Mine Development & Operations
Early version: each row is read automatically from the headline of a release tagged Mine Development & Operations, and some rows are wrong. Every row links to its release.
| Ticker | Company | Date | Event | Mine / project | Status | Headline | View |
|---|---|---|---|---|---|---|---|
| EFR.TO | Energy Fuels Inc. | 2024-05-03 | Ramp-up | — | Underway | Energy Fuels Announces Q1-2024 Results, Including Continued Net Income, Continued Successful Uranium Ramp-Up, Commissioning Rare Earth Oxides Production, and Steps to Secure World-Scale Sources of Heavy Mineral Sands and Monazite | View ↗ |
| RCK.V | Rock Tech Lithium Inc | 2024-04-30 | Offtake | Guben Project | Achieved | Rock Tech Lithium announces feedstock supply agreement with C&D Logistics (Qingdao) Co., Ltd., a supply chain enterprise under the C&D Group, a Fortune Global 500 member. | View ↗ |
| EDV.TO | Endeavour Mining plc | 2024-04-29 | First production | Sabodala-Massawa Complex | Achieved | ENDEAVOUR ACHIEVES FIRST GOLD POUR AT SABODALA- MASSAWA EXPANSION | View ↗ |
| AFM.V | Alphamin Resources Corp. | 2024-04-29 | Commissioning | — | Underway | PERRIERI OFFICE SUITES, C2-302, Level 3, Office Block C, La Croisette, Grand Baie 30517, Mauritius ALPHAMIN FILES Q1 FINANCIAL STATEMENTS AND MD&A AND PROVIDES MPAMA SOUTH COMMISSIONING UPDATE | View ↗ |
| ARTG.V | Artemis Gold Inc | 2024-04-24 | Construction progress | Blackwater Mine | Underway | Artemis Gold Provides Q1 Update on Blackwater Mine Construction Progress Project remains fully funded, on schedule, approximately 73% complete, within guidance for initial capital expenditure, and is advancing operational readiness | View ↗ |
| TECK.B.TO | Teck Resources Limited | 2024-04-24 | Ramp-up | — | Achieved | Teck Reports Unaudited First Quarter Results for 2024 Increasing copper production with QB ramp-up and completion of all major construction | View ↗ |
| EDR.TO | Endeavour Silver Corp. | 2024-04-23 | Construction progress | Terronera Project | Underway | Endeavour Silver Provides Q1 2024 Construction Progress Update on Terronera; Construction Progress Reaches 53% Completion | View ↗ |
| EDR.TO | Endeavour Silver Corp. | 2024-04-22 | Construction progress | — | Underway | Endeavour Silver Celebrates Milestone: Terronera Surpasses 50% Construction Completion | View ↗ |
| GMIN.TO | G Mining Ventures Corp. | 2024-04-11 | Construction progress | Gminf Project | Underway | G Mining Ventures Provides Tocantinzinho Project Update | View ↗ |
| EQX.TO | Equinox Gold Corp | 2024-04-09 | Commissioning | Greenstone Project | Underway | Equinox Gold Commences Processing Ore at Greenstone Project: First Gold Pour on Track for Q2 2024 | View ↗ |
| EQX.TO | First production | Greenstone Project | Planned | ||||
| AEC.V | Anfield Energy Inc. | 2024-04-09 | Restart | Shootaring Canyon Mill | Planned | Anfield Energy Achieves Significant Milestone to Recommence Uranium Production at Shootaring as the Company Submits its Mill Reactivation Plan to the State of Utah, Which Includes a Tripling of Licensed Production Capacity | View ↗ |
| AFM.V | Alphamin Resources Corp. | 2024-04-09 | Commissioning | Mpama South Project | Underway | PERRIERI OFFICE SUITES, C2-302, Level 3, Office Block C, La Croisette, Grand Baie 30517, Mauritius ALPHAMIN ANNOUNCES Q1 EBITDA GUIDANCE OF US$52 MILLION/ MPAMA SOUTH COMMISSIONING UPDATE | View ↗ |
| CS.TO | Capstone Copper | 2024-04-09 | Commissioning | — | Underway | Capstone Copper Provides MVDP Commissioning Update; | View ↗ |
| NIM.V | Nicola Mining Inc | 2024-04-05 | Construction start | Cement Plant | Achieved | Nicola Mining and Lower Nicola Site Services Commence Construction of Cement Plant to Service Infrastructure Projects | View ↗ |
| STS.V | South Star Battery Metals Corp. | 2024-04-03 | Construction progress | Santa Cruz Project | Underway | South Star Battery Metals Announces 2023 Year in Review, Santa Cruz Construction Update, Qualification for Corporate Income Tax Exclusion and 2024 Catalysts | View ↗ |
| IMG.TO | IAMGOLD Corporation | 2024-03-31 | First production | Côté Gold Mine | Achieved | IAMGOLD ANNOUNCES FIRST GOLD POUR AT CÔTÉ GOLD | View ↗ |
| SGML.V | Sigma Lithium Corporation | 2024-03-30 | Construction decision | — | Achieved | SIGMA LITHIUM ANNOUNCES FINAL INVESTMENT DECISION AND INITIATION OF CONSTRUCTION TO DOUBLE PRODUCTION CAPACITY TO 520,000t/y Reports Unaudited Financial Information For 4Q23 And Full Year 2023 (All Figures in US$) FINAL INVESTMENT DECISION: CONSTRUCTION OF PHASE 2 INDUSTRIAL PLANT | View ↗ |
| NICU.V | Magna Mining Inc | 2024-03-27 | Offtake | Crean Hill Project | Achieved | Magna Mining Announces the Signing of a Definitive Off-Take Agreement for the Crean Hill Project | View ↗ |
