NexGen Announces Positive Results from Arrow Project Studies

Metallurgy & Processing

Vancouver, BC, June 13, 2018 – NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX:NXE, NYSE MKT:NXE) is pleased to report the positive results from Pre‐Feasibility‐stage technical studies including metallurgical, geotechnical, and hydrogeological assessments. These studies were conducted on the basement‐hosted Arrow Deposit, located on the Company’s 100% owned Rook I project in Saskatchewan’s Athabasca Basin.

Highlights: 

Metallurgical Study 

The Bench‐Scale Metallurgical Study has demonstrated high purity yellowcake product can be produced by using peroxide and MgO. The final product, produced yellowcake, meeting or surpassing industry standards.

  • High recovery rates confirmed. 
    • Leaching test samples representing anticipated typical mill feed resulted in 97.6% of uranium  was recovered.
    • Optimized solvent extraction (“SX”) resulted in 99.6% of uranium extracted.
  • Strength tests meet or exceed all requirements set forth in the original design for a potential Paste‐ Backfill to be used for underground stope stability.
    • Paste‐Backfill  samples  composed  of  representative  uranium  tailings  mixed  with  binder, underwent  an  initial  28‐day  Unconfined  Compressive  Strength  (“UCS”)  test  with  results 

surpassing the targeted high‐strength Backfill of 1.5 MPa outlined in the initial mine design  in the Preliminary Economic Assessment.

Geotechnical Study 

  • Conventional long‐hole stoping mining method confirmed. 
    • The geotechnical assessment supports the conventional long‐hole stoping mining method including the use of longitudinal and transverse stopes, 30 m level spacing, and the nominal stope strike length of 15 m to 30 m. This represents an excellent stope stability range for underground mining in competent conditions.
  • Hydraulic conductivity consistent with that predicted in basement rocks. 
    • The hydrogeological study measured hydraulic conductivity. Results were as predicted given mineralization is completely hosted in the  crystalline basement rocks. Conductivity which measures the presence of water, decreases with depth and is expected to be lowest at depths associated with mine workings.

Underground Tailings Management Facility is displayed in Figure 1 below.

Development, Activities & Financial

  • Pre‐feasibility  staged  technical  studies  including  geotechnical  work,  hydrogeological  work,  and metallurgy continue in advance of the updated Mineral Resource Estimate and maiden Pre‐Feasibility 

Study scheduled for the end of Q3 / early Q4 2018. 

  • A summer drilling program is in the final stages of preparation and will begin imminently.
  • The Company has cash on hand of approximately ~$145 million.

Troy  Boisjoli,  Vice‐President,  Operations  and  Project  Development,  commented:  “Results  from  the metallurgical  study  demonstrate  high  recovery  of  uranium  during  the  leaching  and  optimized  solvent extraction process. Furthermore, positive results from Paste‐Backfill test work has confirmed proof of concept for potential application of an underground tailings management facility. In addition to responsible tailings management,  mixing  tailings  with  cement  and  depositing  it  back  underground  will  facilitate  ongoing  and continued reclamation while in operation. Geotechnical results have confirmed the nature of the basement‐ hosted Arrow Deposit can support conventional long‐hole stoping mining methods. The hydrogeological study demonstrates  hydraulic  conductivity  is  entirely  consistent  with  that  of  basement‐hosted  deposits  and  is favourable  for  mine  development.  With  every  stage  of  development  NexGen  continues  to  confirm  the robustness of the Arrow Project.”

Leigh Curyer, Chief Executive Officer, commented: “Development studies continue to emphasize the unique technical  characteristics  of  the  Arrow  Project.    These  results  quantify  high  recovery  rates,  non‐detect deleterious  metals  and  competency  of  the  basement  rocks.    The  maiden  Pre‐Feasibility  Study  which  will incorporate an updated Mineral Resource Estimate is on schedule for release at end of Q3 or early Q4.  In the interim,  the  summer  2018  drilling  program  will  commence  imminently  which  will  continue  to  focus  on determining  the  overall  scale  of  Arrow  and  near‐Arrow  mineralization  as  well  as  further  define  site characterization for development.”

