Maya  Gold  &  Silver  Inc.  Files  Technical  Report  on  Positive  PEA  at  the Zgounder  Silver  Mine  in  Morocco

Montreal  ,  Québec-­‐  February  22    ,  2018  –  Maya  Gold  &  Silver  Inc.  (“Maya”  or  the  “Corporation”)  (TSXV:  MYA)   is  pleased  to  announce  that  it  has  filed  on  SEDAR  a  Technical  Report  in  compliance  with  National  Instrument  43-­‐ 101  (NI  43-­‐101)  to  support  the  mineral  resources  estimates  declared  on  January  8th  and  the  PEA  declared  on February  5th  2018.

This  press  release  confirms  the  February  5th  disclosure.

The   Corporation   presents   the   results   of   an   independent   NI   43-­‐101   Preliminary   Economic   Assessment   Study (“PEA”)  on  its  Zgounder  Silver  Mine  in  Morocco.  The  mine  is  owned  by  Zgounder  Millenium  Silver  Mining  S.A. (ZMSM),   a   Maya   85%   owned   joint   venture   with   l'Office   National   des   Hydrocarbures   et   des   Mines   of   the Kingdom  of  Morocco  (15%).  The  PEA  Study,  prepared  by  GoldMinds  Geoservices  Inc.  from  Québec  City  (GMG), is  dated  January  30th  2018  and  relies  on  mineral  resource  estimates  reported  on  January  8th  2018.

Maya   started   the   first   diamond-­‐drilling   program   at   Zgounder   in   April   2015   and   both   the   diamond   drilling programs  of  2015  and  2017  allowed  Maya  to  increase  the  mineral  resource  estimates  of  Zgounder.  The  milling operations  began  in  July  2014  and  Maya  announced  the  first  silver  pour  in  August  2014  with  the  production  of the   20   silver   ingots.   Maya   has   produced   a   total   of   1.35   million   ounces   of   silver   at   its   Zgounder   mine   as   of December  2017.

Highlights  of  the  Zgounder  Silver  Mine  PEA  Study:  

� A  project  life  of  10  years  with  the  current  resources  up  to  2027;  

� ZMSM  Internal  Rate  of  Return  of  134%  and  118%  after  taxes;  

� ZMSM   pre-­‐tax   Net   Present   Value   of   US$215.1M   (discounted   at   6.5%)   at   variable   silver   price   from  

US$17.50  to  US$21.50  per  ounce  with  yearly  average  of  US$20.50  per  ounce;  

� ZMSM  after-­‐tax  Net  Present  Value  of  US$200.2M  (discounted  at  6.5%)  at  variable  silver  price  from  

USD$17.50  to  USD21.5  USD  per  ounce  with  average  of  US$20.5  per  ounce;  

� The  extraction  of  3.974Mt  at  292  g/t  Ag  for  silver  production  of  33.682M  ounces;  

� Milling  to  increase  to  500  tpd  in  2018  then  up  to  2020  followed  by  a  2000  tpd  in  2021;  

� Production  increase  to  1.354M  ounces  per  year  up  to  4.762M  ounces  of  silver  per  year;  

� Total  operating  cost  of  US  $63.64  per  tonne  (averaged  over  the  expected  mine’s  life);  

� Capex  and  sustaining  capital  requirements  of  US  $46.9M   � MAYA  Internal  Rate  of  Return  of  121%  with  an  NPV  of  US$209.86M;  

� The  Zgounder  PEA  was  prepared  as  combination  of  underground  extraction,  open  pit  extraction  of   mineralized  material  as  well  as  reprocessing  of  old  tailings  based  on  the  mineral  resources  reported   on  January  8,  2018.  

Cautionary  Statements  

The  PEA  is  preliminary  in  nature  and  includes  the  use  of  inferred  mineral  resources  that  are  considered  too speculative  geologically  to  have  the  economic  considerations  applied  to  them  that  would  enable  them  to  be categorized  as  mineral  reserves.  Thus,  there  is  no  certainty  that  the  results  stated  in  the  PEA  will  be  realized. Actual   results   may   vary,   perhaps   materially.   Mineral   resources   that   are   not   mineral   reserves   do   not   have demonstrated  economic  viability.  Additional  exploration  work  is  required  to  increase  the  quality  of  the  mineral resources.