| CCMI.V | Canadian Critical Minerals Inc | 2024-03-21 | Commissioning | Bull River Mine | Achieved | Canadian Critical Minerals Completes Commissioning of Ore Sorter at Bull River Mine Project | View ↗ |
| KNT.TO | K92 Mining Inc. | 2024-03-19 | Restart | — | Achieved | K92 MINING PROVIDES OPERATIONS UPDATE | View ↗ |
| TSK.TO | Talisker Resources Ltd | 2024-03-12 | Offtake | Afton Mine | Achieved | Talisker Signs Definitive Ore Purchase Agreement with New Gold Inc. | View ↗ |
| GORO.V | Goldgroup Mining Inc | 2024-03-07 | Incidentfatality | Cerro Prieto Mine | Achieved | Goldgroup Reports Contractor Fatality at Cerro Prieto Mine | View ↗ |
| GLO.TO | Global Atomic Corporation | 2024-03-05 | Offtake | Dasa Project | Achieved | Global Atomic Updates its Dasa Project Feasibility Study and Announces Off-Take Agreement | View ↗ |
| EU.V | enCore Energy Corp. | 2024-03-05 | Shipment / sale | — | Achieved | enCore Energy Announces First Shipment and Delivery of Uranium; Continues to Address Critical Shortage of Domestic Uranium Supply to Fuel Nuclear Energy | View ↗ |
| GAU.TO | Galiano Gold Inc | 2024-03-03 | Incidentother | Asanko Gold Mine | Achieved | GALIANO GOLD REPORTS AN INCIDENT AT A MINING LEASE OWNED BY THE ASANKO GOLD MINE | View ↗ |
| ISO.TO | IsoEnergy | 2024-02-29 | Restart | Tony M Mine | Underway | IsoEnergy Provides Update on its U.S. Mine Restart Plans with Advancement of the Tony M Mine in Utah | View ↗ |
| EDV.TO | Endeavour Mining plc | 2024-02-28 | Incidentfatality | Mana Mine | Achieved | ENDEAVOUR REPORTS FATAL ACCIDENT AT MANA MINE | View ↗ |
| EDV.TO | Suspension | Mana Mine | Achieved | ||||
| EDV.TO | Endeavour Mining plc | 2024-02-27 | Commissioning | — | Underway | ENDEAVOUR ANNOUNCES WET COMMISSIONING IS UNDERWAY AT SABODALA-MASSAWA BIOX® EXPANSION First gold expected in May · Project on schedule and on budget with no LTIs · 91% project completion | View ↗ |
| EFR.TO | Energy Fuels Inc. | 2024-02-23 | Ramp-up | — | Underway | Energy Fuels Announces 2023 Results: Record Net Income and Earnings per Share, Uranium Production Ramp-Up, and Near-Term Production of Separated Rare Earth Elements | View ↗ |
| ABI.V | Abcourt Mines Inc | 2024-02-20 | Restart | Sleeping Giant Mill | Achieved | Abcourt Announces the Restart of the Sleeping Giant Mill | View ↗ |
| SSRM.TO | SSR Mining Inc. | 2024-02-16 | Incidentother | Çöpler Mine | Achieved | SSR MINING PROVIDES AN UPDATE ON INCIDENT AT ÇÖPLER | View ↗ |
| BTO.TO | B2Gold Corp | 2024-02-15 | Incidentfatality | — | Achieved | B2Gold Reports Three Fatalities from Off-Site Incident in Mali | View ↗ |
| NOU.TO | Nouveau Monde Graphite Inc. | 2024-02-15 | Offtake | Phase-2 Matawinie Mine | Achieved | NMG and Panasonic Energy Announce Binding Offtake Agreement and US$25 Million Private Placement to Secure the Supply of Active Anode Material for North American Battery Production | View ↗ |
| NOU.TO | Nouveau Monde Graphite Inc. | 2024-02-15 | Offtake | Phase-2 Matawinie Mine | Achieved | NMG Announces Offtake Agreement with GM for Canadian Graphite and US$150 Million Equity Investment NMG is Developing What is Projected to Be the First Fully Integrated Source of Natural Graphite Active Anode Material in North America | View ↗ |
| SSRM.TO | SSR Mining Inc. | 2024-02-14 | Incidentother | — | Achieved | SSR MINING PROVIDES AN UPDATE ON INCIDENT AT ÇÖPLER | View ↗ |
| SSRM.TO | SSR Mining Inc. | 2024-02-13 | Suspension | Çöpler Mine | Achieved | SSR MINING ANNOUNCES SUSPENSION OF OPERATIONS AT ÇÖPLER | View ↗ |
| SSRM.TO | Incidentother | Çöpler Mine | Achieved | ||||
| LUN.TO | Lundin Mining Corporation | 2024-02-12 | Incidentfatality | Neves-Corvo Mine | Achieved | Lundin Mining Reports Fatality at Neves-Corvo Mine | View ↗ |
| LUN.TO | Suspension | Neves-Corvo Mine | Achieved | ||||
| TSK.TO | Talisker Resources Ltd | 2024-02-12 | Infrastructure | Mustang Mine | Achieved | Talisker Announces Completion of Decline Construction at the Mustang Mine | View ↗ |
| EDR.TO | Endeavour Silver Corp. | 2024-02-12 | Construction progress | Terronera Mine | Underway | Endeavour Silver Provides Q4 2023 Construction Progress Update On the Terronera Mine | View ↗ |
| LUCA.V | Luca Mining Corp | 2024-02-08 | Commissioning | Tahuehueto Gold Mine | Underway | Luca Mining Announces Final Commissioning Phase at the Tahuehueto Gold Mine, and the Appointment of New Director | View ↗ |
| NEXT.TO | NextSource Materials Inc. | 2024-02-05 | Commissioning | Molo Graphite Mine | Underway | NextSource Materials Provides Update on Molo Graphite Mine Commissioning | View ↗ |
| ARTG.V | Artemis Gold Inc | 2024-01-30 | Construction progress | Blackwater Mine | Underway | Artemis Gold Provides Q4 Update on Blackwater Mine Construction Progress Project Remains Fully Funded, Within Guidance for Initial Capital Expenditure, and on Schedule | View ↗ |
