ 6.03g/t from 112 meters
24BKRC 009 _60-603576908256326877445495018.358.351m @ 8.35g/t from 49 meters
24BKRC 010 _85-6035769082413268774457577224.0248.042m @ 24.02g/t from 75 meters
inc.7677145.6045.601m @ 45.6g/t from 76 meters
24BKRC 011 _110-6035769082203268754459094412.8751.484m @ 12.87g/t from 90 meters
inc.9092224.9449.882m @ 24.94g/t from 90 meters
24BKRC 012 _104-603576908237326896445777928.6517.302m @ 8.65g/t from 77 meters
inc.7778116.2516.251m @ 16.25g/t from 77 meters
24BKRC 013 _110-6035769082203268964459496215.4430.882m @ 15.44g/t from 94 meters
inc.9495128.0028.001m @ 28g/t from 94 meters
24BKRC 014 _131-60357690820232689744510911011.271.271m @ 1.27g/t from 109 meters
and11411514.174.171m @ 4.17g/t from 114 meters
24BKRC 015 _83-603576908260326917445505111.431.431m @ 1.43g/t from 50 meters
and5861335.61106.833m @ 35.61g/t from 58 meters
inc.59601100.00100.001m @ 100g/t from 59 meters
24BKRC 016 _90-603576908239326916445686915.995.991m @ 5.99g/t from 68 meters
and7779224.9549.902m @ 24.95g/t from 77 meters
inc.7778148.3048.301m @ 48.3g/t from 77 meters
and8790315.1945.573m @ 15.19g/t from 87 meters
inc.8788137.2037.201m @ 37.2g/t from 87 meters
24BKRC 017 _107-603576908220326915445808222.444.882m @ 2.44g/t from 80 meters
and848516.246.241m @ 6.24g/t from 84 meters
and9395226.7053.402m @ 26.7g/t from 93 meters
and969822.094.182m @ 2.09g/t from 96 meters
24BKRC 018 _134-60357690820032691744510510618.868.861m @ 8.86g/t from 105 meters
and11411731.163.483m @ 1.16g/t from 114 meters
24BKRC 019 _66-603576908277326939445363826.6213.242m @ 6.62g/t from 36 meters
and626313.503.501m @ 3.5g/t from 62 meters
Collar PositionSignificant Mineralised Intercepts
TargetHole IDHoleDipAziComments
DepthAvg. Grade
EastingNorthingARLFromToIntervalMetal (g*m)
(Au g/t)
24BKRC 020 _86-603576908258326939445566042.6310.524m @ 2.63g/t from 56 meters
and768041.345.364m @ 1.34g/t from 76 meters
24BKRC 021 _90-603576908240326940445697453.5617.805m @ 3.56g/t from 69 meters
24BKRC 023 _128-60357690820032693844510911343.4113.644m @ 3.41g/t from 109 meters
12212316.166.161m @ 6.16g/t from 122 meters
24BKRC 024 _80-6035769082583269574455456213.9827.962m @ 13.98g/t from 54 meters
and737639.4728.413m @ 9.47g/t from 73 meters
inc.7374133.0033.001m @ 33g/t from 73 meters
24BKRC 025 _98-603576908239326957445747736.4519.353m @ 6.45g/t from 74 meters
and909224.078.142m @ 4.07g/t from 90 meters
24BKRC 026 _78-603576908260326976445535636.9720.913m @ 6.97g/t from 53 meters
24BKRC 027 _83-603576908239326978445787911.761.76Abandoned - flooded stoping intersected. 79m to 82m
24BKRC 028 _80-603576908259326997445616878.5359.717m @ 8.53g/t from 61 meters
inc.6162149.2049.201m @ 49.2g/t from 61 meters
and727313.073.071m @ 3.07g/t from 72 meters
24BKRC 029 _80-603576908276327179445-----NSI
24BKRC 030 _74-603576908276327195445515213.733.731m @ 3.73g/t from 51 meters
24BKRC 031 _95-603576908256327199445868930.752.253m @ 0.75g/t from 86 meters
24BKRC 032 _74-60357690829832722444500.000m @ g/t from meters
24BKRC 033 _95-603576908256327218445888910.890.891m @ 0.89g/t from 88 meters
24BKRC 034 _77-603576908275327240445707222.024.042m @ 2.02g/t from 70 meters
24BKRC 035 _95-603576908256327241445858611.091.091m @ 1.09g/t from 85 meters
24BKRC 040 _69-603576908256327021445-----NSI, Abandoned - flooded stoping intersected. 69m
24BKRC 045 _98-603576908238327060445969821.603.20Abandoned after lode intersected
