Thursday, October 22, 2026
MiningNewsTerminal
Thursday, October 22, 2026 Admin

BRAU.V ·

Phase 2 Final Drilling Intersects 8.46 g/t Gold over 3 Metres, Discovers New Vein System in the DAC Deposit, Québec

Drill Results Resource Estimates Exploration Programs

ALTO VENTURES LTD. 910 – 475 Howe Street Vancouver, B.C. V6C 2B3 Tel: 604.689.2599 Fax: 604.689.3609 www.altoventures.com [email protected]

NEWS RELEASE

Phase 2 Final Drilling Intersects 8.46 g/t Gold over 3 Metres,  Discovers New Vein System in the DAC Deposit, Québec 

  • 20.85 g/t gold over 1.1 m intersected within a vein zone averaging 8.46 g/t over 3.0m 
  • An IP anomaly drilled south of the DAC Deposit identified a new target intersecting 

mineralized shear zones 

  • 6.4% zinc over one meter  massive sulphide zone also intersected 

Vancouver, BC, April 12, 2010 – Alto Ventures Ltd. (ATV: TSX‐V) and Pacific North West Capital Corp. (ʺPFNʺ) (TSX: PFN; OTCBB: PAWEF; Frankfurt: P7J) are pleased to provide the results for the last three holes (DES10‐136 to 138) of the Phase 2 drilling program This program was completed in March 2010 at the DAC Deposit on the Destiny Project, Quebec.  The results from the recent Phase 1 and Phase 2 programs are being incorporated into the extensive data base available for the Destiny project for the next stage of work, which may include diamond drilling.

Drilling at the DAC Deposit continued to intersect multiple gold zones with high grade values over significant widths (Table 1) including DES10‐137 which intersected 20.85 g/t gold over 1.1 m within a vein zone that averages 8.46 g/t over 3.0m.  This same hole intersected another gold zone containing 12.0 g/t gold over 0.5 m within a quartz‐veined shear zone averaging 1.16 g/t gold over 6.6 m and a massive sulphide lens assaying 6.4% zinc over 1.0 m.

Table‐1‐ Significant Gold Assays Phase 2 Drilling Program

Hole NumberFrom (m)To (m)Width (m) *downholeAu (g/t)
DES10‐136 includes451.0 460.9463.3 461.512.3 1.60.9 3.95
DES10‐137 includes includes includes216.3 226.8 251.9 254.0 371.0 372.9227.6 227.6 258.5 254.5 374.0 374.011.3 0.8 6.6 0.5 3.0 1.10.92 4.0 1.16 12.0 8.46 20.85
DES10‐138 New vein22.0 91.044.0 92.022.0 1.00.39 2.57

*Based on core angles and previous drilling, true widths are estimated at approximately 80 to 90% of the downhole lengths reported.  Mineralized zones generally start at 0.1 g/t gold and assay averages may include minimal intervals of waste material.  No top cuts of assays were used.

DES10‐137 intersected a one metre wide zone of zinc‐rich massive sulphides that is believed to be part of the same sulphide horizon from which base metal values were reported previously (see Alto and Pacific Northwest news releases dated February 18, 2010).  Company geologists believe that the base metals are indications of an earlier copper‐zinc‐gold massive sulphide system that has been subsequently overprinted by the gold enriched shear zones that are host to the DAC Deposit. Table 2‐ summarizes the significant Base Metals mineralization.

Table 2‐ Summary of Significant Base Metals Mineralization in Massive Sulphide Zone 

Hole NumberFrom (m)To (m)Width (m)Au (g/t)Ag (g/t)Cu (%)Zn (%)
DES10‐137232.7233.71.00.318.00.736.4

Drill hole DES10‐138 was drilled to test an IP geophysical anomaly approximately 100 m south of the DAC Deposit.  The hole hit bedrock at 22 m. A mineralized shear zone averaging 0.39 g/t gold was intersected immediately in the bedrock for 22 meters.  This shear zone is the near‐surface projection of the southern most gold zone of the DAC Deposit.  DES10‐138 intersected other areas of shearing from 89 to 94.4 m where the shear zone contains a one metre wide mineralized quartz vein that assays 2.57 g/t gold. This is a new vein system that is similar in appearance to the high grade quartz veins of the DAC Deposit.  The drill hole continued to cut intermittent shearing and veining from 106 to 152 m and scattered anomalous gold values up to 1.36 g/t gold over 1.3 m are associated with some of the quartz veins.    The hole ended in a gold bearing shear zone with the last sample of the Phase 2 program containing 0.81 g/t gold from 151.2 to 152.0m.

New discovery of quartz veins and shearing throughout DES10‐138 is very significant as it indicates that the previously untested areas are targets with excellent potential for finding additional gold zones at shallow depths just south of the DAC Deposit.