| CCI.CN | Canadian Copper Inc. | 2024-01-30 | Offtake | Credit Facility | Achieved | Canadian Copper Signs Offtake Agreement and Credit Facility with Ocean Partners | View ↗ |
| ERD.TO | Erdene Resource Development Corporation | 2024-01-29 | Construction start | Bayan Khundii Gold Project | Achieved | ERDENE COMMENCES CONSTRUCTION AT THE HIGH-GRADE BAYAN KHUNDII GOLD PROJECT AND FINALIZES STRATEGIC ALLIANCE WITH MONGOLIAN MINING CORPORATION | View ↗ |
| DML.TO | Denison Mines Corp. | 2024-01-24 | Restart | McClean Lake Mill | Planned | Orano Canada and Denison Announce JV Approval to Restart McClean Lake Mining Operations | View ↗ |
| IMG.TO | IAMGOLD Corporation | 2024-01-22 | Commissioning | Côté Gold Project | Underway | IAMGOLD REPORTS FOURTH QUARTER 2023 PRODUCTION RESULTS AND COMMISSIONING PROGRESS AT CÔTÉ GOLD | View ↗ |
| IVN.TO | Ivanhoe Mines | 2024-01-16 | Restart | Kipushi Mine | Planned | Ivanhoe Mines and Gécamines sign new joint venture to restart the ultra-high-grade Kipushi mine, a century since first opening | View ↗ |
| IVN.TO | Construction progress | Kipushi Mine | Underway | ||||
| TKO.TO | Trekor Metals Limited | 2024-01-16 | Construction progress | Florence Copper Project | Underway | Taseko Provides Financing and Construction Update for the Florence Copper Project | View ↗ |
| TRX.TO | TRX Gold Corporation | 2024-01-15 | Expansion | Results Mill | Underway | TRX Gold Reports First Quarter 2024 Results Mill Expansion Advances to Increase Gold Production | View ↗ |
| OMM.V | Omineca Mining and Metals Ltd. | 2024-01-15 | Restart | Wingdam Underground Placer Gold Project | Achieved | Omineca Announces Restart of Mining Operations at Wingdam Underground Placer Gold Project | View ↗ |
| ARS.CN | Ares Strategic Mining Inc. | 2024-01-09 | Contract | Ares Mine | Achieved | Ares Strategic Mining Contracts Provo Mining for Mine Preparation Activities and Mining | View ↗ |
| STGO.TO | Steppe Gold Ltd. | 2024-01-09 | Contract | ATO Gold Mine | Achieved | Steppe Gold Signs EPC Contract for Phase 2 ATO Expansion | View ↗ |
| IPT.V | IMPACT Silver Corp | 2024-01-09 | Contract | Plomosas Mine | Achieved | IMPACT Silver Contracts Bell Internacional to Provide Tesla Battery Energy System with Solar at the Plomosas Mine | View ↗ |
| AGMR.TO | Silver Mountain | 2024-01-09 | Restart | Reliquias Mine | Achieved | SILVER MOUNTAIN AND CASTROVIRREYNA COMMUNITY SIGN 20 YEAR AGREEMENT GRANTING USE OF LAND FOR THE PLANNED H1 2025 RESTART OF THE RELIQUIAS MINE | View ↗ |
| GMIN.TO | G Mining Ventures Corp. | 2024-01-08 | Commissioning | Tocantinzinho Project | Achieved | G Mining Ventures Completes Construction and Commissioning of 193 km Powerline at Tocantinzinho | View ↗ |
| APM.TO | Andean Precious Metals Corp | 2024-01-08 | Incidentfire | Golden Queen operation | Achieved | ANDEAN PRECIOUS METALS PROVIDES UPDATE FOLLOWING FIRE AT GOLDEN QUEEN’S SECONDARY CRUSHER CIRCUIT Repair schedule is well defined to re-establish normal course production; mitigation solutions implemented to minimize production losses | View ↗ |
| KUYA.CN | Kuya Silver Corporation | 2024-01-08 | Infrastructure | Bethania Silver Mine | Underway | Kuya Silver Commences Underground Development at the Bethania Silver Mine in Preparation for 2024 Production | View ↗ |
| ABX.TO | Barrick Mining Corporation | 2023-12-22 | Restart | — | Planned | RECOMMISSIONING STARTS AS PORGERA PREPARES TO RESUME OPERATIONS IN Q1 2024 | View ↗ |
| CS.TO | Capstone Copper | 2023-12-20 | Commissioning | — | Underway | Capstone Copper Announces Commissioning Activities Underway at MVDP and Provides Corporate Update | View ↗ |
| BLLG.CN | Blue Lagoon Resources Inc. | 2023-12-19 | Restart | Dome Mine | Achieved | Blue Lagoon Hits Major Milestone – Signs Mine Restart Agreement with the Lake Babine Nation | View ↗ |
| GGD.TO | GoGold Resources Inc. | 2023-12-19 | Construction progress | Parral Tailings Mine | Achieved | GoGold Completes Construction of Zinc Circuit at Parral and Releases Financial Results for 2023 | View ↗ |
| MKA.V | Mkango Magnetic Materials Limited | 2023-12-12 | First production | — | Achieved | First Production of Recycled Magnets at Tyseley Energy Park in Birmingham, UK Major Milestone for HyProMag | View ↗ |
| PHOS.CN | First Phosphate Corp. | 2023-12-11 | Commercial production | — | Achieved | First Phosphate and Ultion Technologies Enter MOU for Purchase of LFP / LFMP Commercial Production Technology and Offtake of 6,000 annual Tonnes of LFP Cathode Active Material for Specialty Products | View ↗ |
| PHOS.CN | Offtake | — | Achieved | ||||
| ABX.TO | Barrick Mining Corporation | 2023-12-10 | Restart | Porgera Gold Mine | Planned | PORGERA GOLD MINE SET TO RESTART PRODUCTION THIS MONTH | View ↗ |