Message  From  the  President  

Noureddine  Mokaddem,  President  and  CEO  of  Maya,  stated:  "These  positive  results  of  the  PEA  are  an  important   milestone  reached  at  the  Zgounder  silver  mine.  We  are  very  excited  to  see  such  high  NPV,  a  break-­‐even  point   before  taxes  of  US$10.40/ounce  Ag,  well  positions  Zgounder  to  face  severe  commodity  fluctuations.  The  financial   results  outlined  in  the  PEA  are  highly  encouraging,  indicating  the  economic  viability  of  the  known  resources  and   supports  our  belief  that  Zgounder  is  a  robust  project,  and  has  the  upward  potential  in  inferred  resources  to  grow   into  an  important  silver  producer.  These  results  will  help  Maya  continue  to  scale  and  achieve  its  aspirations.”  

Mineral  Resource  Used  in  the  PEA  

The  NI  43-­‐101  PEA  Study  was  based  on  the  undiluted  mineral  resource  estimate  prepared  by  GMG  previously reported  by  Maya  on  January  8th,  2018.  The  table  below  summarizes  the  mineral  resource  estimated  by  GMG combining  forty-­‐eight  (48)  envelopes  and  the  old  tailings.

A  cut-­‐off   grade  of   61.89   g/t   was  applied  for   the   in-­‐pit   mineral   resources  and  a   cut-­‐off   grade  of   125   g/t   was applied  for  the  underground  mineral  resources  (just  under  the  pit  surface).

Total  resource  estimate  at  Zgounder  silver  mine  (rounded  numbers).  

MeasuredIndicatedInferredMeasured + Indicated
TonnesAg g/tOuncesTonnesAg g/tOuncesTonnesAg g/tOuncesTonnesAg g/tOunces
242,0003382,633,000748,0003087,395,0003,437,00025628,338,000990,00031510,028,000

In-­‐pit  resource  estimate  at  Zgounder  silver  mine  (rounded  numbers).  

MeasuredIndicatedInferredMeasured + Indicated
TonnesAg g/tOuncesTonnesAg g/tOuncesTonnesAg g/tOuncesTonnesAg g/tOunces
208,0003152,108,000616,0002935,794,0001,886,00024815,012,000824,0002987,902,000

High  grade  underground  resource  estimate  at  Zgounder  silver  mine  (rounded  numbers).  

MeasuredIndicatedInferredMeasured + Indicated
TonnesAg g/tOuncesTonnesAg g/tOuncesTonnesAg g/tOuncesTonnesAg g/tOunces
34,000482527,000132,0003771,601,0001,051,00033211,209,000166,0003982,128,000

The  old  tailings  Inferred  mineral  resources    

Inferred
TonnesAg g/tOunces
500,0001322,122,000

Project  Economics

A  summary  of  the  base  case  parameters  and  assumptions  are  shown  below:

Project  Base  Case  Economic  Parameters  and  Assumptions  

ItemsUnitsValues
Silver price (yearly average)US/oz$20.50
Processed tonnage over LoMmetric tonne4,926,500
Silver metal productionounces33,682,600
Royalty on sales (ONHYM)%3.0
Maya Management Fees including NPI(1)%2.75
Taxes for the first 5 years on gross revenues for a new company(2)%0.5
Taxes after the first 5 years on profits%17.5

1  Net  Profit  Interest  on  gross  profits  (sales  less  milling  and  mining  costs)  

2  After  completion  of  OHNYM  8Million  Oz  commitment  (15%),  Project  will  be  100%  owned  by  a  new  company  owned  by  Maya   in  2021.  

The  project  cash  flow  summary  of  the  base  case  is  shown  in  the  following  table:

Project  Cash  Flow  Summary  ZMSM  

ItemsValue
US
Total revenue of silver sales$708,967,000
Total operating costs$313,515,000
After-­‐tax undiscounted cash flow$325,182,000
After-­‐tax discounted (6.5%) NPV$200,217,000

Project  Sensitivities  are  shown  in  the  following  table:

Sensitivity  Analysis  for  Zgounder  Millenium  Silver  Mining  (ZMSM)  

