Saturday, October 17, 2026
MiningNewsTerminal
Saturday, October 17, 2026 Admin

NUAG.TO ·

Table 1 – As Notes: 1. True w directio 2. Drill loc In additi o approxim metallurg QUALITY HQ‐size d between town loca facility in

Metallurgy & Processing

NEWS REL LEASE  

Trading Sy ymbol:    TSX‐ ‐V: NUAG OTCQ QX: NUPMF 

NEW PA ACIFIC INTER RCEPTS 282.01 1 METRES OF F MINERALIZA ATION GRAD DING 104 GRA AMS PER TON NNE  SILVER FRO OM THE SILVER SAND PRO OJECT METAL LLURGICAL DRILLING PROGRAM 

Vancouve er, British Col lumbia – July

y 13, 2020 – N New Pacific M Metals Corp. ( (TSX‐V: NUAG G) (OTCQX: NU UPMF) he assay resu (“New Pacific” or the “Company”) is pleased to

  • announce th ults from the e four in‐fill d drilling

holes  at  the  Silver  Sa and  Project.    Holes  were e  drilled  to  o obtain  repres sentative  sam mples  for  de etailed metallurg gical work req quired by a Preliminary Eco onomic Asses ssment (PEA) study.

gical holes, as summarized in Table 1  below, comp pare favourably to Assay results from the ese metallurg by  holes  in  intervals  and those  pre eviously  rele eased  near‐b d  silver  grad des  and  furt ther  demons strate continuity y of silver mineralization.   Highlight of f the results i includes 282.01 m interse ection grading 104 g/t silver in hole DSS52 25021T.

Table 1 – As ssay results for t the metallurgica al drill holes at S Silver Sand 

Met HoleFrom (m)To (m)Interval(m)Ag (g/t)
DSS422501T72.64143.9671.32149
DSS522501T65.78187.70121.92180
DSS525021T6.90288.91282.01104
DSS642501T23.28128.40105.12152

Notes:

1. True w width is estimate ed at 80% of dr rill intercepts ba ased on the cur rrent understand ding of the rela ationship betwee en drill directio on and mineraliz zed structures.

2. Drill loc holes provided in Table 2.

cation, azimuth and dip of drill h

In  additio on,  the  Com mpany  has  a also  develop ped  a  comp posting  and  sampling  pr rogram  to  c collect approximately  1,500  k kg  of  drill  co ore  and  coars se  reject  sam mples  from  p previous  drilling  campaign ns  for metallurg gical testing.

QUALITY ASSURANCE AND QUALIT TY CONTROL

th an average HQ‐size drill core samp ples are split into equal ha alves by diam mond saw, wit e sample leng gth of between  one to one a and a half metres at the  Company’s c core processing facility in  Betanzos, a  small town  loca ated  20  kilom metres  from  the  project  s site.    Half  co ore  samples  a are  stored  in n  a  secure  storage facility  in  Betanzos  fo or  future  refe erence,  with  the  other  ha alf  shipped  in  securely  se ealed  bags  to

  • ALS

Global  in  Oruro,  Boliv via  for  preparation,  and  A ALS  Global  in n  Lima,  Peru for  geochem mical  analysis

s.    All samples a are first analyzed by a multi‐element  ICP package (ALS code M ME‐MS41) wi ith ore grade e over limits  for  silver,  lead  and  zinc  further  analyzed  using  ALS  code  OG46.    Further  silver  over  limits  are analyzed by gravimetric analysis (ALS code of GRA21).

A standard quality assurance and quality control (“QAQC”) protocol is employed to monitor the quality of sample preparation and analysis.  Standards of certified reference materials and blanks are inserted into the normal core sample sequences prior to  shipping to the  lab at a ratio of 20:1 (i.e.,  every 20 samples contain at least one standard sample and one blank sample).  In general, duplicate samples of coarse rejects at a ratio of 20:1 are sent to a second internationally accredited lab for check analysis. The assay results of QAQC samples of standards and blanks do not show any significant bias of analysis or contamination during sample preparation.