| TSK.TO | Talisker Resources Ltd | 2023-12-04 | Infrastructure | Mustang Mine | Achieved | Talisker Announces Completion of the Portal and Initiation of Decline Construction at the Mustang Mine, Bralorne Gold Project | View ↗ |
| TOC.CN | Tocvan Ventures Corp. | 2023-11-30 | First production | Pilar Project | Achieved | Tocvan Pours First Doré Bar from Pilar Bulk Sample; Engages The Howard Group for Capital Markets and Corporate Communications | View ↗ |
| TOC.CN | Contract | Pilar Project | Achieved | ||||
| SGML.V | Sigma Lithium Corporation | 2023-11-27 | Shipment / sale | Grota do Cirilo Project | Achieved | SIGMA LITHIUM LOADS 22,000 TONNE SHIPMENT OF TRIPLE ZERO GREEN LITHIUM CONCENTRATE TO GLENCORE AT A PREMIUM PRICE | View ↗ |
| FM.TO | First Quantum Minerals | 2023-11-27 | Incidentfatality | — | Achieved | FIRST QUANTUM REPORTS FATALITIES AT KANSANSHI, SENTINEL OPERATIONS | View ↗ |
| BNKR.TO | Bunker Hill Mining Corp. | 2023-11-22 | Restart | Bunker Hill Mine | Underway | BUNKER HILL PROVIDES NOVEMBER 2023 RESTART PROJECT UPDATE | View ↗ |
| EQX.TO | Equinox Gold Corp | 2023-11-20 | Commissioning | Greenstone Project | Underway | Equinox Gold's Greenstone Project: 96% Complete, Commissioning Underway | View ↗ |
| LGO.TO | Largo Inc | 2023-11-08 | Shipment / sale | — | Achieved | Largo Reports Third Quarter 2023 Financial Results; Announces First Commercial Shipment of Ilmenite as By-Product of its Vanadium Operations in Brazil and Validation of its 6 MWh Vanadium Redox Flow Battery to Operate on Test Conditions in Spain | View ↗ |
| NGC.V | Northern Graphite Corporation | 2023-11-01 | Restart | — | Achieved | Northern Graphite Resumes Processing at North America's Only Producing Graphite Mine Amid Rising Market Demand Graphite Sales Volumes Rose Monthly Through the Third Quarter | View ↗ |
| SGML.V | Sigma Lithium Corporation | 2023-10-31 | Shipment / sale | Grota do Cirilo Project | Achieved | SIGMA LITHIUM RECEIVES FROM GLENCORE A 50% PREPAYMENT AT PREMIUM PRICES FOR ITS THIRD SHIPMENT OF 20,000 TONNES | View ↗ |
| CCO.TO | Cameco Corporation | 2023-10-29 | Offtake | — | Achieved | Cameco Marks Uranium Supply Agreement with China Nuclear International Corporation | View ↗ |
| EDR.TO | Endeavour Silver Corp. | 2023-10-26 | Construction progress | Terronera Project | Underway | Endeavour Silver Provides Q3 Construction Update on the Terronera Project; Construction Progress is Nearing 40% | View ↗ |
| ARTG.V | Artemis Gold Inc | 2023-10-24 | Construction progress | Blackwater Mine | Underway | Artemis Gold Provides Q3 Update on Blackwater Mine Construction Progress Project Remains Fully Funded, Within Guidance for Initial Capital Expenditure, and on Schedule | View ↗ |
| NEXT.TO | NextSource Materials Inc. | 2023-10-23 | Shipment / sale | Molo Graphite Mine | Achieved | NextSource Materials Announces First Bulk Shipment of SuperFlake® and Full Operation of its Solar Hybrid Plant at Molo Graphite Mine | View ↗ |
| ERO.TO | Ero Copper Corp. | 2023-10-19 | Construction progress | Tucumã Project | Underway | Ero Copper's Tucumã Project Achieves Major Milestone at Over 70% Physical Completion - On Track for First Copper Production in H2 2024 | View ↗ |
| BNKR.TO | Bunker Hill Mining Corp. | 2023-10-18 | Restart | Bunker Hill Mine | Underway | BUNKER HILL PROVIDES OCTOBER 2023 RESTART PROJECT UPDATE | View ↗ |
| LGO.TO | Largo Inc | 2023-10-17 | Commissioning | — | Underway | Largo Reports Third Quarter 2023 Production and Sales Results and Begins Hot Commissioning of its 6.1 MWh Vanadium Redox Flow Battery; Production and Cost Guidance Remains Unchanged Q3 2023 and Other Highlights | View ↗ |
| SF.V | Safi Silver Corp. | 2023-10-16 | Commercial production | Kombat Mine | Achieved | Trigon Metals Achieves Commercial Production Milestone at Kombat Mine | View ↗ |
| TSK.TO | Talisker Resources Ltd | 2023-10-16 | Infrastructure | Bralorne Gold Project | Achieved | Talisker Initiates Entry Portal Construction at the Bralorne Gold Project | View ↗ |
| SGML.V | Sigma Lithium Corporation | 2023-10-16 | Shipment / sale | Grota do Cirilo Project | Planned | SIGMA LITHIUM READIES THIRD SHIPMENT OF 20,000 TONNES OF TRIPLE ZERO GREEN LITHIUM AT PORT BY OCTOBER 20TH | View ↗ |
| ABX.TO | Barrick Mining Corporation | 2023-10-13 | Restart | Porgera Mine | Achieved | Special Mining Lease Signals Porgera Restart | View ↗ |
| PAAS.TO | Pan American Silver Corp | 2023-10-11 | Restart | La Colorada Mine | Underway | Pan American Silver provides an update on the restart of operations at the La Colorada mine | View ↗ |
| LIO.V | Lion One Metals Limited | 2023-10-10 | First production | Tuvatu Mine | Achieved | Lion One Pours First Gold at Tuvatu Mine in Fiji | View ↗ |
| LIO.V | Commissioning | Tuvatu Mine | Underway | ||||