Quality Assurance/ Quality Control 

Core processing included descriptive logging and selection of samples for analyses. The NQ‐size cores were sawed  in  half  and  one  half  was  delivered  to  a  commercial  laboratory.    The  samples  were  delivered  to  the Accurassay preparation laboratory in Sudbury where they were crushed and a 500 gram pulp was prepared. The pulp was then shipped to Accurassay Laboratories in Thunder Bay for analyses. The gold assaying method uses a standard Fire Assay with AA finish technique on a 30 gram aliquot taken from a 500 gram split from the submitted sample.  Commercially prepared standards and blanks were inserted by Alto every 25 samples to ensure  precision  of  the  results.    The  laboratory  performs  repeat  check  assays  every  10  samples  on  pulps  to ensure internal lab quality control.

The laboratory was instructed to prepare and analyze a second 500 gram split from the reject for those samples that indicated gold values of between 1 g/t and 5 g/t on the initial analysis. The gold assaying method on the re‐ split uses a standard Fire Assay with Gravimetric finish technique on a 30 gram aliquot.  Pulp metallic assays were performed on all samples the returned greater than 5 g/t gold on the first assay.  The results reported represent mathematical averages of all analyses performed on each specific sample.

Robert J. Tremblay P. Geo (Quebec), Consulting Geologist to Alto Ventures, was responsible for supervision of the diamond drilling program.

About Destiny Gold Project 

The Destiny Gold Property is under Option to Pacific North West Capital Corp.  Under the terms of the Option Agreement,  Pacific  North  West  Capital  may  elect  to  pay  Alto  $200,000,  provide  Alto  with  250,000  common shares of Pacific North West Capital, and complete a total of $3,500,000 in exploration expenditures over a four year period to earn a 60% interest in the Destiny Gold Property. Subsequent to vesting of its interest, Pacific North West Capital will form a joint venture with Alto to further develop the project.

The property is located approximately 75 km north of Val d’Or in the Abitibi‐Témiscamingue region of Quebec. The geological environment at Destiny including the shear‐hosted high grade quartz veins is similar to the main Val d’Or gold belt.  Val d’Or is one of the major gold mining centres in the Province of Québec, and currently active  with  many  new  mine  development  projects.  The  property  is  road  accessible  with  excellent  mining infrastructure and support facilities nearby.

Mike Koziol, P. Geo., P.Eng. and Alto’s President and CEO is the Qualified Person who has reviewed and approved this news release.

About the DAC Deposit 

The  main area  of  mineralization  on  the  Destiny  Gold  Property is  the  DAC  zone,  which  occurs  over  a  strike length  of  about  600  m.  In  this  area,  four  to  five  identifiable  intervals  of  quartz  veining  and  shear‐related alteration zones carry high grade gold mineralization, with drill intersections up to 178.5 g/t gold over a drill 

width of 1.0 metres.  The DAC zone hosts a NI 43‐101 compliant indicated resource of 166,863 tonnes grading  6.88 g/t gold (36,892 ounces) and an inferred resource of 444,753 tonnes grading 4.46 g/t gold (63,839 ounces)  calculated by W.A. Hubacheck Consultants Ltd. in 2007 (see “A Resource Estimate of the DAC Gold Deposit, Despinassy Twp., Val d’Or, Quebec” dated January 9, 2007, available on the Alto Ventures website).

About Pacific North West Capital Corp: 

Pacific North West Capital Corp. (TSX: PFN; OTCBB: PAWEF; FSE: P7J.F) is a mineral exploration company focused on Platinum Group Metals (PGM), precious and base metals. Managementʹs corporate philosophy is to be a Project Generator, Explorer and Project Operator with the objective of option/joint venturing projects with major and junior mining companies through to production. To that end, Pacific North West Capitalʹs current option/joint ventures agreements are with Anglo Platinum, First Nickel, Fire River Gold Corp. and Alto Ventures.

About Alto Ventures Ltd 

Alto Ventures Ltd. is a gold exploration and development company with a portfolio of highly prospective properties in the Canadian Shield. The Company is currently active in Quebec where it is focussed on the Destiny Gold project in the Abitibi Greenstone Belt and in Ontario in the Beardmore and Shebandowan gold districts.

For more details regarding the Company’s projects, please visit our website at www.altoventures.com.

ON BEHALF OF THE BOARD,

Mike Koziol, P. Geo., P. Eng.

President & CEO

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

For further information contact:

Mark Prosser Investor Relations Manager ALTO VENTURES LTD.

910-475 Howe Street Vancouver, BC, V6C 2B3 Tel: 604-638-3947 Fax: 604-689-3609 Email: [email protected] Website: www.altoventures.com