Technical information contained in this news release has been reviewed and approved by Alex Zhang, P. Geo., Vice President of Exploration, who is a Qualified Person for the purposes of NI 43‐101.

About New Pacific  

New Pacific is a Canadian exploration and development company which owns the Silver Sand Project in Potosí Department, Bolivia and the Tagish Lake gold project in Yukon, Canada.

For further information, contact: 

New Pacific Metals Corp.

Gordon Neal President Phone:  (604) 633‐1368 Fax:   (604) 669‐9387 [email protected] www.newpacificmetals.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the  TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. 

CAUTIONARY NOTE REGARDING FORWARD‐LOOKING INFORMATION 

Certain of the statements and information in this news release constitute “forward‐looking information” within the  meaning of applicable Canadian provincial securities laws. Any statements or information that express or involve  discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future  events  or  performance  (often,  but  not  always,  using  words  or  phrases  such  as  “expects”,  “is  expected”,  “anticipates”, “believes”,  “plans”,  “projects”,  “estimates”,  “assumes”,  “intends”,  “strategies”,  “targets”,  “goals”,  “forecasts”, “objectives”, “budgets”, “schedules”, “potential” or variations thereof or stating that certain actions,  events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative of any  of  these  terms  and  similar  expressions)  are  not  statements  of  historical  fact  and  may  be  forward‐looking  statements or information.  

Forward‐looking statements or information are subject to a variety of known and unknown risks, uncertainties and  other  factors  that  could  cause  actual  events  or  results  to  differ  from  those  reflected  in  the  forward‐looking  statements or information, including, without limitation, risks relating to: fluctuating equity prices, bond prices,  commodity prices; calculation of resources, reserves and mineralization, foreign exchange risks, interest rate risk,  foreign investment risk; loss of key personnel; conflicts of interest; dependence on management and others.   

This  list  is  not  exhaustive  of  the  factors  that  may  affect  any  of  the  Company’s  forward‐looking  statements  or  information.  Forward‐looking  statements  or  information  are  statements  about  the  future  and  are  inherently  uncertain, and actual achievements of the Company or other future events or conditions may differ materially from  those reflected in the forward‐looking statements or information due to a variety of risks, uncertainties and other  factors, including, without limitation, those referred to in the Company’s Annual Information Form for the year  ended June 30, 2019 under the heading “Risk Factors”. Although the Company has attempted to identify important  factors that could cause actual results to differ materially, there may be other factors that cause results not to be as  anticipated, estimated, described or intended. Accordingly, readers should not place undue reliance on forward‐ looking statements or information.   

The Company’s forward‐looking statements or information are based on the assumptions, beliefs, expectations and  opinions of management as of the date of this news release, and other than as required by applicable securities  laws,  the  Company  does  not  assume  any  obligation  to  update  forward‐looking  statements  or  information  if  circumstances or management’s assumptions, beliefs, expectations or opinions should change, or changes in any  other events affecting such statements or information. For the reasons set forth above, investors should not place  undue reliance on forward‐looking statements or information.

CAUTIONARY NOTE TO US INVESTORS 

This news release has been prepared in accordance with the requirements of NI 43‐101 and the Canadian Institute  of Mining, Metallurgy and Petroleum Definition Standards, which differ from the requirements of U.S. Securities  laws.  NI 43‐101 is a rule developed by the Canadian Securities Administrators that establishes standards for all  public disclosure an issuer makes of scientific and technical information concerning mineral projects 

Table 2 – Location, azimuth and dip of metallurgical drill holes and the original twinned holes 

Hole ID _EastingNorthingElevationLength (m)Azimuth (°)Dip (°)
DSS422501T234816.417857102.124107.90151.7060‐45
DSS522501T234865.917856554.704079.18211.7060‐45
DSS525021T234577.947856362.004051.04292.8050‐47
DSS642501T234817.797855836.814021.52142.7060‐45

Note:  Coordinate system is WGS84, UTM20 South.