Thursday, October 22, 2026
MiningNewsTerminal
Thursday, October 22, 2026 Admin

AHR.V ·

New Assay Results from Newton Gold Discovery – Delineation Drilling Continues

Drill Results Resource Estimates Exploration Programs

February 8, 2012 ‐ Vancouver, BC ‐ Amarc Resources Ltd. (“Amarc” or the “Company”) (TSXV: AHR; OTCBB:  AXREF)  is  pleased  to  announce  assay  results  from  the  last  three  delineation  drill  holes completed in 2011 at the Newton gold discovery, south‐central British Columbia.  Assay results from drill holes 11053, 11054 and 11055 continue to confirm an extensive and robust gold system has been discovered at Newton. Delineation drilling has now recommenced at the Newton site with two rigs working.  Amarc plans to continue drilling until the deposit is fully delineated.

The long intercepts of bulk tonnage style gold mineralization encountered in holes 11053 through 11055 bring the number of holes drilled with important gold results to 46.  These holes are located over an area that currently measures 900 metres by 600 metres and is open to expansion in several directions.  The age and geological characteristics of the gold mineralization at Newton demonstrate striking  similarities  to  the  mineralization  at  New  Gold’s  Blackwater  deposit  located  to  the  north. Amarc (TSXV: AHR; OTCBB: AXREF) owns an 80% interest in the Newton property and is the operator of the Newton Joint Venture.  Newton Gold Corp. (TSXV: NWG) has a 20% participating interest.

Results from holes 11053, 11054 and 11055 are summarized in the Table of Assay Results below.   A drill plan and other information regarding the Newton Project are available on Amarc’s website at http://www.amarcresources.com/ahr/MapsFigures.asp.

NEWTON PROJECT  TABLE OF ASSAY RESULTS 

Drill HoleIncl.FromToInt.AuAgAuEQ1
ID(m)(m)(m)(g/t)(g/t)(g/t)
110537994150.471.90.50
11053166187210.651.40.67
11053235271360.871.50.90
11053incl.23523833.581.43.60
11053and25625934.893.54.95
11053445475300.641.00.66
11054434423990.502.40.54
11055301511210.702.40.74
11055incl.78151730.862.00.90
11055238286480.572.80.62

1. Gold equivalent calculations use metal prices of Au US$1200/oz and Ag US$20/oz. Metallurgical recoveries and net smelter returns are assumed to be 100%.

2. All holes are drilled vertically.

3. Widths reported are drill widths, such that true thicknesses are unknown.  All assay intervals represent length weighted averages.

Amarc  Executive  Chairman  Robert  Dickinson  said,  “We  are  increasingly  confident  that  ongoing  drilling  at  Newton will confirm this deposit as the next major gold discovery in BC’s emerging Blackwater‐Newton gold  belt.”

‐2‐ Amarc  drilling  is  intersecting  increased  thicknesses  of  pervasively  altered  felsic  volcanic  rocks  that  host disseminated  sulphides  and  associated  gold  mineralization.  It  is  the  high  primary  permeability  of  these favourable  host  rocks,  coupled  with  evidence  for  their  expanding  geographic  distribution  that  presents  a permissive environment for the development of a major bulk tonnage‐style gold deposit.

The  Newton  property  is  located  some  100  kilometres  west  of  the  City  of  Williams  Lake,  BC  in  a  region characterized  by  gently  rolling  hills.  The  district  is  well  served  by  existing  transportation  and  power infrastructure  and  a  skilled  workforce,  which  support  a  number  of  operating  mines,  as  well  as  late‐stage mineral development and exploration projects.  Newton is located approximately 175 kilometres south of New Gold’s Blackwater gold deposit (Indicated Resources of 164 million tonnes at an average grade of 1.03 g/t gold containing 5.42 million ounces; and Inferred Resources of 69 million tonnes at an average grade of 0.84 g/t gold containing 1.86 million ounces; New Gold news release February 2, 2012).

In  addition  to  the  Newton  project,  Amarc  also  owns  a  100%  interest  in  the  800  square  kilometre  Galileo property and the 140 square kilometre Hubble property located to the west and east, respectively, of New Gold’s Blackwater property.  Extensive Induced Polarization geophysical surveys recently conducted by Amarc over these two properties indicate strong potential for six important new sulphide mineralized systems.