ParameterUnit-30%-20%-10%0%+10%+20%+30%
Pre-­‐Tax
CapexM US$32,8337,5242,2146,9051,5956,2860,97
NPV @ 6,5%M US$224,68221,49218,30215,11211,92208,73205,53
IRR%152146140134128123117
OpexM US$219,46250,81282,16313,51344,87376,22407,57
NPV @ 6,5%M US$275,55255,40235,26215,11194,96174,81154,66
IRR%18216514913411910693
Metal Price (avg)$/oz14,3516,4018,4520,5022,5524,6026,65
NPV @ 6,5%M US$86,97129,68172,39215,11257,82300,54343,25
IRR%5983108134161189217
Recovery (avg)%6170788796
NPV @ 6,5%M US$88,33130,59172,85215,11257,37
IRR%6084108134161
Head Gradeg/t204234263292321351380
NPV @ 6,5%M US$94,07134,42174,76215,11255,45295,80336,14
IRR%6385109134160187214
ParameterUnit-30%-20%-10%0%+10%+20%+30%
After-­‐Tax
CapexM US$32,8337,5242,2146,9051,5956,2860,97
NPV @ 6,5%M US$209,79206,60203,41200,22197,03193,83190,64
IRR%135129124118113108103
OpexM US$219,46250,81282,16313,51344,87376,22407,57
NPV @ 6,5%M US$256,59237,80219,01200,22181,43162,63143,84
IRR%1551431301181079585
Metal Price (avg)$/oz14,3516,4018,4520,5022,5524,6026,65
NPV @ 6,5%M US$80,15120,17160,19200,22240,24280,26320,29
IRR%557697118140162185
Recovery (avg)%6170788796
NPV @ 6,5%M US$81,43121,02160,62200,22239,81
IRR%567797118139
Head Gradeg/t204234263292321351380
NPV @ 6,5%M US$86,87124,65162,43200,22238,00275,78313,57
IRR%587898118139160182

The  sensitivity  analysis  suggests  that  the  most  sensitive  parameters  are  the  head  grade,  the  recovery  and  the silver  price.  The  project  outlook  calculation  presents  a  robust  positive  project  even  at  US$14.35/Oz  silver  and also  shows  important  NPV  with  the  increase  in  Metal  price.

Operating  Costs  

The  operating  costs,  also  called  operating  expenditures  (Opex),  are  expressed  in  USD  per  tonne  processed,  and are  summarized  below.  This  next  Table  outlines  the  costs  of  the  total  project.

Operating  Costs  

ItemsCostCost
USUS/t milled
Waste development cost$102,074,242$20.72
Mineralized Material production cost$51,842,142$10.52
Mineralized Material process cost$95,507,510$19.39
General and Administration$23,325,499$4.73
Royalty & Management fees (incl. NPI)$40,765,601$8.27
Total$313,514,993$63.63

Note:  The  internal  shaft,  main  ramp  with  all  major  underground  developments  of  the  mine  down  to  1620m  level are  in  the  Capex  sustaining  capital.  Provision  for  additional  underground  development  is  taken  into  account  with a  20%  waste  development  of  mineralized  material  mined  at  year  2021  as  it  is  currently  at  10%.

Capital  Costs  

The  breakdown  of  the  surface,  mill  and  underground  remaining  capital  cost  expenditures  (Capex)  and  sustaining capital  to  materialize  the  study  is  summarized  in  the  following  table.  It  is  important  to  realize  that  the  Zgounder project  capital  costs  for  the  500  tpd  mill  has  already  been  paid  with  the  mine  revenues.

The  sensitivity  analysis  suggests  that  the  remaining  capital  cost  has  low  impact  on  the  economical  results.

It  is  important  to  mention  that  operating  costs  are  based  on  existing  real  cost  adapted  to  up  scaling  scenarios. Moreover,  the  mill  capital  costs  are  based  on  real  effective  quotes  received  from  Xinhai  based  in  China.  The  500 tpd  mill  is  already  on  site  and  is  being  installed.

