Thursday, October 22, 2026
MiningNewsTerminal
Thursday, October 22, 2026 Admin

BRAU.V ·

Phase 2 Drilling Commences on the Destiny Gold Project, Québec

Resource Estimates Exploration Programs

ALTO VENTURES LTD.

Vancouver, B.C. V6C 2B3 Tel: 604.689.2599 Fax: 604.689.3609 www.altoventures.com [email protected]

NEWS RELEASE

Phase 2 Drilling Commences on the Destiny Gold Project, Québec 

  • 2000 metre Phase 2 diamond drilling program in progress 
  • DAC Deposit hosts high grade gold mineralization in quartz veins within multiple zones 

of wide alteration 

  • NI 43‐101 compliant indicated resource of 166,863 tonnes grading 6.88 grams per tonne (g/t) 

gold and an inferred resource of 444,753 tonnes grading 4.46 g/t gold 

  • Open along strike and at depth

January 27th, 2010  Vancouver, BC – Alto Ventures Ltd. (ATV: TSX‐V) and Pacific North West Capital Corp. (PFN) (TSX: PFN; OTCBB: PAWEF; Frankfurt: P7J) are pleased to announce that the Phase 2 diamond drilling program has commenced at the DAC Deposit on the Destiny Gold Project.  The Phase 2 program will consist of approximately 2,000 m of diamond drilling to follow up positive results from the Phase 1 program that was completed in December 2009.  Results from the last six holes of the Phase 1 program will be released as they become available.

Results from the first eight of 14 holes completed during the Phase 1 program returned high grade values up to 44.39 g/t gold (1.29 ounces/ton) over 0.5m.  The high grade quartz veins occur within multiple zones of wide shear‐related  alteration  systems  which  carry  gold  values  of  interest  including  21.0m  averaging  1.39  g/t  (see Alto’s and PFN’s news releases dated December 3, 2009 and January 15, 2010).  The results from these first eight holes are very positive as they confirm continuity of gold mineralization between previously drilled holes, some of which were spaced from 100m to 200m apart.   The mineralization remains open along strike and at depth.

The Phase 1 and Phase 2 programs are designed to expand the known NI43‐101 compliant resources at the DAC Deposit through infill and step‐out drilling.  A Phase 3 program is slated for later this year and its size will depend  on  final  results  from  Phase  1  and  results  from  the  current  Phase  2  program.    PFN  has  funded  the $600,000 Phase 1 program and will continue to fund Phase 2.  The Phase 1 and Phase 2 programs are managed by Alto.

The property is located approximately 75 km north of Val d’Or in the Abitibi‐Témiscamingue region of Quebec. The geological environment at Destiny including the shear‐hosted high grade quartz veins is similar to the main Val d’Or gold belt.  Val d’Or is one of the major gold mining centres in the Province of Québec, and currently active  with  many  new  mine  development  projects.  The  property  is  road  accessible  with  excellent  mining infrastructure and support facilities nearby.

About the DAC Deposit 

The  main area  of  mineralization  on  the  Destiny  Gold  Property is  the  DAC  zone,  which  occurs  over  a  strike length  of  about  600  m.  In  this  area,  four  to  five  identifiable  intervals  of  quartz  veining  and  shear‐related alteration zones carry high grade gold mineralization,  with drill intersections up to 178.5 g/t gold over a drill 

width of 1m.  The DAC zone hosts a NI 43‐101 compliant indicated resource of 166,863 tonnes grading 6.88  g/t  gold  (36,892  ounces)  and  an  inferred  resource  of  444,753  tonnes  grading  4.46  g/t  gold  (63,839  ounces)  calculated by W.A. Hubacheck Consultants Ltd. in 2007 (see “A Resource Estimate of the DAC Gold Deposit, Despinassy Twp., Val d’Or, Quebec” dated January 9, 2007, available on the Alto Ventures website). Drill‐hole cross sections and a 3D model were generated for the DAC Deposit in 2008 and are posted on www.corebox.net.

The Destiny Gold Property is under Option to Pacific North West Capital Corp.  Under the terms of the Option Agreement, Pacific North West Capital will pay Alto $200,000, provide Alto with 250,000 common shares of Pacific  North  West  Capital,  and  complete  a  total  of  $3,500,000  in  exploration  expenditures  over  a  four  year period to earn a 60% interest in the Destiny Gold Property. Subsequent to vesting of its interest, Pacific North West Capital will form a joint venture with Alto to further develop the project

Mike Koziol, P. Geo., P.Eng. and Alto’s President and CEO is the Qualified Person who has reviewed and approved this news release.

About Pacific North West Capital Corp: 

Pacific North West Capital Corp. (TSX: PFN; OTCBB: PAWEF; FSE: P7J.F) is a mineral exploration company focused on Platinum Group Metals (PGM), precious and base metals. Managementʹs corporate philosophy is to be a Project Generator, Explorer and Project Operator with the objective of option/joint venturing projects with major and junior mining companies through to production. To that end, Pacific North West Capitalʹs current option/joint  ventures  agreements  are  with  Anglo  Platinum,  First  Nickel,  Alto  Ventures    and  is  a  major shareholder of Fire River Gold Corp. (www.firerivergold.com)

Pacific North West Capital Corp. is well funded with an experienced management team and the ability to take advantage of the tremendous under funded opportunities that are available in the mining sector today.

About Alto Ventures Ltd 

Alto Ventures Ltd. is a gold exploration and development company with a portfolio of highly prospective properties in the Canadian Shield. The Company is currently active in Quebec where it is focussed on the Destiny Gold project in the Abitibi Greenstone Belt and in Ontario in the Beardmore and Shebandowan gold districts.

For more details regarding the Company’s projects, please visit our website at www.altoventures.com.

ON BEHALF OF THE BOARD,

Mike Koziol, P. Geo., P. Eng.

President & CEO

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

For further information contact:

Mark Prosser Investor Relations Manager ALTO VENTURES LTD.

Vancouver, BC, V6C 2B3 Tel: 604-638-3947 Fax: 604-689-3609 Email: [email protected] Website: www.altoventures.com