24BKRC 049 _104-603576908238327101445959619.519.511m @ 9.51g/t from 95 meters
24BKRC 058 _110-603576908239327181445-----NSI
24BKRC 062 _65-603576908238327219445-----NSI, abandoned before lode intercepted
British King Extension - M37/63124BKERC 001 _36-603576908219326735444252722.314.622m @ 2.31g/t from 25 meters
24BKERC 002 _56-603576908200326736445464711.051.051m @ 1.05g/t from 46 meters
24BKERC 003 _30-6035769082393267554452022211.7223.442m @ 11.72g/t from 20 meters
inc.2021121.4021.401m @ 21.4g/t from 20 meters
24BKERC 004 _53-603576908219326755445444512.562.561m @ 2.56g/t from 44 meters
24BKERC 005 _35-603576908259326776445181913.393.391m @ 3.39g/t from 18 meters
24BKERC 006 _53-603576908240326776445364041.696.764m @ 1.69g/t from 36 meters
24BKERC 007 _89-603576908202326778445666824.018.022m @ 4.01g/t from 66 meters
and747624.559.102m @ 4.55g/t from 74 meters
24BKERC 008 _44-603576908258326795445333634.8414.523m @ 4.84g/t from 33 meters
inc.3435111.3511.351m @ 11.35g/t from 34 meters
24BKERC 009 _60-603576908239326796445505113.543.541m @ 3.54g/t from 50 meters
24BKERC 010 _80-603576908220326797445686917.697.691m @ 7.69g/t from 68 meters
24BKERC 011 _47-603576908259326815445273031.193.573m @ 1.19g/t from 27 meters
and404222.134.262m @ 2.13g/t from 40 meters
Collar PositionSignificant Mineralised Intercepts
TargetHole IDHoleDipAziComments
DepthAvg. Grade
EastingNorthingARLFromToIntervalMetal (g*m)
(Au g/t)
24BKERC 012 _65-603576908287327252445-----NSI
24BKERC 013 _65-603576908289327272445585913.133.131m @ 3.13g/t from 58 meters
24BKERC 014 _89-603576908267327272445737633.9611.883m @ 3.96g/t from 73 meters
24BKERC 015 _65-603576908289327291445585913.023.021m @ 3.02g/t from 58 meters
24BKERC 039 _89-603576908268327293445717432.026.063m @ 2.02g/t from 71 meters
24BKERC 016 _68-603576908283327331445626421.082.162m @ 1.08g/t from 62 meters
24BKERC 018 _71-603576908288327351445-----NSI
24BKERC 019 _68-603576908286327370445-----NSI
24BKERC 020 _89-603576908267327371445727431.845.523m @ 1.84g/t from 72 meters
24BKERC 021 _65-603576908287327389445606221.272.542m @ 1.27g/t from 60 meters
24BKERC 022 _68-603576908288327408446596012.852.851m @ 2.85g/t from 59 meters
24BKERC 023 _83-603576908270327433446737419.289.281m @ 9.28g/t from 73 meters
24BKERC 024 _54-603576908287327452446-----NSI, abandoned before lode intercepted
24BKERC 025 _62-603576908266327453446-----NSI, abandoned before lode intercepted
24BKERC 026 _74-603576908285327479446676812.332.331m @ 2.33g/t from 67 meters
24BKERC 027 _68-603576908289327496446525313.003.001m @ 3g/t from 52 meters
24BKERC 028 _89-603576908268327495446-----NSI
24BKERC 029 _56-603576908308327514446353612.092.091m @ 2.09g/t from 35 meters
and4041110.4510.451m @ 10.45g/t from 40 meters
24BKERC 030 _68-6035769082863275144465960153.3053.301m @ 53.3g/t from 59 meters
24BKERC 031 _89-603576908265327534446778036.3419.023m @ 6.34g/t from 77 meters
inc.7980117.4517.451m @ 17.45g/t from 79 meters
24BKERC 032 _74-603576908284327553446-----NSI
24BKERC 033 _74-603576908286327573446525311.161.161m @ 1.16g/t from 52 meters
and575815.035.031m @ 5.03g/t from 57 meters
24BKERC 034 _68-603576908220326776445575814.494.491m @ 4.49g/t from 57 meters
24BKERC 036 _86-6035769082213268154457577212.7025.402m @ 12.7g/t from 75 meters
24BKERC 039 _89-603576908268327293445717432.026.063m @ 2.02g/t from 71 meters
24BKERC 044 _83-603576908266327389446737411.681.681m @ 1.68g/t from 73 meters