Study Details:  

Bench‐Scale Metallurgical Study:

Wood PLC (formerly AMEC Foster Wheeler) approved selected drill core samples and interpreted the results. The  bench‐scale  metallurgical  samples were  analyzed  by the  Saskatchewan  Research  Council  Laboratories (“SRC”), pilot‐scale metallurgical testing is ongoing.

Thirteen  composite  samples  were  prepared  from  the  crushed  core  assay  rejects  and  used  for leaching/QEMSCAN/acid  generation  (PAG)/tailings  preparation  for  paste  backfill  tests.  The  samples  were blended and homogenized in a mixer to prepare the composite sample.

Paste‐Backfill Testing:

  • Testing six varying compositions of representative uranium tailings combined with binder underwent an initial 28‐day UCS testing. The most successful of the mixtures came from sample M6, this mixture combined 61.01% uranium tailings with a resulting 2.15 MPa from UCS testing, surpassing the targeted high‐strength Backfill of 1.5 MPa.

Modal mineralogy analysis:

  • QEMSCAN  analyses  on  the  Medium  Grade  (“MG”)  composite  and A1  to  A5  individual  shear  zone samples indicate that uraninite was present as fresh and altered uraninite. No primary Mo‐bearing minerals  were  identified  in  any  samples,  and  all  samples  were  dominated  by  clay  minerals  with uraninite most commonly associated with the clay minerals

Mill work index measurements:

  • Five composite samples were prepared from full diameter NQ core for comminution testing, including SAG mill work index and Bond Ball mill work index “SAGDesinTM tests”. The results categorized the samples as medium hardness materials which indicates standard grinding conditions.

Leaching analysis:

  • Batch leaching on the Medium Grade (“MG”) composite sample (50kg) was performed at baseline conditions to generate adequate quantity of baseline residue and pregnant leach solution (PLS) for the downstream tests. The MG composite sample uranium leaching recovery was 97.6%.

Solvent extraction testing and filtration test:

  • Optimized solvent extraction (“SX”) resulted in 99.6% of U extracted with a phase separation time of 3.1 minutes. The SX testing results on the settling filtrates, which were produced from the settling tests of the leaching slurry at the seven leaching conditions, support optimized leaching conditions for Low Grade, Medium Grade and High Grade samples. Both the U extraction rate (from 98.7% to 99.7%) and the phase separation time (3.7 to 5.9 minutes) were in the expected range.

The Bench‐Scale Metallurgical Study has demonstrated high purity yellowcake product can be produced by using peroxide and MgO. The final product produced yellowcake, meeting or surpassing industry standards.

Geotechnical Study: 

BGC Engineering Inc. (“BGC”) interpreted results from available geotechnical data, including geo‐mechanical property testing completed by SNC Lavalin (Saskatoon, SK) and Golder Associates Ltd. (Burnaby, BC).

Six geotechnical diamond drill holes were completed in the summer of 2017. The holes were designed to characterize the geotechnical and hydrogeological conditions in support of the envisioned Pre‐feasibility study (PFS) mine design, targeting:

  • Life‐of‐mine infrastructure
  • The A2 and A3 shears
  • The crown pillar

The core was logged using the industry standard RMR76 system and Q rating system, and regular point load tests were performed to aid in the determination of intact rock strength. Representative core samples were selected from five of the drill holes and sent to SNC Lavalin (Saskatoon, SK) and Golder Associates Ltd. (Burnaby, BC) for geo‐mechanical properties testing. The testing program included unconfined compressive strength, triaxial strength, and tensile strength tests on rock core samples, direct shear tests on discontinuities, index tests on discontinuity infills and X‐ray diffraction (XRD) tests on rock specimens. On four of the geotechnical holes, 39 downhole packer tests were completed to measure the hydraulic conductivity in various rock units and  along  structures  and  an  acoustic  televiewer  survey  was  performed  to  collect  in‐situ  structural measurements. Vibrating wire piezometers were installed in four of the holes to allow for long‐term monitoring of water pressures in specific intervals.