Capex  Summary

DescriptionCost -­‐ US
Mill 500 tpd$5 000 000
Mill 2000 tpd$20 000 000
Shaft+Rock B.$3 000 000
Ramp & Gallery$6 400 000
New tailing$1 500 000
Energy line$3 500 000
Explosive magazine$800 000
UG Maintenance room$750 000
Site prep. mill 2000 tpd$1 000 000
Air vent/Exit$250 000
Exploration+Studies$2 500 000
Water treatment plan$450 000
Ventilation$500 000
Upgraded Live Camp$1 250 000
Total$46 900 000

1US$=10Dirhams

In  addition  to  the  capital  cost  needed  of  US  $5,000,000  initially,  there  is  an  estimated  amount  of  US  $41,900,000 required  for  the  sustaining  capital  included  in  the  cash  flow.  No  contingency  on  the  Capex  has  been  added,  as  it is  a  preliminary  economic  assessment  with  a  +/-­‐  30%  precision.

The  Zgounder  Cash  Flow  after  tax  is  positive  every  year  from  its  own  revenues  except  for  year  three,  which  will require  financing,  and  with  a  payback  of  one  year.  The  500  tpd  mill  is  uphill  near  the  existing  base  camp,  while the  proposed  new  2000  tpd  mill  should  be  installed  south  of  the  2000m  level  entrance  and  the  existing  200  tpd mill.

Mining  

The  Zgounder  deposit  assumes  the  processing  of  an  average  of  340  tpd  for  the  first  year  (half  at  187.5  tpd  and half   at   500   tpd),   with   an   envisioned   expansion   to   500  tpd   forecasted   for   two   years   and   2000   tpd   for   the remaining  seven  years  of  production.

The  Zgounder  deposit  is  located  in  competent  rock  and  has  a  steep  overall  dip,  making  it  easily  mined  using  free falling  methods.  It  is  recommended  to  use  the  open  long-­‐hole  mining  method  with  sub-­‐levels  for  the  proposed new  mining  sites.

It  is  proposed  to  excavate  a  main  ramp  to  connect  all  existing  levels  to  the  East  above  the  2,000m  up  to  2,100m level.  Continued  ramp  access  to  the  1,800m  level  below  the  2000m  level  and  reach  out  the  develop  levels  down to  1,925m  and  the  future  levels  down  to  1,800m;  this  will  facilitate  the  development  and  also  the  transportation of  backfill  when  required.  Above  2,100  m  elevation,  the  levels  are  accessible  by  adits.  As  the  mine  has  previously been  in  production,  few  new  developments  are  required  above  2000m.  The  total  of  additional  development required  is  estimated  at  20%  of  mineralized  material  tonnage  with  an  average  of  3.0m  linear  meters  per  working day.   There   is   a   provision   in   the   Capex   (sustaining   capital)   for   an   average   of   6.0m   linear   per   working   day, including  the  ramp  (3.4m  x  4m  section),  for  a  total  of  4,691  meters  for  the  major  access  and  a  315m  internal shaft  for  the  life  of  mine  (LOM).

The  current  processing  plant  was  built  to  process  200  metric  tons  per  day,  assuming  350  working  days  per  year, amounting  to  70,000  tonnes  per  year.  With  the  implementation  of  the  new  500  tpd,  mill  assuming  350  working days  per  year,  amounting  to  175,500  tonnes  a  year,  the  feed  would  come  from  the  underground  mine  above  the 2000m  level.  Subsequently  with  the  implementation  of  the  2000  tpd  mill,  mining  and  mill  feed  should  come from  the  surface,  underground  and  the  ancient  tailings  in  a  proportion  of  45%,  42%  and  13%  respectively.  The scheduled  tonnage  for  the  2000  tpd  from  surface  is  900  tonnes,  840  tonnes  from  underground  and  260  tonnes from  the  old  tailings.  This  has  been  applied  to  the  ratio  of  available  resources  and  optimization  has  not  been done.

The  surface  extraction  should  use  drill,  blast,  load,  haul  to  crusher  and/or  ore  pass  of  the  existing  Alimak.  A  fleet was  initially  selected  and  the  management  of  ZMSM  prefers  to  use  national  mining  contractors  to  reduce  the Capex  burden.  As  well,  underground  mining  equipment  was  initially  selected  as  a  fleet,  as  the  mine  is  actually mining  contractors,  the  Corporation  wishes  to  pursue  that  path  and  equipment  list  elaborated  by  Goldminds should  be  used  as  reference  for  the  equivalence.  With  the  present  total  mineralized  material  being  in  the  order of  4Mt,  the  mine  life  would  be  10  years  with  the  upgrade  to  500  tpd  and  the  2000tpd.  The  mineralized  material available  is  1.681Mt  at  331  g/t  from  UG,  1.79Mt  at  300  g/t  from  potential  quarry  and  500,000  tonnes  at  132  g/t Ag  from  the  old  tailings.  Material  at  the  surface  is  pit  constrained.

