Tuesday, October 20, 2026
MiningNewsTerminal
Tuesday, October 20, 2026 Admin

BNKR.TO ·

Bunker Hill Announces Updated Mineral Resource and Identifies New Silver Exploration Targets

Resource Estimates Exploration Programs

HIGHLIGHTS: 

  • Previous 8.8Mt Inferred resource significantly upgraded, supporting the rapid restart program:  

‐ Indicated resource of 4.4Mt containing 3.03Moz of silver, 487M lb of zinc, and 176M lb of lead   ‐ Inferred resource of 5.6Mt containing 8.3Moz of silver, 548M lb of zinc, and 312M lb of lead 

  • UTZ added new resource with successful silver exploration drilling 
  • The PEA remains on track for completion in early Q2‐2021 
  • New, near surface silver exploration targets to be evaluated in current drilling campaign  

TORONTO, Canada, March 19, 2021 – Bunker Hill Mining Corporation (the “Company”) (CSE: BNKR) is pleased to report a significant resource increase at Bunker Hill Mine located in Idaho’s Silver Valley, USA. This underpins the Preliminary Economic Assessment (“PEA”), aimed the mine’s rapid restart potential, due to be published in early Q2‐2021.

Sam Ash, CEO of Bunker Hill Mining, stated: “We are excited to see the results of our drilling campaign and continued digitization  realized  in  this  significant upgrade  of  the  resource  at  Bunker  Hill,  building  on  the  maiden  resource  we published less than a year ago.  This demonstrates the mine’s outstanding mineral potential, which we expect to be reflected in the PEA assessing a rapid restart. This remains on track for delivery in early April. As part of the on‐going campaign to add more silver to our resources, we have also identified some exciting new silver exploration targets in the upper levels of the mine which will be evaluated by drilling over the next few weeks”.

The on‐going digital modernization program has yielded a three‐dimensional model, defining nearly 100 years of mining voids and geology, which increases confidence in the estimation of mineralization.  Additional drilling, modern data collection and assaying, quality assurance and quality control protocols, as well as the verification channel sampling program of 2020 has provided the necessary information to increase the confidence and classification of the Newgard, Quill and UTZ mineral resource estimates.  The preponderance of data has converted approximately seventy‐seven percent (77%) of the Bunker Hill Mineral Resource to the Indicated Mineral Resource category.

The Bunker Hill Mineral Resource, effective March 19, 2021, reported at a zinc cutoff grade of 3.3% is described below:

Bunker Hill Resource Table 

Zinc ResourcesK TonsPb%Ag optZn%
Indicated4,4102.000.695.52
Inferred4,5691.670.835.66
Lead‐Silver ResourcesK TonsPb%Ag optZn%
Indicated‐‐‐‐
Inferred1,0507.564.281.50
Total ResourcesK TonsPb%Ag optZn%
Indicated4,4102.000.695.52
Inferred5,6182.771.484.88

Mineral Resources are reported at a zinc cutoff grade of 3.3%. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.  Mineral Resources are reported in situ and undiluted. Mineral Resources meet the  reasonable  prospects  of  eventual  economic  extraction  due  to  the  fact  that  the  entire  vertical  extents  of  the mineralization have been developed on mining levels every two‐hundred feet. Newgard and Quill were being actively exploited and developed prior to the shutdown of mining operations in 1991. High grade capping was applied to the assays prior to grade estimation.  Grades are estimated using Inverse Distance Cubed (ID3) interpolation techniques. Grades were estimated into a regularized 5 ft x 5 ft x 5 ft block model.  A bull density of 11.3 cubic feet per ton was applied to the entire mineral resource based upon historic density values from production records at Bunker Hill.  Two‐ hundred  sixty‐one  (261)  drillholes,  totaling  29,380‐feet,  containing  5,720  Pb,  Zn  and  Ag  assays  were  used  in  the determination  of  mineralization.  Assays  were  composited  to  4,483  5‐foot  composites.    Additionally,  4,545  historic production car samples and 394 channel sample verification samples were used for the resource estimate.  Historic mining voids, stopes and development drifting have been accounted for in the resource estimate.

Figure 1: Oblique View of UTZ, Newgard and Quill Mineral Zones Showing Indicated and Inferred Mineralization 

Significant New Silver Exploration Target Identified 

New interpretation and analysis based on developments in the geologic model have identified an exciting new silver exploration opportunity in the hanging wall of the Cate Fault in the upper areas of the Bunker Hill Mine.