In addition to the 2017 data, NexGen provided BGC with a geotechnical data set that was collected using the RMR89 system (termed RMR’) and consists of 178 drill holes within or proximal to the Arrow Deposit. BGC interpreted the available data and proposed eight geotechnical domains:

1. Overburden (sand, cobbles, boulders)

2. Cretaceous (siltstone/mudstone/sandstone/coal seams)

3. Devonian (sandstone)

4. Athabasca (sandstone)

5. Paleoweathered basement (gneiss)

6. Faults and shear zones (gneiss, altered gneiss, +/‐ mineralization)

7. Unaltered basement (gneiss)

8. Altered basement (altered gneiss, +/‐ mineralization)

Using a 30 m level height, BGC recommends that transverse stopes have a span of 10 m to 15 m, at a stope strike length of (15 to 30 m) (check this is consistent with the bullet point in highlights, respectively. For longitudinal stopes, stope length is limited by the unsupported walls (minimal level of ground support) ranging from 20 m to 30 m, dependant on location. Stope lengths greater than 20 m to 30 m would utilize cable bolt support in the walls.

BGC Engineering Inc. (“BGC”) interpreted results from data collected on site by NexGen Energy personnel.

BGC estimated the hydraulic conductivity of the crystalline basement rock from data obtained from the 31 packer tests performed on the geotechnical diamond drill holes.

The hydrogeological investigation indicates the Arrow Deposit has basement hydraulic conductivity values ranging from 5.2x10‐10 to 1.7x10‐6 m/s. These values are typical of metaphoric, crystalline basement rock.

About NexGen

NexGen is a British Columbia corporation with a focus on the acquisition, exploration and development of Canadian uranium projects. NexGen has a highly experienced team of uranium industry professionals with a successful track record in the discovery of uranium deposits and in developing projects through discovery to production.

NexGen owns a portfolio of prospective uranium exploration assets in the Athabasca Basin, Saskatchewan, Canada, including a 100% interest in Rook I, location of the Arrow Deposit in February 2014, the Bow discovery in March 2015, the Harpoon discovery in August 2016 and the Arrow South discovery in July 2017. The Arrow deposit's updated mineral resource estimate with an effective date of December 20, 2016 was released in March 2017, and comprised 179.5 M lbs U3O8 contained in 1.18 M tonnes grading 6.88% U3O8 in the Indicated Mineral Resource category and an additional 122.1 M lbs U3O8 contained in 4.25 M tonnes grading 1.30% U3O8 in the Inferred Mineral Resource category.

Leigh Curyer Chief Executive Officer  NexGen Energy Ltd.

+1 604 428 4112 [email protected] www.nexgenenergy.ca

Travis McPherson  Vice President Corporate Development  NexGen Energy Ltd. 

+1 604 428 4112 [email protected] http://www.nexgenenergy.ca

For Media Inquiries: 

Jonathan Goldberg  KCSA Strategic Communications

+1 212 896 1282 [email protected]

Technical Information

Natural gamma radiation in drill core reported in this news release was measured in counts per second (cps) using a Radiation Solutions Inc. RS‐120 gamma‐ray scintillometer. The reader is cautioned that total count gamma readings may not be directly or uniformly related to uranium grades of the rock sample measured; they should be used only as a preliminary indication of the presence of radioactive minerals.

Split  core  samples  will  be  taken  systematically,  and  intervals  will  be  submitted  to  SRC  Geoanalytical Laboratories (an SCC ISO/IEC 17025: 2005 Accredited Facility) of Saskatoon for analysis. All samples sent to SRC will be analyzed using ICP‐MS for trace elements on partial and total digestions, ICP‐OES for major and minor elements on a total digestion, and fusion solution of boron by ICP‐OES. Mineralized samples are analyzed for U3O8 by ICP‐OES and select samples for gold by fire assay. Assay results will be released when received and after stringent internal QA/QC protocols are passed.

All scientific and technical information in this news release has been prepared by or reviewed and approved by Mr. Troy Boisjoli, Geoscientist Licensee, Vice President – Operations & Project Development for NexGen. Mr. Boisjoli is a qualified person for the purposes of National Instrument 43‐101 Standards of Disclosure for Mineral  Projects  ("NI  43‐101"),  and  has  verified  the  sampling,  analytical,  and  test  data  underlying  the information or opinions contained herein by reviewing original data certificates and monitoring all of the data collection protocols.