| NKL.V | Nickel 28 Capital Corp | 2023-10-10 | Suspension | Ramu Mine | Achieved | RAMU PAUSES OPERATIONS FOLLOWING EARTHQUAKE IN MADANG PROVINCE | View ↗ |
| NKL.V | Incidentother | Ramu Mine | Achieved | ||||
| ARS.CN | Ares Strategic Mining Inc. | 2023-10-10 | Commissioning | Lost Sheep Fluorspar Project | Achieved | Ares Strategic Mining Contracts Completes Construction and Commissioning Permitting Process | View ↗ |
| KUYA.CN | Kuya Silver Corporation | 2023-10-10 | Contract | San Valentin Plant | Achieved | Kuya Silver Signs Toll Milling Agreement with Nearby San Valentin Plant and Outlines Plans for Bethania Development | View ↗ |
| SF.V | Safi Silver Corp. | 2023-10-05 | Shipment / sale | Trigon Metals Kombat Mine | Achieved | Trigon Metals Kombat Mine Ships First Copper Concentrate | View ↗ |
| SF.V | First production | Trigon Metals Kombat Mine | Achieved | ||||
| CCMI.V | Canadian Critical Minerals Inc | 2023-10-05 | Offtake | Bull River Mine | Achieved | Canadian Critical Minerals Inc. Signs Ore Purchase Agreement with New Afton | View ↗ |
| PAAS.TO | Pan American Silver Corp | 2023-10-05 | Suspension | La Colorada Mine | Achieved | Pan American Silver Temporarily Suspends Operations at the La Colorada Mine | View ↗ |
| TRX.TO | TRX Gold Corporation | 2023-10-02 | Expansion | Buckreef Gold Project | Underway | TRX Gold Advances Mill Expansion to Increase Gold Production New Ball Mill Arrived on Site | View ↗ |
| IMG.TO | IAMGOLD Corporation | 2023-09-29 | Incidentfatality | Côté Gold Project | Achieved | IAMGOLD REPORTS NON-WORK RELATED FATALITY AT CÔTÉ GOLD PROJECT | View ↗ |
| XIM.V | Ximen Mining Corp. | 2023-09-26 | Infrastructure | Kenville Gold Mine | Underway | Ximen Mining Provides Status Update of Activities prior to commencement of underground development at its 100% Owned Kenville Gold Mine | View ↗ |
| MMY.V | Monument Mining Limited | 2023-09-22 | Commercial production | Selinsing Gold Mine | Achieved | Monument Achieves Commercial Production at Selinsing Gold Mine | View ↗ |
| SGML.V | Sigma Lithium Corporation | 2023-09-21 | Shipment / sale | Grota do Cirilo Project | Achieved | SIGMA LITHIUM ANNOUNCES SHIPMENT OF 22,500 TONNES OF TRIPLE ZERO GREEN LITHIUM TO GLENCORE IN JOINT EFFORT TO BUILD A SUSTAINABLE GLOBAL SUPPLY CHAIN BUILDING A SUSTAINABLE GLOBAL LITHIUM SUPPLY CHAIN | View ↗ |
| AGX.V | Silver X Mining Corp. | 2023-09-19 | Restart | Nueva Recuperada Project | Underway | Silver X Resumes Operations at Nueva Recuperada; Provides Update on Management Transition | View ↗ |
| IVN.TO | Ivanhoe Mines | 2023-09-18 | Incidentfatality | Kamoa-Kakula Copper Complex | Achieved | Ivanhoe Mines reports fatality at the Kamoa-Kakula Copper Complex | View ↗ |
| IVN.TO | Suspension | Kamoa-Kakula Copper Complex | Achieved | ||||
| BTO.TO | B2Gold Corp | 2023-09-18 | Construction progress | Goose Project | Underway | B2Gold Provides Construction Update for the Goose Project in Nunavut, Canada; Construction on Budget and on Track to Pour First Gold in Q1 2025 | View ↗ |
| SCZ.V | Santacruz Silver Mining Ltd | 2023-09-15 | Incidentfatality | Zimapan Mine | Achieved | Santacruz Silver Reports Fatality at its Zimapan Mine in Mexico | View ↗ |
| ARS.CN | Ares Strategic Mining Inc. | 2023-09-14 | Contract | — | Achieved | Ares Strategic Mining Contracts SFC Tec to Complete Processing Plant Construction and Commissioning | View ↗ |
| ARS.CN | Construction progress | — | Achieved | ||||
| GMIN.TO | G Mining Ventures Corp. | 2023-09-12 | Construction decision | Tocantinzinho Project | Achieved | G Mining Ventures Provides Tocantinzinho Project Update on Anniversary of Construction Decision | View ↗ |
| EDG.V | Endurance Gold Corporation | 2023-09-11 | Incidentweather | Reliance Gold Project | Achieved | ENDURANCE REPORTS EVACUATION ORDER LIFTED - DRILLING TO RESUME AT THE RELIANCE GOLD PROJECT | View ↗ |
| IFOS.V | Itafos Inc. | 2023-09-07 | Offtake | — | Achieved | ITAFOS ENTERS INTO MONOAMMONIUM PHOSPHATE OFFTAKE AGREEMENT | View ↗ |
| FVI.TO | Fortuna Mining Corp. | 2023-09-07 | Commissioning | Séguéla Gold Mine | Underway | Fortuna announces successful completion of process plant performance test at the Séguéla Gold Mine, Côte d´Ivoire | View ↗ |
| SXTY.CN | Sixty North Gold Mining Ltd | 2023-08-24 | Incidentweather | Mon Property | Achieved | WILDFIRE IMPACT ON SIXTY NORTH GOLD’S MON PROPERTY, YELLOWKNIFE, NWT | View ↗ |
| YGT.V | Gold Terra Resource Corp | 2023-08-17 | Incidentweather | Con Mine | Achieved | Gold Terra Provides Update on Yellowknife Wildfire Evacuation and Campbell Shear Target below the Con Mine, Con Mine Option Property, NWT | View ↗ |
| MSA.TO | Mineros S.A | 2023-08-15 | Restart | Hemco Property | Achieved | Resumption of Operations at Hemco Property in Nicaragua | View ↗ |
