Saturday, October 17, 2026
MiningNewsTerminal
Saturday, October 17, 2026 Admin

PHNM.V ·

Latest Metallurgical Test Results Exceed 95% Vanadium Extractio n from Cornerstone Metals Inc.’s Carlin Vanadium Project

Metallurgy & Processing

June 20, 2018 ‐ Vancouver, British Columbia – Cornerstone Metals Inc. (TSX‐V: CCC) (OTCQB: CCCCF)  (FSE: 1PY) (“Cornerstone” or the “Company”) is pleased to announce additional preliminary results of metallurgical test work being conducted on its Carlin Vanadium  Project in Nevada. The third round of testing has achieved vanadium extraction levels of 95.5%.

“Our testing has very quickly moved the needle from the low 80’s, which were strong, to outstanding numbers,  far  exceeding  even  our  metallurgists’  expectations”,  said  Cornerstone  President  and  Chief Executive Officer Paul Cowley. “These numbers show a clear sign of a major technical breakthrough for our project.”

Test work continues on a sample composite generated from an 18.9 metre drill core intercept from the Company’s  recent  diamond  drilling  verification  program  on  the  deposit.  The  latest  results  employed  a roast/leach/pressure oxidation approach. Ongoing test work will continue to optimize various parameters with the aim of developing a conceptual flowsheet. Once a conceptual flowsheet has been defined, tests will  be  run  across  the  deposit  on  a  full  range  of  samples.  The  tests  to  date  have  been  conducted  to demonstrate  potential  recoveries.  At  this  stage,  there  is  no  suggestion  that  these  tests  demonstrate economic viability.

Metallurgical test work continues at Sherritt Technologies in Fort Saskatchewan, Alberta, the leader in the development and commercialization of pressure hydrometallurgical processes. Sherritt is a one‐stop shop that  has  a  proven  track  record  of  developing  projects  from  concept‐to‐operation  with  a  skilled  and experienced team, including process and equipment specialists.

The Carlin Vanadium deposit is considered one of the largest, highest grade primary vanadium deposits in North America (USGS Professional Paper 1802 Critical Mineral Resources of the United States—Economic and Environmental Geology and Prospects for Future Supply dated December 18, 2017).

Vanadium’s Growing Importance for Steel Manufacturing and the Energy Sector 

Vanadium  is  growing  in  importance  for  key  industrial  manufacturing  sectors  most  notably  steel  and renewable energy. Today, more than 85 percent of the world’s vanadium is used in steel manufacturing applications. Its importance to the energy sector is also growing rapidly with more than 10 percent of vanadium production used in energy storage where its substantial cost and performance benefits make it an alternative choice to lithium ion in several areas. Vanadium pentoxide flake prices have risen over the last 2.5 years from under US$3/lb to US$15.7/lb today.

About Cornerstone Metals Inc. 

Cornerstone Metals has an option to earn a 100% interest in the Carlin Vanadium Project, located in Elko County  22km  by  road  (14  miles)  from  the  town  of  Carlin,  Nevada.  The  project  is  comprised  of  72 contiguous unpatented mineral claims totaling 461 hectares (1,140 acres). The Carlin Vanadium Project hosts  the  Carlin  Vanadium  Deposit  which  is  flat  to  shallow  dipping  and  at  shallow  depths,  commonly between 0‐60m (0‐200 ft) below surface.

ON BEHALF OF CORNERSTONE METALS INC.  

per: "Paul Cowley"

CEO & President (604) 340‐7711 [email protected]

Technical  disclosure  in  this  news  release  has  been  reviewed  and  approved  by  Paul  Cowley,  P.Geo.,  a  Qualified Person as defined by National Instrument 43‐101, and President and CEO of the Company. 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of  the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward‐looking information

Certain statements in this news release constitute "forward‐looking" statements. These statements relate  to  future  events  or  the  Company's  future  performance  and  include  the  Company’s  ability  to  meet  the  conditions required to exercise in full its option to acquire the Carlin Vanadium project and with respect to  current  and  planned  drill  programs,  the  results  of  exploration  programs,  metallurgical  test  work,  and  changes  in  mineral  resources.  All  such  statements  involve  substantial  known  and  unknown  risks,  uncertainties and other factors which may cause the actual results to vary from those expressed or implied  by  such  forward‐looking  statements.  Forward‐looking  statements  involve  significant  risks  and  uncertainties, they should not be read as guarantees of future performance or results, and they will not  necessarily be accurate indications of whether or not such results will be achieved. Actual results could  differ  materially  from  those  anticipated  due  to  a  number  of  factors  and  risks.  Although  the  forward‐ looking statements contained in this news release are based upon what management of the Company  believes  are  reasonable  assumptions  on  the  date  of  this  news  release,  the  Company  cannot  assure  investors that actual results will be consistent with these forward‐looking statements. The forward‐looking  statements contained in this press release are made as of the date hereof and the Company disclaims any  intention or obligation to update or revise any forward‐looking statements whether as a result of new  information, future events or otherwise, except as required under applicable securities regulations.