According  to  the  historical  and  the  current  mine  production,  the  mining  dilution  is  10%  and  the  mining  recovery is  97%.  The  10%  mining  dilution  is  applied  up  to  year  2020  and  afterward  30%  as  it  represents  the  10%  from underground  and  an  expected  50%  dilution  in  the  pit.  These  values  are  applied  in  the  PEA  Study.  A  dilution  grade of  50  g/t  Ag  to  the  mill  feed  grade  is  applied.

The   Zgounder   mine   is   accessible   from   adits   on   each   main   level,   offering   the   advantage   of   straightforward dewatering  and  good  natural  air  circulation  from  surface  to  the  2000m  Level.  Existing  levels  down  to  1925m should  be  used  in  the  redevelopment  below  the  2000m  main  level.

Metallurgy  and  Processing  

Actual  mill  operation  is  about  185  tpd,  the  feed  grade  approximately  330  g/t  Ag,  and  the  silver  recovery  is  in  the 87%  range.  The  intent  of  Maya  is  to  gradually  increase  the  Zgounder  mill  feed  rate  from  +/-­‐  200  tonnes  per  day to  2,000  tonnes  per  day.

First  step  is  to  increase  the  mill  feed  rate  to  500  tpd  (2018  -­‐2020)

•

  • Second  step  is  to  increase  the  mill  feed  rate  to  2,000  tpd  (2021  -­‐2027)

The  object  of  this  chapter  of  the  PEA  is  to  describe  in  broad  detail  the  mill  operation  at  500  and  2,000  tonnes  per day.    If  this  PEA  proves  successful,  the  500  tpd  operation  will  be  addressed  later  in  a  future  prefeasibility  study.

The  500  tpd  process  plant  is  designed  to  recover  the  silver  by  a  gravity-­‐flotation  process  followed  by  the  cyanide leaching  of  the  gravity  and  the  flotation  concentrates  in  two  different  mills.    The  “upper”  mill,  designed  by  Yantai Xinhai  Mining  Research  &  Design  Co.,  Ltd.    (Xinhai),  which  will  be  located  some  1,5  km  from  the  actual  mill  will incorporate  the  following  sections:    run  of  mine  mineralized  material  storage,  a  three  stage  crushing  plant,  two 500   tonne   fine   mineralized   material   bins,   a   two   stage   grinding   bay   integrating   gravity,   a   flotation   section followed  by  gravity  and  flotation  concentrates  thickening  and  regrinding  spaces.

The  “lower”  mill  (actual  Zgounder  mill),  will  essentially  remain  the  same  as  it  is  now  except  for  the  removal  of the  two  small  ball  mills  and  changing  of  the  present  clarifier  by  four  filter-­‐presses.    The  “lower”  mill  will  be  fed by  gravity  from  the  gravity-­‐flotation  concentrates  (cyclones  O/F)  coming  from  the  “upper”  mill.    The  expected mill  recovery  based  on  provided  met  test  is  set  to  80%.

For  the  2,000  tonnes  per  day  operation  (2021  –  2027),  ZMSM  will  need  a  complete  new  mill.    Mill  feed  averaging 233  g/t  (at  least  for  years  2021  to  2024)  will  come  from  3  different  locations.  Around  45%  will  come  from  the open  pit,  12%  from  the  old  tailings  and  the  other  43%  from  deep  underground-­‐mineralized  sectors.    To  have  a smooth  and  steady  operation  and  to  avoid  large  variations  in  feed  grade  and  quality,  the  design  criteria  for  the processing  plant  is  based  on  a  continuous  and  homogenous  feed  rate  from  all  sources.    The  2,000  tpd  processing plant  will  be  designed  to  recover  the  silver  mainly  by  cyanide  leaching  followed  by  a  CIP  (carbon  in  pulp)  process. The   mill   tentatively   proposed   by   Goldminds   Geoservices   Inc.   (GMG)   should   be   located   some   250m   from   the actual  200  tpd  mill  and  will  incorporate  the  following  sections:    run  of  mine  mineralized  material  storage,  a  one stage  crushing  plant,  two  fine  mineralized  material  bins,  a  two  stage  grinding  bay  integrating  gravity,  cyanide leaching  followed  by  carbon  adsorption,  carbon  elution  and  finally  refining.    The  expected  mill  recovery  based  on provided  met  test  with  a  complete  new  mill  is  set  to  90%.  Additional  metallurgical  testing  is  required  to  validate all  parameters  of  the  proposed  process.