| ARTG.V | Artemis Gold Inc | 2023-08-15 | Construction progress | Blackwater Mine | Underway | Artemis Gold Reports Q2 2023 Financial Results and Provides Construction Progress Update | View ↗ |
| GSVR.V | Guanajuato Silver Company Ltd. | 2023-08-14 | Incidentfatality | San Ignacio Mine | Achieved | Guanajuato Silver Reports Fatal Accident at San Ignacio Mine | View ↗ |
| SF.V | Safi Silver Corp. | 2023-08-10 | Restart | Kombat Mine | Achieved | Trigon Restarts Concentrate Production at Kombat Mine, Namibia | View ↗ |
| TTX.CN | TTX.CN | 2023-08-10 | Commissioning | TiTan Project | Underway | TANTALEX LITHIUM ANNOUNCES START OF COMMISSIONING ON ITS TiTAN TIN AND TANTALUM PLANT | View ↗ |
| LGO.TO | Largo Inc | 2023-08-09 | Commissioning | — | Underway | Largo Reports Second Quarter 2023 Financial Results, Including Further Progress on its Cost Reduction Initiatives and Commissioning of its Ilmenite Production as a By-Product of its Vanadium Operations | View ↗ |
| STS.V | South Star Battery Metals Corp. | 2023-08-09 | Construction progress | Santa Cruz Graphite Mine | Underway | South Star Battery Metals Announces Santa Cruz Graphite Mine Phase 1 Construction and Licensing Update | View ↗ |
| ARTG.V | Artemis Gold Inc | 2023-08-03 | Restart | Blackwater Mine | Achieved | Artemis Gold Returns to Full Construction at Blackwater | View ↗ |
| MSA.TO | Mineros S.A | 2023-08-02 | Suspension | Hemco Property | Achieved | Temporary suspension of the main milling plant at the Hemco Property in Nicaragua | View ↗ |
| IPT.V | IMPACT Silver Corp | 2023-08-01 | Restart | Zinc-Silver Plomosas Property | Underway | IMPACT Silver Provides Construction Update at the High-Grade Zinc-Silver Plomosas Property, Mexico | View ↗ |
| GAL.V | Galantas Gold Corporation | 2023-08-01 | Restart | Omagh Gold Project | Underway | GALANTAS GOLD PROVIDES PROGRESS UPDATE ON THE OMAGH GOLD PROJECT RESTART MINE PLAN | View ↗ |
| EQX.TO | Equinox Gold Corp | 2023-08-01 | Construction progress | Greenstone Project | Underway | Equinox Gold's Greenstone Project: On Schedule, On Budget | View ↗ |
| SGML.V | Sigma Lithium Corporation | 2023-07-27 | Shipment / sale | Grota do Cirilo Project | Achieved | SIGMA LITHIUM REACHES SECOND SHIPMENT TARGET OF 15,000 TONNES OF TRIPLE ZERO GREEN LITHIUM AT PORT; CLOSES EXPORT REVOLVER CREDIT LINE WITH SANTANDER FOR US$10M; REPORTS SECOND QUARTER 2023 RESULTS OPERATIONAL UPDATE | View ↗ |
| BNKR.TO | Bunker Hill Mining Corp. | 2023-07-27 | Construction start | Bunker Hill Mine | Achieved | BUNKER HILL RECOMMENCES CONSTRUCTION ACTIVITIES, REMAINS ON SCHEDULE AND BUDGET FOR MINE RESTART IN Q4 2024 | View ↗ |
| TECK.B.TO | Teck Resources Limited | 2023-07-26 | First production | — | Achieved | Teck Reports Unaudited Second Quarter Results for 2023 First copper concentrate sold and ramp-up advancing at QB2 | View ↗ |
| TECK.B.TO | Ramp-up | — | Underway | ||||
| ARG.TO | Amerigo Resources Ltd. | 2023-07-25 | Restart | — | Achieved | Amerigo Resumes Full Production at MVC Repairs completed at MVC | View ↗ |
| PHNM.V | Phenom Resources Corp | 2023-07-24 | Offtake | Carlin Vanadium Project | Achieved | Phenom Signs Offtake Agreement with Japanese Vanadium Solid-State Battery Company And Gains a 5% Equity Interest | View ↗ |
| EDR.TO | Endeavour Silver Corp. | 2023-07-20 | Construction progress | Terronera Project | Underway | Endeavour Silver Provides Q2 Construction Update on the Terronera Project as Activity Ramps Up | View ↗ |
| LGO.TO | Largo Inc | 2023-07-19 | Commissioning | Ilmenite Concentration Plant | Underway | Largo Reports Improvements to Production in Q2 2023 and Begins Commissioning of its Ilmenite Concentration Plant; Francesco D’Alessio Appointed as President of Largo Clean Energy Q2 2023 and Other Highlights | View ↗ |
| STGO.TO | Steppe Gold Ltd. | 2023-07-17 | Expansion | — | Underway | Steppe Gold Provides Second-Quarter Corporate Update Phase 2 Expansion Accelerating with Financing Secured | View ↗ |
| ARTG.V | Artemis Gold Inc | 2023-07-17 | Incidentweather | Blackwater Mine | Achieved | Artemis Gold Provides an Update on Impact of the Wildfires in Central B.C. on Blackwater Mine | View ↗ |
| LUC.TO | Lucara Diamond Corp | 2023-07-16 | Expansion | — | Underway | LUCARA PROVIDES KAROWE UNDERGROUND EXPANSION PROJECT UPDATE | View ↗ |
| LGO.TO | Largo Inc | 2023-07-15 | Incidentfatality | Maracás Menchen Mine | Achieved | Largo Reports Fatality Following Injuries Sustained at its Maracás Menchen Mine Chemical Plant | View ↗ |
| ARTG.V | Artemis Gold Inc | 2023-07-10 | Incidentweather | Blackwater Mine | Achieved | Artemis Gold Takes Precautionary Measures due to Wildfires in Central B.C. | View ↗ |
| SCZ.V | Santacruz Silver Mining Ltd | 2023-07-10 | Incidentfatality | Porco Mine | Achieved | Santacruz Silver Reports Fatality at its Porco Mine in Bolivia | View ↗ |