Silver  production  at  Bunker  Hill  came  largely  from  discrete  Galena‐Quartz  Veins  that  formed  ore  shoots  hosted  in preferable quartzite beds of the Revett formation. The vein segments are bounded by large normal faults such as the Dull, Kruger and Sullivan Faults, which have down‐dropped large blocks of the stratigraphy and veins down to the south, with >4000 ft of collective displacement. The more recent Cate Thrust Fault has then bisected this package of rocks, shifting rocks above the fault >500 ft up to the north.

The 3D modeling has allowed Bunker Hill geologists to project these vein segments back to their position at time of emplacement. The presence of high‐grade silver veins such as the historically mined Sierra Nevada Vein in the hanging wall of the Cate Fault demonstrate that the width of the mineralizing system has not been discovered and the southern margin is unknown. The similar grades, thickness and mineralogy of the vein segments across the earlier normal faults shows that the vertical extent of the system was likely at least 4x the down‐dip length of the individual veins. A similar set of normal faults, such as the Buckeye Fault, with significant down‐to‐the‐south displacement also exists in the hanging wall of the Cate fault, with Ag‐Pb‐Zn mineralization indicated by historic and recent drilling in the hanging wall, or down‐dropped portions of these faults.

Figure 2: Hanging Wall of Cate Fault 

To summarize, none of the major faults that were historically thought as controlling ore emplacement actually bound the mineralizing system, and the entire Property is fully within the elevation and mineralogical zonation leading to silver, lead and zinc deposition.

The Cate Fault was the limit of most early mining in the upper parts of Bunker Hill, and it wasn’t until the 1960’s that it was recognized as having post‐mineral offset. A few of the first core holes ever drilled in Bunker Hill in 1898 from the 5 Level were directed past the Cate and Buckeye Faults, with impressive results including 12’ @ 42.7% Pb and 18.6 opt Ag in DH‐4, but mining largely shifted to below the 9 level after the Kellogg Tunnel was completed, and these holes were never followed up on. Bunker Hill is currently drilling to test these targets, and the holes are intersecting encouraging structures and lithologies similar to what has been modeled. Any mineralization encountered in these holes will be an entirely new vein system for Bunker Hill, not defined, named, mined or incorporated in any prior mine plans or resource estimates. Drill holes have been planned to systematically offset any successful intercepts in the first holes, and drill stations are being prepared to test these targets at appropriate angles and reduced distances. The locations of the targets are such that any mineralization defined with successful drilling could be rapidly incorporated in an update to mine plans or mineral resources.

Figure 3: Planned Drill Holes from 5 Level at Cate and Buckeye Faults 

Note: The reader is cautioned that these are exploration‐stage targets, which is speculative in nature, and there is no guarantee of positive drill results defining any economic mineralization.

A video summarizing the digitization process can be viewed at the following link https://youtu.be/8X3FrWfbGl4?t=229. In addition, further information is available on our newly launched website.

Recent drill results are presented in the tables below.

ZINC INTERCEPTS 

Hole 7046

7046FromToMZnEq (%) g/t Ag%Pb%Zn
99.5119.019.54.315.71.42.8
Including99.5100.71.27.9241.85.9
103.3103.80.512.5594.77.2
105.8107.31.57.0211.95.0
108.5109.71.25.5161.53.9
113.8115.21.410.2414.35.7

Hole 7047

7047 FromToMZnEq (%) g/t Ag%Pb%Zn
92.293.10.99.790.49.1
105.6106.71.14.8100.64.1

Hole 7052

7052FromToMZnEq (%) g/t Ag%Pb%Zn
20.123.63.52.111.30.61.3
Including20.12194.4160.83.4
1.1221.31.4
22.523.62.9
7052FromToMZnEq (%) g/t Ag%Pb%Zn
37.244.57.32.47.80.51.8
Including37.238.10.92.8181.51.1
39.539.80.39.2262.06.9
42.243.31.15.7100.55.1
43.344.51.24.0120.73.2

Hole 7055A

7055A  From  To  M  ZnEq (%)  g/t Ag  %Pb  %Zn

19.4  20.4  1.0  25.0  105  7.8  16.1

Hole 7061

7061FromToMZnEq (%) g/t Ag%Pb%Zn
11.918.16.27.322.61.75.5
Including11.912.60.713.5291.711.5
14.215.215.4383.51.7
15.216.51.36.6171.35.2
16.917.70.818.0483.114.3
17.718.10.413.4201.411.7

SILVER INTERCEPTS 

Hole 7046

7046FromToMAgEq g/tg/t Ag%Pb%Zn
134.1159.425.392.312.81.01.2
Including138.1139.51.4255.4382.53.4
142.6143.71.1180.5262.61.8
148.4149.30.9212.5242.52.8
158.9159.40.5332.4653.44.0