Mill   rejects   should   undergo   cyanide   destruction   before   disposal   into   the   tailings   pond   or   will   be   naturally destroyed  in  the  pond.  GMG  is  of  the  opinion  that  the  new  conceptual  tailings  pond  has  the  capacity  to  store  the whole  mine  life  production  of  this  PEA,  that  is  to  say  during  the  next  ten  years  of  operation.  Additional  work  will need  to  be  done  to  validate  the  conceptual  design.

Supernatant  from  the  tailings  ponds  will  flow  by  gravity  to  a  small  polishing  pond,  where  it  will  be  treated  if necessary,  and  approximately  80%  will  be  pumped  back  to  the  mill.    The  other  20%,  free  of  any  cyanide,  will  be discharged  in  the  valley  connected  to  the  small  Zgounder  River.

Infrastructure

The   energy   is   coming   from   a   new   power   line   rating   22   KV,   having   a   power   of   2500   KVA,   is   expected   to   be powerful  enough  for  the  milling  operation  of  the  500  tpd.  Subsequently,  for  the  2000  tpd  mill,  a  new  line  will have  to  be  installed  from  Taliouine  and  preliminary  discussions  with  the  Office  National  of  Energy  (ONE)  set  the total  Capex  to  US3.5  million.

A  new  water  line  will  have  to  be  installed  for  the  2000  tpd  mill  upgrade  and  there  is  a  provision  in  the  Capex  for this.  As  well,  the  existing  tailings  will  be  reinforced  and  modified  to  accommodate  the  whole  mine  life  of  the PEA.  A  polishing  pond  with  water  containment  of  450,000  cubic  meter  is  planned  to  assist  in  the  management  of recycle  water.  Provision  for  a  water  treatment  plant  near  the  polishing  pond  has  been  done.

A  provision  in  the  Capex  exists  for  the  expansion  of  the  existing  accommodation  camp  will  be  required  to  lodge the  additional  workforce  (the  staff  and  mining  contractors).

Qualified  Persons  

The  technical  content  of  this  news  release  has  been  prepared  and  reviewed  by  Claude  Duplessis  Eng.,  Gilbert Rousseau  Eng.  and  Dr.  Merouane  Rachidi  P.  Geo.  from  GoldMinds  Geoservices  Inc.:  both  independent  Qualified Persons  under  NI  43-­‐101  standards.

Forward-­‐looking  statements  

This  news  release  contains  statements  about  our  future  business  and  planned  activities.  These  are  "forward-­‐ looking"   because   we   have   used   what   we   know   and   expect   today   to   make   a   statement   about   the   future. Forward-­‐looking   statements   including   but   are   not   limited   to   comments   regarding   the   timing   and   content   of upcoming   work   and   analyses.   Forward-­‐looking   statements   usually   include   words   such   as   may,   intend,   plan, expect,  anticipate,  and  believe  or  other  similar  words.  We  believe  the  expectations  reflected  in  these  forward-­‐ looking  statements  are  reasonable.  However,  actual  events  and  results  could  be  substantially  different  because of  the  risks  and  uncertainties  associated  with  our  business  or  events  that  happen  after  the  date  of  this  news release.  You  should  not  place  undue  reliance  on  forward-­‐looking  statements.  As  a  general  policy,  we  do  not update  forward-­‐looking  statements  except  as  required  by  securities  laws  and  regulations.

Maya  Gold  &  Silver  Inc.

Noureddine  Mokaddem President  and  CEO +1  514-­‐978-­‐6111/+212  661-­‐196-­‐111 [email protected]

Maya  Gold  &  Silver  Inc.

Sophy  Cesar Investor  Relations 514-­‐866-­‐2008 [email protected] www.mayagoldsilver.com