| CERT.V | Cerrado Gold Inc | 2023-07-10 | First production | Las Calandrias Project | Achieved | CERRADO GOLD ANNOUNCES FIRST GOLD POUR AT ITS LAS CALANDRIAS PROJECT IN SANTA CRUZ, ARGENTINA | View ↗ |
| KNT.TO | K92 Mining Inc. | 2023-07-06 | Restart | Kainantu Gold Mine | Achieved | K92 MINING RESUMES MINING OPERATIONS AT KAINANTU GOLD MINE | View ↗ |
| NEXT.TO | NextSource Materials Inc. | 2023-07-06 | Infrastructure | Molo Graphite Mine | Achieved | NextSource Materials Announces Completion of 2.6MW Solar Farm at Molo Graphite Mine in Madagascar | View ↗ |
| EMN.V | Euro Manganese Inc | 2023-06-30 | Contract | Chvaletice Manganese Project | Achieved | Euro Manganese Awards EPCM Contract to Wood Australia and Provides Update on Project Permitting | View ↗ |
| GAU.TO | Galiano Gold Inc | 2023-06-30 | Contract | Asanko Gold Mine | Achieved | GALIANO GOLD ANNOUNCES AWARD OF MINING CONTRACT AND PROVIDES AN UPDATE ON THE RECOMMENCEMENT OF MINING AT THE ASANKO GOLD MINE | View ↗ |
| GAU.TO | Restart | Asanko Gold Mine | Underway | ||||
| KNT.TO | K92 Mining Inc. | 2023-06-28 | Suspension | — | Achieved | K92 MINING ANNOUNCES Q3 PRODUCTION RESULTS WITH MULTIPLE MILL THROUGHPUT RECORDS AND FIRST ORE MINED FROM THE TWIN INCLINE AREA 2 MONTHS EARLIER THAN EXPECTED | View ↗ |
| PPTA.TO | Perpetua Resources Corp. (formerly Midas Gold Corp.) | 2023-06-28 | Site cleanup | Stibnite Gold Project | Achieved | Perpetua Resources Begins Next Phase of Cleanup Activities at Historical Mine Site | View ↗ |
| LIO.V | Lion One Metals Limited | 2023-06-28 | Construction progress | Tuvatu Gold Mine | Underway | Lion One: Tuvatu Gold Mine Construction Is 75% Complete | View ↗ |
| ARG.TO | Amerigo Resources Ltd. | 2023-06-26 | Suspension | — | Achieved | Amerigo Provides Update on MVC Operations | View ↗ |
| ARG.TO | Incidentweather | — | Achieved | ||||
| BTO.TO | B2Gold Corp | 2023-06-23 | Construction progress | Goose Project | Underway | B2Gold Provides Construction Update for the Goose Project in Nunavut, Canada | View ↗ |
| MMY.V | Monument Mining Limited | 2023-06-23 | Shipment / sale | Selinsing Gold Mine | Achieved | Monument Begins Gold Concentrate Shipments at Selinsing Gold Mine | View ↗ |
| NEXT.TO | NextSource Materials Inc. | 2023-06-22 | First production | Molo Mine | Achieved | NextSource Materials Announces First Production of SuperFlake® Graphite at Molo Mine in Madagascar | View ↗ |
| LTHM.CN | Champion Electric Metals Inc. | 2023-06-19 | Restart | — | Achieved | Champion Electric Resumes Operations at Its Lithium Project in James Bay, Quebec | View ↗ |
| LAR.TO | Lithium Argentina | 2023-06-12 | First production | Caucharí-Olaroz Project | Achieved | Lithium Americas Announces First Lithium as Part of Commissioning at Caucharí-Olaroz | View ↗ |
| CIA.TO | Champion Iron Limited | 2023-06-12 | Incidentweather | Bloom Lake Mine | Achieved | CHAMPION IRON ANNOUNCES RESUM PTION OF RAILWAY SERVICES FOLLOWING INTERRUPTIONS DUE TO FOREST FIRES IN QUÉBEC | View ↗ |
| WDO.TO | Wesdome Gold Mines Ltd | 2023-06-08 | Incidentweather | Kiena Mine | Achieved | Wesdome Provides Update on Operations Amidst Forest Fires in Quebec and Ontario | View ↗ |
| AUMN.TO | Golden Minerals Company | 2023-06-05 | Restart | Velardeña Properties | Planned | Golden Minerals Announces Restart of Silver and Gold Mining Operations at Velardeña and Provides Update on Capital Resources | View ↗ |
| FURY.TO | Fury Gold Mines Limited | 2023-06-05 | Incidentweather | Eau Claire Project | Achieved | Fury Temporarily Halts Work at Eau Claire Following Fire Evacuation Order | View ↗ |
| TLG.TO | Troilus Mining Corp. | 2023-06-05 | Incidentweather | Troilus Mine | Achieved | TROILUS PROVIDES UPDATE ON FOREST FIRE SITUATION IN NORTHERN QUEBEC | View ↗ |
| TLG.TO | Suspension | Troilus Mine | Achieved | ||||
| FVI.TO | Fortuna Mining Corp. | 2023-06-05 | Incidentfatality | Caylloma Mine | Achieved | Fortuna regrets to report a fatality at its Caylloma Mine in Peru | View ↗ |
| URE.TO | Ur-Energy Inc. | 2023-05-30 | Restart | Casper Centralized Services Facility | Achieved | Ur-Energy Announces Restart of Commercial Production and Completion of Casper Centralized Services Facility | View ↗ |
| FVI.TO | Fortuna Mining Corp. | 2023-05-25 | First production | Séguéla Mine | Achieved | Fortuna pours first gold at its Séguéla Mine in Côte d’Ivoire | View ↗ |
| AGX.V | Silver X Mining Corp. | 2023-05-24 | Ramp-up | — | Underway | Silver X Reports First Quarter 2023 Financial Results | View ↗ |
| LUCA.V | Luca Mining Corp | 2023-05-24 | Construction progress | Tahuehueto Gold Project | Underway | Luca Mining Corp. announces Tahuehueto Construction on Schedule and Digital Marketing Agreements | View ↗ |