Diamond Drilling Commencing Soon

Twinning diamond drilling of 6 selected high-grade interceptions will commence towards end September 2024 to obtain large volume, representative samples for structural, metallurgical and petrographic test work.

British King Resource Update

The British King Mineral Resource is currently being updated to include the results of the recent RC drilling. The Company’s 100% owned British King Mine Area has a NI43-101 Inferred Mineral Resource of 105,000 tonnes at 6.35 g/t Au for a total of 22,400 ounces.

The British King Extensions, 100% owned by the South Darlot Joint Venture in which the Company owns a 70% interest, has an NI43-101 Inferred Resource 71,000 tonnes at 5.64 g/t Au for 12,830 ounces at a gold price of $AUD 3,000/ounce. Both Inferred Resources have a top cut of 35 g/t Au (as per NI 43-101 report dated 18/5/2023 entitled “NI43-101 Technical Report South Darlot Gold Project Updated for the 2022-2023 Exploration Western Australia”).

Figure 7. British King Mine Area and Extensions

British King Project (Western Australia)

The Company’s British King Project is located across the British King Mine situated on the M37/30 Mining Tenement, approximately 320km northwest of Kalgoorlie and 60km east of Leinster in Western Australia (Figure 8).

Figure 8. British King Project Location

QUALIFIED PERSON

Mr Andrew Bewsher who is a Member of the Australian Institute of Geoscientists and has compiled the information within this report relating to the RC drilling programme. Mr Bewsher has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity currently being undertaken to qualify as a Competent Person as defined in NI 43-101.

On behalf of the Board of Directors CENTRAL IRON ORE LIMITED

“David Deitz”

____________________________ David Deitz, Director/CEO

For further information, please contact:

www.centralironorelimited.com

Investor and Media Inquiries:

Direct: +61 2 9397 7521

Email: [email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

THIS NEWS RELEASE IS NOT FOR DISTRIBUTION TO UNITED STATES SERVICES OR FOR DISSEMINATION IN THE UNITED STATES.

Cautionary Note Regarding Forward-Looking Statements

This news release contains forward-looking information within the meaning of Canadian securities laws. Although the Company believes that such information is reasonable, it can give no assurance that such expectations will prove to be correct. Forward-looking information is typically identified by words such as: believe, expect, anticipate, intend, estimate, postulate and similar expressions, or are those, which, by their nature, refer to future events. The Company cautions investors that any forward-looking information provided by the Company is not a guarantee of future results or performance, and that actual results may differ materially from those in forward looking information as a result of various factors, including, but not limited to, the state of the financial markets for the Company’s equity securities, the state of the market for iron ore or other minerals that may be produced generally, recent market volatility; variations in the nature, quality and quantity of any mineral deposits that may be located, the Company's ability to obtain any necessary permits, consents or authorizations required for its activities, to raise the necessary capital or to be fully able to implement its business strategies and other risks associated with the exploration and development of mineral properties. The reader is referred to the Company's disclosure documents for a more complete discussion of such risk factors and their potential effects, copies of which may be accessed through the Company’s page on SEDAR at www.sedar.com.