For details of the Rook I Project including the quality assurance program and quality control measures applied and key assumptions, parameters and methods used to estimate the mineral resource please refer to the technical report entitled "Technical Report on the Preliminary Economic Assessment of the Arrow Deposit, Rook 1 Property, Province of Saskatchewan, Canada" dated effective September 1, 2017 (the "Rook 1 Technical Report") prepared by Jason J. Cox, David M. Robson, Mark B. Mathisen, David A. Ross, Val Coetzee and Mark Wittrup, each of whom is a "qualified person" under NI 43‐101. The Rook I Technical Report is available for review under the Company's profile on SEDAR at www.sedar.com.

U.S. investors are advised that while the terms "indicated resources" and "inferred resources" are recognized and required by Canadian regulations, the U.S. Securities and Exchange Commission does not recognize these terms. U.S. investors are cautioned not to assume that any part or all of the material in these categories will ever be converted into mineral reserves.

Forward‐Looking Information

The information contained herein contains "forward‐looking statements" within the meaning of the United  States Private Securities Litigation Reform Act of 1995 and "forward‐looking information" within the meaning  of  applicable Canadian  securities  legislation.  "Forward‐looking  information"  includes,  but  is  not  limited  to,  statements with respect to the activities, events or developments that the Company expects or anticipates will  or may occur in the future. Generally, but not always, forward‐looking information and statements can be  identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates",  "forecasts", "intends", "anticipates", or "believes" or the negative connotation thereof or variations of such  words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be  taken", "occur" or "be achieved" or the negative connotation thereof. 

Forward‐looking information and statements are based on the then current expectations, beliefs, assumptions,  estimates and forecasts about NexGen's business and the industry and markets in which it operates. Forward‐ looking information and statements are made based upon numerous assumptions, including among others,  that the proposed transaction will be completed, the results of planned exploration activities are as anticipated,  the price of uranium, the cost of planned exploration activities, that financing will be available if and when  needed and on reasonable terms, that third party contractors, equipment, supplies and governmental and other  approvals required to conduct NexGen's planned exploration activities will be available on reasonable terms  and in a timely manner and that general business and economic conditions will not change in a material adverse  manner. Although the assumptions made by the Company in providing forward looking information or making  forward looking statements are considered reasonable by management at the time, there can be no assurance  that such assumptions will prove to be accurate. 

Forward‐looking information and statements also involve known and unknown risks and uncertainties and  other factors, which may cause actual results, performances and achievements of NexGen to differ materially  from  any  projections  of  results,  performances  and  achievements  of  NexGen  expressed  or  implied  by  such  forward‐looking  information  or  statements,  including,  among  others,  negative  operating  cash  flow  and  dependence on third party financing, uncertainty of the availability of additional financing, the risk that pending  assay  results  will  not  confirm  previously  announced  preliminary  results,  imprecision  of  mineral  resource  estimates, the appeal of alternate sources of energy and sustained low uranium prices, aboriginal title and  consultation issues, exploration risks, reliance upon key management and other personnel, deficiencies in the  Company's title to its properties, uninsurable risks, failure to manage conflicts of interest, failure to obtain or  maintain required permits and licenses, changes in laws, regulations and policy, competition for resources and  financing, and other factors discussed or referred to in the Company's Annual Information Form dated March  31, 2017 under "Risk Factors". 

Although the Company has attempted to identify important factors that could cause actual results to differ  materially from those contained in the forward‐looking information or implied by forward‐looking information,  there may be other factors that cause results not to be as anticipated, estimated or intended. 

There can be no assurance that forward‐looking information and statements will prove to be accurate, as actual  results and future events could differ materially from those anticipated, estimated or intended. Accordingly,  readers  should  not  place  undue  reliance  on  forward‐looking  statements  or  information.  The  Company  undertakes no obligation to update or reissue forward‐looking information as a result of new information or  events except as required by applicable securities laws.  

SOURCE NexGen Energy Ltd.