| BNKR.TO | Bunker Hill Mining Corp. | 2023-05-23 | Restart | Bunker Hill Mine | Planned | BUNKER HILL ANNOUNCES UPSIZED AND IMPROVED $67 MILLION FINANCING PACKAGE TO ENABLE COMPLETION OF THE MINE RESTART, OFFTAKE AGREEMENT | View ↗ |
| BNKR.TO | Offtake | Bunker Hill Mine | Achieved | ||||
| S.TO | Sherritt International Corporation | 2023-05-17 | Incidentfatality | Moa Mine | Achieved | Sherritt Reports Fatality at its Moa Joint Venture Mine | View ↗ |
| STS.V | South Star Battery Metals Corp. | 2023-05-15 | Construction progress | Santa Cruz Graphite Mine | Underway | South Star Battery Metals Announces Corporate Update including Santa Cruz Graphite Mine Phase 1 Construction Update | View ↗ |
| CPS.V | Canadian Premium Sand Inc. | 2023-05-11 | Offtake | — | Achieved | STATES OF AMERICA Canadian Premium Sand Inc. Executes Multiple Commercial Off-take Agreements, Signs Turn-Key EPC Agreement, Enhances Executive Team and Board and Initiates Financing Process | View ↗ |
| CPS.V | Contract | — | Achieved | ||||
| CPS.V | Construction progress | — | Achieved | ||||
| FVI.TO | Fortuna Mining Corp. | 2023-05-11 | Incidentcommunity | San Jose Mine | Achieved | Fortuna confirms illegal blockade lifted and operations at the San Jose Mine have resumed | View ↗ |
| SF.V | Safi Silver Corp. | 2023-05-10 | Restart | Kombat Copper Project | Achieved | Trigon Metals Restarts Mining At The Kombat Copper Project Ahead Of Schedule | View ↗ |
| KNT.TO | K92 Mining Inc. | 2023-05-05 | Incidentfatality | — | Achieved | K92 MINING REPORTS VEHICULAR ACCIDENT OUTSIDE OF MINING LEASE AREA RESULTING IN TWO FATALITIES | View ↗ |
| ABX.TO | Barrick Mining Corporation | 2023-05-03 | Ramp-up | — | Underway | Ridge and the steady ramp-up of throughput at Pueblo Viejo’s expanded plant will boost production in the second half of the year and keep Barrick on track to achieve its 2023 guidance, the company said today. Reporting on the results for the first quarter, president and | View ↗ |
| FVI.TO | Fortuna Mining Corp. | 2023-05-02 | Incidentcommunity | San Jose Mine | Achieved | Fortuna reports an illegal blockade at the San Jose Mine, Mexico | View ↗ |
| FVI.TO | Suspension | San Jose Mine | Achieved | ||||
| ATY.V | Atico Mining Corporation | 2023-04-27 | Restart | El Roble Mine | Achieved | Atico Produces 2.32 Million Pounds of Cu and 2,566 Ounces of Au in First Quarter 2023 and Resumes Full Operations at El Roble | View ↗ |
| IVN.TO | Ivanhoe Mines | 2023-04-27 | Offtake | Kipushi Mine | Achieved | Ivanhoe Mines and Gécamines agree on off-take and financing terms to return the ultra-high-grade Kipushi Mine in the DRC to production | View ↗ |
| IVN.TO | Construction progress | Kipushi Mine | Underway | ||||
| SGML.V | Sigma Lithium Corporation | 2023-04-27 | Shipment / sale | Grota do Cirilo Project | Planned | SIGMA LITHIUM TRUCKS GREEN LITHIUM AND TAILINGS TO VITORIA PORT IN PREPARATION OF 15,000 TONNE SHIPMENT OF EACH PRODUCT IN MAY | View ↗ |
| ARS.CN | Ares Strategic Mining Inc. | 2023-04-25 | Construction progress | — | Achieved | Ares Strategic Mining Completes Rail Spur Construction, Opening Delivery Access Across the Country | View ↗ |
| LI.V | American Lithium Corp. | 2023-04-25 | Incidentother | Vehicle Accident Near Company Project | Achieved | American Lithium Reports Vehicle Accident Near Company Project in Peru | View ↗ |
| S.TO | Sherritt International Corporation | 2023-04-24 | Incidentfatality | Moa Mine | Achieved | Sherritt Reports Fatality at its Moa Joint Venture Mine | View ↗ |
| EDR.TO | Endeavour Silver Corp. | 2023-04-20 | Construction progress | Terronera Project | Underway | Endeavour Silver Provides Construction Update on the Terronera Project | View ↗ |
| APN.V | Altiplano Metals Inc. | 2023-04-19 | Offtake | Loan Facility | Achieved | Altiplano Announces Offtake Agreement and Loan Facility to Support Start Up at El Penon | View ↗ |
| EDR.TO | Endeavour Silver Corp. | 2023-04-18 | Construction decision | Terronera Project | Achieved | Endeavour Silver Announces Construction Decision for the Terronera Project in Jalisco State, Mexico; Executes Commitment Letter for Senior Secured Debt Facility of $120 Million | View ↗ |
| URE.TO | Ur-Energy Inc. | 2023-04-12 | Ramp-up | Lost Creek In-Situ Recovery Project | Underway | Ur-Energy Provides Q1 Update on Operations and Activities Supporting Ramp Up at Lost Creek | View ↗ |
| USA.TO | Americas Gold and Silver Corporation | 2023-04-12 | Incidentfatality | Galena Complex | Achieved | AMERICAS GOLD AND SILVER ANNOUNCES FATALITY AT GALENA COMPLEX IN IDAHO | View ↗ |
| USA.TO | Suspension | Galena Complex | Achieved | ||||
| ASM.TO | Avino Silver & Gold Mines Ltd. | 2023-04-05 | Incidentfatality | Avino Mine | Achieved | AVINO REPORTS FATAL ACCIDENT AT PROPERTY | View ↗ |