Hole 7052

7052FromToMAgEq g/tg/t Ag%Pb%Zn
15.717.7285.815.51.30.7
Including15.716.00.3219.5342.62.6

151.5  30 17.1  17.7  0.6  2.8  0.8

Hole 7052

7052  From  To  M  AgEq g/t  g/t Ag  %Pb  %Zn

32.9  33.5  0.6  348.3  43  3.98  4.2

Hole 7054

7054FromToMAgEq g/tg/t Ag%Pb%Zn
0.94.23.3337.181.77.50.4
Including0.92.01.12125150.1
2.02.40.4282.5726.50.1
2.43.61.161014913.70.7

Hole 7054

7054  From  To  M  AgEq g/t  g/t Ag  %Pb  %Zn

15.8  16.4  0.6  328.9  86  7.6  0.1

Hole 7055A

7055A  From  To  M  AgEq g/t  g/t Ag  %Pb  %Zn

1.5  2.3  0.8  361.5  92  8.5  0.1

Hole 7064

7064  From  To  M  AgEq g/t  g/t Ag  %Pb  %Zn

131.7  132.4  0.7  357.2  138  7.0  0.01

*Due to poor recovery and for QA/QC purposes in portions of holes 7054, 7056 and 7063 and for QA/QC purposes, the company chose to report assay results based only on recovered footage. Drilled footage is NOT the reported width of the intercepts.

(Reported  widths  are  intercepted  ore  lengths  and  not  true  widths,  as  relationships  with  intercepted  structures  and  contacts vary. Prices used to calculate Ag and Zn Eq are as follows: Zn=$1.16/lb, Pb=$0.92/lb, Ag=$20/oz.) 

Upcoming Events: 

Alliance Global Partners (A.G.P) Mining Series Fireside Chat 

March 23, 2021 @ 8:00am PT / 11:00am ET Join Us: REGISTER NOW

Mining & Money Online Connect 

March 24, 2021 @ 10:00am PT / 1:00pm ET Join Us: REGISTER NOW

Technical Information 

The diamond drilling program used HQ‐size core.  Bunker Hill followed standard QA/QC practices to ensure the integrity of the core and sample preparation through to delivery of the samples to the assay lab.  The drill core was stored in a secure facility, photographed, logged and sampled based on lithologic and mineralogical interpretations.  Standards of certified reference materials, field duplicates and blanks were inserted as samples shipped with the core samples to the lab.

ALS Global was used to provide analytical services and all results comply with both NI 43‐101 and industry standards. ALS  Global  holds  an  industry  standard  ISO  17025  accreditation,  specifying  general  requirements  for  laboratory performance.

The Company advises that it does not propose to base its production decision on a feasibility study of mineral reserves, demonstrating economic and technical viability, and, as a result, there may be an increased uncertainty of achieving any particular level of recovery of minerals or the cost of such recovery, including increased risks associated with developing a commercially mineable deposit. Historically, such projects have a higher risk of economic and technical failure. There is no guarantee that production will begin as anticipated or at all or that anticipated production costs will be achieved. The  Company  further  cautions  that  a  PEA  is  preliminary  in  nature.  No  mining  study  has  been  completed.  Mineral resources are not mineral reserves and do not have demonstrated economic viability. There is no certainty that the PEA will be realized.

Qualified Person 

Mr. Scott E. Wilson, CPG, President of Resource Development Associates Inc. and a consultant to the Company, is an Independent “Qualified Person” as defined by NI 43‐101 and is acting at the Qualified Person for the Company. He has reviewed and approved the technical information summarized in this news release.

About Bunker Hill Mining Corp.  

Under new Idaho‐based leadership the Bunker Hill Mining Corp, intends to sustainably restart and develop the Bunker Hill Mine as the first step in consolidating a portfolio of North American precious‐metal assets with a focus on silver.

Information about the Company is available on its website, www.bunkerhillmining.com, or within the SEDAR and EDGAR databases.

For additional information contact:

Sam Ash, President and Chief Executive Officer +1 208 786 6999 [email protected]