Four of the  defined target areas have similar dimensions to, or exceed  that, of the eight square kilometre sulphide system at Newton.  Drill permit applications have been submitted to the provincial government in order to test these promising targets for potential gold and/or copper deposits.  Once permits are received, Amarc plans to methodically drill test all of the compelling targets identified at Galileo and Hubble.

The Galileo and Hubble properties lie approximately 135 kilometres southwest of the town of Vanderhoof and 176 kilometres southwest of northern BC’s regional hub city of Prince George.  The area is characterized by subdued topography, existing transportation and power infrastructure and a skilled workforce which supports an active mineral exploration industry.

About Amarc Resources Ltd.

Amarc is a Vancouver‐based mineral exploration and development company focused on making the next major gold  discovery  in  BC.  Its  exploration  activities  are  focused  on  the  Newton  gold  discovery  through  a  Joint Venture  with  Newton  Gold  Corp.  (Amarc  80%:  Newton  Gold  Corp.  20%)  and  its  100%  owned  Galileo  and Hubble properties.

Amarc is associated with Hunter Dickinson Inc. (HDI) – a diversified, global mining group with a 25‐year history of  mineral  development  success.  Previous  HDI  projects  in  BC  include  Golden  Bear,  Mt.  Milligan,  Kemess, Gibraltar,  Prosperity  and  Harmony.    From  its  head  office  in  Vancouver,  Canada,  HDI  applies  its  unique strengths  and  capabilities  to  acquire,  develop,  operate  and  monetize  mineral  properties  to  provide consistently superior returns to shareholders.

Mark Rebagliati, P.Eng., a Qualified Person as defined under National Instrument 43‐101, is supervising the exploration  and  quality  assurance  and  quality  control  programs  on  behalf  of  Amarc  and  has  reviewed  the technical content of this release.

‐3‐

Quality Assurance/Quality Control

Sample preparation and analysis for the Newton project is done at ISO 9001:2008 accredited Acme Analytical Laboratories (Vancouver) Ltd. All samples are assayed for gold by 30 g lead collection fire assay fusion with Inductively  Coupled  Plasma  ‐  Emission  Spectroscopy  (ICP‐ES)  finish.  Silver  and  33  additional  elements  are determined for all samples by Aqua Regia digestion, followed by ICP‐ES and ICP Mass Spectroscopy (ICP‐MS) finish. All over‐limit gold (greater than 10 g/t) are re‐assayed by 30 g lead collection fire assay fusion with a gravimetric  finish.  As  part  of  a  comprehensive  QA/QC  program,  one  standard  and  also  one  preparation duplicate are inserted into the sample stream in each group of 20 samples, as well as one or more field blanks in each analytical batch.

For further details on Amarc Resources Ltd., please visit the Company’s website at www.amarcresources.com or contact Investor Services at (604) 684‐6365 or within North America at 1‐800‐667‐2114.

ON BEHALF OF THE BOARD

Ronald W. Thiessen President & CEO

Neither the TSX Venture Exchange nor any other regulatory authority accepts responsibility for the adequacy or accuracy of this release.

Forward Looking and other Cautionary Information

This release includes certain statements that may be deemed "forward‐looking statements". All statements in this release, other than statements of historical  facts  that  address  exploration  drilling,  exploitation  activities  and  other  related  events  or  developments  are  forward‐looking  statements. Although the Company believes the expectations expressed in such forward‐looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward looking statements. Factors that could cause actual results to differ materially from those in forward‐looking statements  include market prices, potential environmental issues  or  liabilities  associated  with  exploration,  development  and  mining  activities,  exploration  and  exploitation  successes,  continuity  of mineralization, uncertainties related to the ability to obtain necessary permits, licenses and title and delays due to third party opposition, changes in and the effect government policies regarding mining and natural resource  exploration and exploitation, continued availability of capital and financing, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward‐looking statements. For more information on Amarc Resources Ltd., investors should review the Company's annual Form 20‐F filing with the United States Securities and Exchange Commission at www.sec.gov and its home jurisdiction filings that are available at www.sedar.com.