Cautionary Statements 

Certain  statements  in  this  news  release  are  forward‐looking  and  involve  a  number  of  risks  and  uncertainties.  Such  forward‐looking statements are within the meaning of that term in Section 27A of the Securities Act of 1933, as amended,  and Section 21E of the Securities Exchange Act of 1934, as amended, as well as within the meaning of the phrase  ‘forward‐looking  information’  in  the  Canadian  Securities  Administrators’  National  Instrument  51‐102  –  Continuous  Disclosure Obligations. Forward‐looking statements are not comprised of historical facts. Forward‐looking statements  include estimates and statements that describe the Company’s future plans, objectives or goals, including words to the  effect that the Company or management expects a stated condition or result to occur. Forward‐looking statements may  be  identified  by  such  terms  as  “believes”,  “anticipates”,  “expects”,  “estimates”,  “may”,  “could”,  “would”,  “will”,  or  “plan”. Since forward‐looking statements are based on assumptions and address future events and conditions, by their  very nature they involve inherent risks and uncertainties. Although these statements are based on information currently  available to the Company, the Company provides no assurance that actual results will meet management’s expectations.  Risks,  uncertainties  and  other  factors  involved  with  forward‐looking  information  could  cause  actual  events,  results,  performance, prospects and opportunities to differ materially from those expressed or implied by such forward‐looking  information. Forward looking information in this news release includes, but is not limited to, the Company’s intentions  regarding its objectives, goals or future plans and statements. Factors that could cause actual results to differ materially  from such forward‐looking information include, but are not limited to: the ability to predict and counteract the effects of  COVID‐19  on  the  business  of  the  Company,  including  but  not  limited  to  the  effects  of  COVID‐19  on  the  price  of  commodities, capital market conditions, restriction on labour and international travel and supply chains;  failure to  identify  mineral  resources;  failure  to  convert  estimated  mineral  resources  to  reserves;  the  inability  to  complete  a  feasibility study which recommends a production decision; the preliminary nature of metallurgical test results; delays in  obtaining or failures to obtain required governmental, environmental or other project approvals; political risks; changes  in equity markets; uncertainties relating to the availability and costs of financing needed in the future; the inability of  the Company to budget and manage its liquidity in light of the failure to obtain additional financing, including the ability  of the Company to complete the payments pursuant to the terms of the agreement to acquire the Bunker Hill Mine  Complex; inflation; changes in exchange rates; fluctuations in commodity prices; delays in the development of projects;  capital, operating and reclamation costs varying significantly from estimates and the other risks involved in the mineral  exploration  and  development  industry;  and  those  risks  set  out  in  the  Company’s  public  documents  filed  on  SEDAR.  Although the Company believes that the assumptions and factors used in preparing the forward‐looking information in  this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the  date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at  all. The Company disclaims any intention or obligation to update or revise any forward‐looking information, whether as  a result of new information, future events or otherwise, other than as required by law.  No stock exchange, securities  commission or other regulatory authority has approved or disapproved the information contained herein. 

Cautionary Note to United States Investors Concerning Estimates of Measured, Indicated and Inferred Resources 

This press release has been prepared in accordance with the requirements of the securities laws in effect in Canada,  which differ from the requirements of U.S. securities laws. Unless otherwise indicated, all resource and reserve estimates  included in this press release have been disclosed in accordance with NI 43‐101 and the Canadian Institute of Mining,  Metallurgy,  and  Petroleum  Definition  Standards  on  Mineral  Resources  and  Mineral  Reserves.  NI  43‐101  is  a  rule  developed by the Canadian Securities Administrators which establishes standards for all public disclosure an issuer makes  of scientific and technical information concerning mineral projects. Canadian disclosure standards, including NI 43‐101,  differ significantly from the requirements of the United States Securities and Exchange Commission (“SEC”), and resource  and reserve information contained in this press release may not be comparable to similar information disclosed by U.S.  companies. In particular, and without limiting the generality of the foregoing, the term “resource” does not equate to  the term “reserves”. Under U.S. standards, mineralization may not be classified as a “reserve” unless the determination  has been made that the mineralization could be economically and legally produced or extracted at the time the reserve  determination is made. The SEC’s disclosure standards normally do not permit the inclusion of information concerning  “measured mineral resources”, “indicated mineral resources” or “inferred mineral resources” or other descriptions of the  amount of mineralization in mineral deposits that do not constitute “reserves” by U.S. standards in documents filed with  the SEC. Investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be  converted into reserves. U.S. investors should also understand that “inferred mineral resources” have a great amount of  uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. It cannot be assumed  that all or any part of an “inferred mineral resource” will ever be upgraded to a higher category. Investors are cautioned  not  to  assume  that  all  or  any  part  of  an  “inferred  mineral  resource”  exists  or  is  economically  or  legally  mineable.  Disclosure of “contained ounces” in a resource is permitted disclosure under Canadian regulations; however, the SEC  normally only permits issuers to report mineralization that does not constitute “reserves” by SEC standards as in‐place  tonnage and grade without reference to unit measures. The requirements of NI 43‐101 for disclosure of “reserves” are  also not the same as those of the SEC, and reserves disclosed by the Company in accordance with NI 43‐101 may not  qualify as “reserves” under SEC standards. Accordingly, information concerning mineral deposits contained in our website  may not be comparable with information made public by companies that report in accordance with U.S. standards.